Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Note: on all question sections as well as providing a response you can also provide more details and attach survey photos where applicable.
Customer Information
-
Site Contact Details:
-
Client Account:
-
Site Address
-
Date and Time Survey carried out:
-
Please take a Photo of the Racks within the Data Hall.
Current Data Centre Documentation.
-
Is there an intelligent system being used for change control, hardware planning, adds, moves and changes?
- Yes
- No
-
Is there a current floor plan of the data hall.
-
Are there any Rack layouts, that detail all the current cabling and hardware infrastructure?
- Yes
- No
-
Is there a master patching database that details source to destination patching?
- Yes
- No
Rack A1
-
Add media
-
Please provide dimensions for this Rack.
- 600mm wide x 800mm deep
- 800mm wide x 800mm deep
- 800mm wide x 1000mm deep
- 800mm wide x 1200mm deep.
-
Are there any devices that have been racked away incorrectly to the hot or cold aisle.
- No
- Yes - 1
- Yes - 2
- Yes - 3
- Yes - 4
- Yes - 5
- Yes - 6
- Yes - 7
- Yes - 8
- Yes - 9
- Yes - 10
-
Please take a photo.
-
Are the Power cables from the PDU to the Active devices routed in a tidy manner within this rack?
- Yes
- No
-
Please take a photo.
-
Are the power cables labelled with PDU details?
- Yes
- No
-
What is the current state of the cable patching between the structured cabling patch panels and the active devices within this Rack.
- Bad State - Requires urgent attention
- Moderate State - Requires a small amount of attention.
- Good State - Requires no attention
-
Are the Patch Cables Labelled at both ends of the patch cord?
- Yes
- No
-
Is there sufficient horizontal cable management installed to manage the patch cabling?
- Yes
- No
-
Is there sufficient vertical management to assist patch cabling?
- Yes
- No
-
Provide an estimation of how long it would take to tidy up this rack?
- 1 Engineer - 1 Day
- 2 Engineers - 1 Day
- 3 Engineers - 1 Day
- 4 Engineers - 1 Day
- 1 Engineer - 2 Days
- 2 Engineers - 2 Days
- 3 Engineers - 2 Days
- 4 Engineers - 2 Days
-
Will this rack require additional 1U Horizontal Cable Management as part of the tidy up process?
- No
- Yes - 1
- Yes - 2
- Yes - 3
- Yes - 4
- Yes - 5
- Yes - 6
- Yes - 7
- Yes - 8
- Yes - 9
- Yes - 10
-
Are there any Copper Patch Cords that need replacing due to visible damage?
- No
- Yes - 1
- Yes - 2
- Yes - 3
- Yes - 4
- Yes - 5
- Yes - 6
- Yes - 7
- Yes - 8
- Yes - 9
- Yes - 10
-
Are there any Fibre Patch Cords that need replacing due to visible damage?
- No
- Yes - 1
- Yes - 2
- Yes - 3
- Yes - 4
- Yes - 5
- Yes - 6
- Yes - 7
- Yes - 8
- Yes - 9
- Yes - 10
-
Will the Patch Cords in this Rack require Brady Labels
- Yes
- No
Containment Routes
-
Please take photos of the containment within the Data Hall.
-
Is the current containment to full capacity
-
Is there a requirement for new containment to be installed?
-
Please take a photo of the area that requires containment.
Environmental Notes:
-
Does the data hall have good air flow?
Have all the racks undergone Power down testing?
-
Has the site Undergone Power Down testing?
Have all the racks undergone Failover testing?
-
Has the site undergone Failover testing for acceptance into service?
Support Contact Numbers
-
Add contacts for Personnel that will be in attendance during the tidy up process.
Contact
-
Add the data centre providers site contact details.
-
Other useful Contact Numbers from the data centre.
Would the client be interested in a data centre managed service?
-
Would the client be willing to discuss further the possibility of installing a managed support service into each data centre site?