Information
-
Audit Title: Daily safety check
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel: Marcia Kelly
Daily reviews
-
ALL NON-CONFORMANCES TO BE PHOTOGRAPHED
-
Is Housekeeping being maintained by contractors to a level acceptable by Halikos
-
Housekeeping in and around office areas, crib and ablutions is maintained to an acceptable standard
SAFETY
-
All power tools and leads are under current test and tag
-
All personnel signed onto SWMS
-
Individual subcontractors are maintaining electrical safety
-
Hand tools are all fit for purpose
-
Heavy Plant and equipment is being operated correctly with pre starts completed
-
Barricades and fences are installed as required and in good condition
-
Excavation is done under permit as required with correct controls and checks completed
-
Straight ladders are used for access / egress only, are footed and tied at the top with a 1m extension past the top step off / step on point
-
Plant operators have relevant license or tickets
-
Fire protection is located and used around the site as required.
-
PPE is being used as required by all personnel onite
-
Other safety equipment IE spill kits, eye wash bays are available
-
Live edges, voids and penetrations are identified and protected to safe levels
-
Hazardous substances are being used according to SWMS and SDS and SEQ has been notified in advance
-
Have any corrective actions or non conformances been closed today
-
Reportable Incidents
-
Other observations Including Rain Gauge
-
SEQ