Information
-
Document No.
-
Construction Site (Main Shipyard or Subcontractor)
-
Location
-
Hull Number
- HN2800
- HN2801
-
Area On Board
-
Conducted on
-
Who did you observe?
-
Member Conducting Observation
- Omiros Angelidis
- Konstantinos Papamarkos
- Konstantinos Pantos
- Dimitris Kalogeropoulos
- Antonia Pagiaziti
- Stavros Bikakis
- SH Kim
- Michalis Psarros
- SS Song
- JY Eom
- Achilleas Proios
- JH OK
- HD Lim
- HJ Kwon
- DH Kim
- JS Ban
- JS Park
- YH Lee
- JY Yang
-
Sign Please
Daily Walkthrough
Positive Observation
-
What type of positive observation did you observe?
Unsafe Observation
-
What type of Unsafe Observation did you observe?
- Access & Walkways
- Scaffolding
- Working at Heights
- Enclosed Space
- Ventilation
- Lighting
- Electrical
- Heating/Cooling
- Power Driven Tools
- PPE
- Supervision
- Housekeeping
- LOTO
- Emergency Preparedness
- Guards & Barriers
- Mechanical & Elevated Platforms
-
Please include the associated picture
-
Reasonable Foreseeable Outcome of a potential Accident
-
Immediate Corrective Action
-
If Corrected on the Spot please provide Associated Picture
-
Long Term Corrective Action