Information

  • QUARTER MILE QUALITY CONTROL REPORT

  • Document No.

  • NJSDA

  • Conducted on

  • Prepared by

  • QUARTER MILE ES JOBSITE

BRIDGETON QUALITY CONTOL

ACTIVITY REVIEWED

LOCATION OF MATERIALS

RELATED SPECIFICATION

QCM TEAM MEMBERS REQUIRED

INSTALLATION READINESS

  • WORK SITE READY FOR INSTALLATION?

  • ENVIRONMENTAL FACTOR RELEVANT?

  • SURVEY & MEASUREMENT CHECKED FOR COMPLIANCE

  • INSTALLATION IN SEQUENCE WITH THE PROJECT SCHEDULE

MATERIAL ASSESSMENT

TESTING & INSPECTION FIRM REPORTING

WORKMANSHIP

TEMPORARY FACILITIES AND TEMPORARY PROTECTION

  • SET LIMITS OF CONSTRUCTION AND SAFETY FOR OCCUPANTS

  • OWNER NOTIFIED OF PLNNED ACTIVITIES

  • TEMPORARY PROTECT MAINTAINED AND WELL DEFINED

  • CONSTRUCTION ACTIVITIES IMPEDING EGRESS<br>

  • SAFE EGRESS PLAN IN PLACE AND OPERATIONAL

  • CLEAN TOILET AND WATER FACILITIES AVAILABLE

FLAG AS NON -COMPLIANT

  • PRODUCT DOES NOT MEET SPECIFICATION

  • PRODUCT NOT SUITABLE FOR INTENTEDED APPLICATION?

  • CORRECTIVE ACTION REQUIRED?

  • CORRECTIVE METHOD EMPLOYED

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.