Project Information
-
Project No:
-
Description of works:
-
Client Name:
-
Site address / Location:
-
PICW Name:
-
PICW Contact No.:
-
Date:
-
Completed by:
SECTION A
-
Identify Work Activity and Implement Control Measures Documented in Safe Work Method Statement & Work Instructions (Review hazards and control measures as site and / or conditions change)
-
SAFE WORK METHOD STATEMENTS (Select all applicable SWMS)
- 001 Working at Height
- 002 Working with Asbestos
- 003 Working in Confined Space
- 004 Dig & Excavate
- 005 Working on or near Road and Rail
- 006 Elevated Work Platform
- 007 Crane Operations
- 008 Operating Mobile Plant Equipment and Vehicles
- 009 Testing and Commissioning
- 010 Working on HV Apparatus
- 011 Working on LV Apparatus
- 012 Helicopter Powerline Works
- 013 Switching Operations
- 014 Demolition of Tx Towers
- 015 Tilt-up & Concrete Precast Works
- 016 Directional Drilling
- 017 Working with Crystalline Silica
-
ADDITIONAL / SUBCONTRACTOR SWMS
-
SWMS Name:
-
SAFE WORK PRACTICE (SWP) (Select all applicable SWP)
- 001 Manual Handling & Hazardous Manual Tasks
- 002 Hazardous Substances
- 003 Operate Powered Hand Tools
- 004 Perform Hot Work
- 005 Operate Vacuum Excavation / Sucker Truck
- 006 Load Restraint
- 007 Pole Delivery
- 008 Pole Transport Jinker Trailer
- 009 Pole Assembly
- 010 Dressing Power Poles
- 011 Pole Erection
- 012 Install Conduit and Cable Laying
- 013 Apply & Remove Portable Earthing Devices
- 014 HV Pole Insulator Washing / Apply Powersil Tx Insulators
- 015 Chainsaw Operations
- 016 Concrete Cutting
- 017 Compressed Air
- 018 All Terrain Vehicle (ATV) Operations
- 019 Lifting Operations Using an Excavator
- 020 General Yard Duties
- 021 Straining, Bridging and Clamping Conductors
- 022 Distribution Stringing and Tension Overhead Conductors
- 023 Pole Inspection and Assessment
- 024 Replace HV Termination Crossarm (De-energised)
- 025 Install Maintain LV Overhead Equipment (De-energised)
- 026 Safely Towing of a Trailer
- 027 Streetlight Installation and Maintenance
- 028 Site Restoration / Reinstatement Works
- 029 Safe Approach and Touch Tests
- 030 Location of Underground Assets
- 031 Cable Jointing - De-energised
- 032 Installation of Kiosk
- 033 TX Installing Liners
- 034 TX Relief Drilling & Fracturing
- 035 TX Installation of Tx Earthing Straps
- 036 TX Operating Wire Reclaimer
- 037 TX Pole Foundations
- 038 Oil Replacement for Transformer
- 039 Cable ID Spiking De-Energised Cable
SECTION B
-
Risk Matrix
- Work Activity Sequence
-
Activity:
-
Inherent Risk:
- Low 1
- Low 2
- Low 3
- Low 4
- Low 5
- Medium 6
- Medium 7
- Medium 8
- Medium 9
- Medium 10
- Medium 11
- Medium 12
- Medium 13
- High 14
- High 15
- High 16
- High 17
- High 18
- High 19
- Critical 20
- Critical 21
- Critical 22
- Critical 23
- Critical 24
- Critical 25
-
Potential Hazards:
-
Control Measures:
-
Residual Risk:
- Low 1
- Low 2
- Low 3
- Low 4
- Low 5
- Medium 6
- Medium 7
- Medium 8
- Medium 9
- Medium 10
- Medium 11
- Medium 12
- Medium 13
- High 14
- High 15
- High 16
- High 17
- High 18
- High 19
- Critical 20
- Critical 21
- Critical 22
- Critical 23
- Critical 24
- Critical 25
SECTION C: TRAFFIC CONTROL
-
Traffic Control
-
Traffic Control Plan No.:
-
SWMS & TC Licences Sighted
-
Level 2 Licence Holder Name & No:
-
Setup Time:
-
Initials:
Periodic Checks
-
Checked Time:
-
Initials:
SECTION D: WORK PERMITS / ISOLATIONS
Work Permits
-
Select all that apply:
- Not Applicable
- Working at Heights
- Excavation
- Confined Space
- Isolation
- Traffic Control
- Track Protection
- Other
Other:
-
Work Permit:
LV Isolation
-
LV Isolation
-
Forward Time:
-
Reverse Time:
-
Switching No.:
-
Signature:
HV Isolation
-
HV Isolation
-
Forward Time:
-
Reverse Time:
-
Switching No.:
-
Signature:
SECTION E: GROUND DISTURBANCE WORKS
-
1) Is there a requirement for Ground Disturbance / Excavation Works?
-
2) Are relevant DBYD / known service-utility drawings available onsite and have been reviewed?
-
3) Have all known services been marked out / positively identified using non-destructive potholing?
SECTION F & G
SECTION F
-
Name and signature indicates pre-start job briefing conducted, and I understand the job and my role, and I am aware of all potential job hazards and required control measures including emergency preparedness and response.
Sign-off
-
Name and Signature
-
Role
- PICW
- LW
- ST
- PO
- TA
- SO
- APP
- VIS
- TC
- Other
-
Other Role:
SECTION G: TRANSFER OF ROLE/S
-
This section is to be completed if the above roles shift or change during the task.
Role Change
-
Role:
- PICW
- LW
- ST
- PO
- TA
- SO
- APP
- VIS
- TC
- Other
-
Other Role:
-
Acknowledgement of change (Original role holder)
-