Title Page
-
Site conducted
-
Business unit
-
Conducted on
-
Prepared by RPS
-
Controlled Location
-
Equipment reference number
-
Part 1: To be completed by Schenker Ltd RPS – Handover of controlled area and equipment to Approved Maintenance Company
FACILITY / DEPARTMENT: Gateway/ Air Warehouse Heathrow
MAINTENANCE COMPANY CARRYING OUT WORK:
-
Company Name
-
Company Representative
EQUIPMENT:
-
REASON FOR HANDOVER
-
ID SEEN (take Image of ID)
-
CALL REFERENCE NO:
IDENTIFY KNOWN HAZARDS WITH CONTROLLED AREA OR EQUIPMENT:
-
Schenker Ltd: As a Radiation Protection Supervisor (RPS) of Schenker Ltd, I hereby hand over the controlled area and equipment as above. Information has been exchanged to enable appropriate risk assessment to be made
-
Maintenance Company: As an appointed representative of the Maintenance Company, I accept responsibility of the controlled area and equipment for the reason stated above. Risk assessment will be made using the information provided and Maintenance Company procedures followed
-
Name of Schenker Ltd Radiation Protection Supervisor (RPS):
-
Maintenance Company Representative:
-
Part 2: To be completed by maintenance company representative – Handover of controlled area and equipment to Schenker Ltd. Please tick all applicable categories of work carried out
CATEGORY OF WORK
-
What Type of work is being completed?
-
What is the purpose of the installation of parts
Incident response
-
What was the incident response?
- Hazard Notice Response
- Protocol Changes
- Other
-
As response is other, please enter details
-
Could this work have implications for radiation safety or image quality?
-
Tick all boxes that apply
- Sheilding
- Image quality/ processing
- Interlocks/ exposure termination
- Mechanical/ Electronic/ Scale Cal
- Safety Features/ Warning Devices
- Collimation/ alignemnt/field sizes
- Detector dose/ dose indicator
-
See visit/service report for details
-
Work is completed and the equipment is:
- OPERATIONAL following work as indicated above and, on the visit / service report
- PARTIALLY OPERATIONAL limitations may exist, refer to the visit / service report
- NOT OPERATIONAL and MUST NOT BE USED
Schenker Ltd RPS:
-
Date and Time handed back to Schenker Ltd:
-
Part 3: SCHENKER LTD – Returning equipment to use I confirm that I have been appointed as a competent Schenker Ltd (RPS).
-
I confirm the above Maintenance Company provided information, associated service report and carried out appropriate checks in accordance with the Ionising Radiation Regulations 2017. I confirm all required local procedures have been completed and have reviewed the service report
-
Result of compelted maintenance
- I am satisfied that the equipment is in a satisfactory condition for use in cargo inspection/exposure
- I am NOT satisfied that the equipment is in a satisfactory condition for use in cargo inspection/exposure
-
What are reasons for non-satisfaction?
-
Add actions to this to ensure followed up
-
Schenker Ltd RPS acceptance sign off