Title Page
-
Site Name
-
Address
-
Date and Time of Inspection
-
Company
-
Prepared by
General Information
-
Was the MER in good overall condition with no issues?
-
Please give details
-
List MER non conformances
-
Was the electrical system tested? (Shared Access Common board(s) only)
-
Please attach Inspection Certificate
-
Has the system been tested and passed within the last 5-years?
-
Please advise on current plan to undertake Electrical Testing
-
Please advise why electrical testing is not applicable
-
Date of previous inspection
-
Does the MER have a Fire Suppression system ?
-
Was the fire suppression system tested?
-
Please attach certificate
-
Please advise on the status of the fire suppression system
-
Please advise on the status of the fire suppression system
-
-
Has the air conditioning been FGAS tested?
-
When was the air conditioning last tested?
-
Please attach certificate
-
Please advise on the status of the FGAS certification for this site
-
Was the lighting tested?
-
Please advise
Maintenance Visit Report
1 - Site Access
-
Please include pictures of the access route to the MER
-
1.1 - Can the site be accessed following the access route shown on the drawings/instructions given by Shared Access?
-
Please provide details of any amendments required.
-
1.2 - Is there adequate lighting and emergency lighting along the access route?
-
1.3 - Is the access route to the MER clear of obstacles?
-
1.4 - General Comments
2 - MER
-
2.1 Provide a sketch of the MER layout
-
2.2 Which operators are connected to the system?
- Three
- Vodafone
- EIR
-
Provide Pictures of Three Racks
-
Provide Pictures of Vodafone Racks
-
Provide Pictures of EIR Racks
-
2.3 Which technologies are connected into the DAS ?
-
2.4 General Comments
3 - DAS (Distributed Antenna System)
-
3.11 What type of DAS system is deployed ?
-
3.1 Which Equipment Vendor is deployed ?
-
3.11Please advise on Equipment vendor
-
3.12 Please provide photographs of the DAS headend
-
3.13 Is the DAS headend in good condition ?
-
3.14 Please advise on non-conformances
-
Please attach photographs
-
3.2 How many DAS Sectors are deployed ?
-
3.3 Is the system SISO or MIMO
-
3.4 How many RRUs (Radio Remote Units) are deployed ?
-
3.41 Please provide Photographs of the RRU locations
-
3.42 Are the RRUs in good condition
-
Please advise of non- conformances
-
Please attach photographs
-
3.5 General Comments
-
Which Equipment Vendor is deployed
-
Please advise on Equipment Vendor
-
3.3 Please provide photographs of the DAS headend
-
3.4 Is the DAS headend in good condition
-
Please advise on non-conformances
-
Please attach photographs
-
3.6 Is the system SISO or MIMO
-
3.7 How many DAS Sectors are deployed ?
-
3.8 How many antennas or radio heads are deployed?
-
3.9 General Comments
4 - DAS Passive Outreach
-
4.1 How many antennas or radio heads are deployed in accordance with the design
-
4.11 Could all antennas be identified at the time of the inspection
-
Please advise
-
Please include photographs
-
4.12 Please provide pictures of the passive DAS including antennas and cabling
-
4.13 Is the condition and equipment and cabling satisfactory?
-
4.14 Please provide details.
-
Please attach photographs
-
4.2 - General comments
5- Monitoring of the DAS
-
5.1 Is the DAS monitored ?
-
5.11 Who monitors the DAS and have the logs been checked for alarms or errors?
-
Can the DAS be monitored remotely? Give details
6 - Electrical Installation
-
6.1 Please provide pictures of the sub-meter(s) and distribution board(s) - both Operator and Landlord
-
6.11 - Sub meter readings (all operators + landlord):
-
6.2 - Are all devices within the Shared Access distribution board labelled correctly?
-
Please advise on non-conformances
-
Please include photographs
-
6.3 - General comments on the Electrical Installations both in MER and RRU locations( If applicable)
7 - Ancillaries
-
7.1 - Is CCTV installed in the MER?
-
7.11 Is the CCTV operational
-
Please advise
-
How many cameras are installed
-
7.2 - Is there a code lock installed on the MER door?
-
7.21 What type of locking is installed?
-
Have the batteries been replaced?
-
7.3 - Is there an internet connection available in the MER?
-
What type?
-
7.4 - Is a UPS battery backup unit installed?
-
7.41 Is the unit working correctly?
-
7.42 Please advise on UPS status
-
7.42 General comments
8 - Air conditioning
-
8.1 - Is the air conditioning functioning as expected?
-
8.11 - Have the air conditioning filters been cleaned or replaced?
-
8.12 - What temperature is the air conditioning set to?
-
8.2- Is a temperature monitoring unit installed?
-
Is it working correctly?
-
Please provide details.
Photos
Please add any additional photos
-
MER
-