Title Page
-
Conducted on
-
Prepared by
-
Location
-
Site Safety Inspection
-
JOB NO
AREA SUPERVISOR:
PROJECT:
-
LOCATION:
-
INSPECTION TYPE:
-
Formal
-
Informal
-
FREQUENCY
-
Weekly
-
Monthly
-
Quarterly
-
Other:
-
INSPECTION CONDUCTED BY:
-
Name:
-
Title:
-
Signature:
-
Name:
-
Title:
HAZARD RATING CLASSIFICATIONS:
ALL INSPECTIONS WILL BE RATED ACCORDING TO THE DEGREE OF SEVERITY TO SET PRIORITY OF ACTION
-
ALL “A” HAZARDS IDENTIFIED MUST BE IMMEDIATELY ADDRESSED
-
A Hazard: A condition or practice likely to cause immediate permanent disability, loss of life, or extensive loss of structure, equipment or material and/or reportable environmental release/spill. Requires immediate corrective action as is defined as an imminent hazard. Activity must be discontinued until hazard has been corrected / resolved
-
B Hazard: A condition or act likely to cause moderate injury or illness, resulting in temporary disability, property damage or environmental release/spill that is disruptive but not extensive. An urgent situation, requiring attention as soon as possible
-
C Hazard: A condition or practice likely to cause minor (non-disabling) injury or illness, non-disruptive property damage or minor environmental impact. Not an emergency, however to be addressed without delay
-
O: Outstanding item from previous inspection
PLAN THE INSPECTION:
-
Identify inspection Type and Frequency
-
Review severity classifications
-
Assign specific categories on which to focus efforts when there is more than one person conducting the inspection
-
Confirm access requirements and authorizations for specific areas or processes
PERFORM THE INSPECTION:
-
Identify each element and relative compliance conditions per the Safety Inspection Matrix
-
Record the specific Hazard Class for each observation
-
Record the correction of any unsafe practice or condition observed
-
Assign responsibility for correcting the hazard or unacceptable behaviour
-
Detail any positive interactions with Supervision and Workers as identified through the inspection
-
EXECUTE RESULTS:
-
Communicate the inspection results to Management, Supervision and Workers
-
Assure that all corrective actions from the inspection are completed
DESCRIPTION / OBSERVATION
-
HAZARD RATING
CORRECTIVE ACTION
RESPONSIBILITY
-
COMPLETION DATE
POSITIVE OBSERVATIONS
14.0 REPORTING
-
Copies To:
-
Name:
-
Title:
-
Name:
-
Title:
INSPECTION MATRIX
Project Requirements
-
JHA / POWSEA completed for Task
-
Emergency Response Plan and Procedures posted
-
Workers fit for duty
-
Free from slipping/tripping hazards (mud, ice, water)
-
Safe access/egress of walkways / stairways
-
Adequate task and area lighting
Hot Work
-
Hot Work Permit Complete
-
Check valves and flashback arrestors in place
-
Fuel gases and oxygen stored in accordance with regulation
-
Cylinders secured in the upright position
-
Gauges removed and protective caps in place when not in use
-
Tagging system for unused oxy/fuel equipment employed
-
Flammables removed from hot work areas
-
Welding shield/barrier in place
-
Proper ventilation
-
Areas below are identified by a barrier
-
Slag and spark containment
-
Rod stubs are stored properly
-
Respiratory protection used as required
-
Fire Extinguishers available, charged and inspected
Ladders
-
Suited to task
-
On firm footing
-
Rubber cleats on feet
-
Regulated height/base ratio
-
Secured at top and base
-
One-meter extension at grade
-
No cracks or splices
-
Non-conductive for electrical use
-
Three-point contact employed
-
Doors, stairway/landing not obstructed by ladder(s)
-
Landing clear and level
Elevated Work Platforms
-
Annual certification
-
Operator is trained
-
Pre-inspection completed
-
Function test complete
-
Path of travel has been reviewed (holes, soft spots)
-
Weight of materials and equipment do not exceed manufacturer’s specifications
-
Surface is firm, level and can support the machine weight
-
Fall protection requirements observed
-
No standing on mid-rail/top-rails
-
Spotters used in confined areas properly spaced
-
Piping
-
Safe rigging practices observed
-
Pipe supports are in place and bolted tight and/or welded
-
Pipe is adequately supported throughout
-
Shoes on their supports, spring hangers adjusted
-
Fasteners secured to prevent movement and/or leakage
-
Labels/information is legible and tagged with Equipment ID
-
Lines purged/cleaned prior to hot works
-
In-process work identified
-
Lockout of hazardous systems verified for process work
-
Safety precautions observed for testing (hydro/pneumatic)
Hazard Assessment Audits
-
Does the POWSEA Card represent the task performed
-
Hazards are specific to the task
-
Is there a acceptable control for the hazards
-
Has the Foreman / Supervisor reviewed the POWSEA
-
Does the worker understand the process
-
Is the worker revisiting the POWSEA after breaks or through changes in plan?
Hoisting Equipment & Rigging
-
Work area and path of lift cleared/secured for lifting
-
Weights of lift known
-
Rigging equipment has been inspected / certified (as required)
-
Equipment & rigging rated for lift
-
Softeners applied
-
Rigging applied correctly by competent personnel
-
Safety applied (as required) for angle-adjusted lifts
-
Crane inspection completed
-
Operating within manufacturers limits
-
Rigging & Hoisting checklist completed
-
Critical Lift Plans developed
-
Signaller is identified
-
Proper signals used
-
Blind lifts are using radio communication
-
Tag lines employed for control
Scaffolding
-
Firm level, stable surface
Top and mid-rails
-
Toe boards
-
Acceptable work platform
-
Load rated platform
-
Acceptable access/egress
-
Mud sills in place
-
Outriggers/screw jacks
-
Tagged with daily inspection frequency
-
Compatible hardware used
-
Regulated height/base ratio
-
Wheels blocked or locked
-
All members firmly fastened/secured
-
Housekeeping
-
Good hygiene practices – lunchrooms/offices/toilets
-
General appearance of work areas free of clutter
-
Adequate waste containers throughout
-
Receptacles not overflowing
-
Walkways, entrances and stairwells free from obstructions
-
Materials stored safely and secured from falling
-
Cords/cables stored neatly/overhead
Mobile & Heavy Equipment
-
Pre-Use inspection completed and documented
-
Regular maintenance completed
-
Fire Extinguisher and safety equipment installed/available
-
Backup alarms installed
-
Seat belts available and in use
-
Loads secured during transport
-
Beacon operational and all necessary lights on/working
-
Use of spotter(s) throughout operation (as necessary)
-
Safe operation practices observed
Material Handling/Storage
-
Proper lifting techniques used (≤ 50lbs)
-
Weight of object known
-
Storage/laydown area organized
-
Materials securely stored (free from tipping, rolling or falling)
-
Entrances/exits/walkways not obstructed
-
Signs and delineators available for traffic flow
Hand & Power Tools
-
Worker familiar with use
-
Inspected prior to operation
-
Used in accordance with the manufacturer guidelines
-
Guards are in place
-
Tool has not been modified/altered
-
Line of Fire/Pinch Points observed
-
Electrically grounded
-
Cutting implements sharp
-
PPE
-
Hard hats
-
Eye and face protection
-
Footwear
-
High visibility vests
-
Hearing protection
-
Gloves
-
Protective and reflective clothing
-
Gloves suited to task
Fire Protection/Suppression
-
Extinguishers provided on vehicles/equipment
-
Available near Hot Work operations
-
Available in offices and lunchrooms
-
Fuel/chemical storage areas
-
Smoking limited to designated areas only
-
Fire blankets employed (as necessary)
-
Suitable barricades and flagging erected
Fall Protections/Prevention
-
Fall Protection Plan developed and implemented (as applicable)
-
Workers trained in requirements
-
Equipment is inspected (harness, lanyard, anchor sling, hardware)
-
Labels are clearly marked and legible
-
SRL’s are inspected
-
Control zones are established
-
Handrails/guardrails are in place
-
Floor/roof openings securely covered and identified
-
WHMIS-2015
-
Workers are trained in WHMIS 2015
-
SDS’s are current and immediately available
-
Hazardous products labeled
-
Labels on applicable workplace containers
-
Exposure control plans in place (as required)
-
Workers employing controls (including PPE) in accordance with SDS
Electrical
-
Permit(s) received and reviewed (as required)
-
Properly rated tools and equipment
-
Cords and cables in good condition following inspection criteria and quarterly colour code (grounding assurance)
-
Ground Fault Circuit Interceptors (GFCI) operable
-
Lock-Out procedure in place and observed
-
Zero energy state verified
-
Proper locks/tags utilized
-
Formwork completed
-
Limits of approach observed
Environmental
-
Spill containment kits are sufficient
-
Hazardous material storage
-
Emergency Response Plan includes specifics for spills
-
Environmental Policy is posted
-
Contaminants are stored and disposed of by a licensed carrier (as applicable)
-
Reporting process is known and followed
-
Secondary containment for fuels and lubricants
-
Establish/contain concrete washout areas
-
Control of airborne dusts (as applicable)
-
Maintenance of storm water and runoff
-
Erosion & sediment control
-
Equipment maintenance to limit environmental impacts (leaks)
-
Procedures for working in and around bodies of water