Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Personnel

Small Pool

  • Check thermostat before entry to plant room. Set dial to 23 it should "click"

  • Ensure waste is disposed of properly and is not accumulating

  • All fire exits routes clear from obstruction

  • Fire doors operating correctly

  • Does current CO2 bottle still have supply?

  • How many empty CO2 bottles are there?

  • Is the PH controller in good working order?

  • Does the current PAC still have supply?

  • How many full PAC containers are left?

  • Any empty PAC containers are left?

  • Is the depetrol set at the correct set point? (free chlorine1.4 PH 7.4)

  • Photograph readings on display

  • Is the day tank filled up? If not fill. What time filled?

  • Are there some remaining full carboids?

  • Is the boiler operating correctly at correct pressure and temperature?

  • Are the heat exchangers operating and heated water rejoining with the pool return?

  • Are eye wash kits available, fully stocked and in date?

  • Is PPE available, clean and stored correctly?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.