Title Page

  • Site conducted

  • Business unit

  • Conducted on

  • Prepared by RPS

  • Controlled Location
  • Equipment reference number

  • Part 1: To be completed by Schenker Ltd RPS – Handover of controlled area and equipment to Approved Maintenance Company

FACILITY / DEPARTMENT: Gateway/ Air Warehouse Heathrow

MAINTENANCE COMPANY CARRYING OUT WORK:

  • Company Name

  • Company Representative

EQUIPMENT:

  • REASON FOR HANDOVER

  • ID SEEN (take Image of ID)

  • CALL REFERENCE NO:

IDENTIFY KNOWN HAZARDS WITH CONTROLLED AREA OR EQUIPMENT:

  • Schenker Ltd: As a Radiation Protection Supervisor (RPS) of Schenker Ltd, I hereby hand over the controlled area and equipment as above. Information has been exchanged to enable appropriate risk assessment to be made

  • Maintenance Company: As an appointed representative of the Maintenance Company, I accept responsibility of the controlled area and equipment for the reason stated above. Risk assessment will be made using the information provided and Maintenance Company procedures followed

  • Name of Schenker Ltd Radiation Protection Supervisor (RPS):

  • Maintenance Company Representative:

  • Part 2: To be completed by maintenance company representative – Handover of controlled area and equipment to Schenker Ltd. Please tick all applicable categories of work carried out

CATEGORY OF WORK

  • What Type of work is being completed?

  • What is the purpose of the installation of parts

† Incident response

  • What was the incident response?

  • As response is other, please enter details

  • Could this work have implications for radiation safety or image quality?

  • Tick all boxes that apply

  • See visit/service report for details

  • Work is completed and the equipment is:

Schenker Ltd RPS:

  • Date and Time handed back to Schenker Ltd:

  • Part 3: SCHENKER LTD – Returning equipment to use I confirm that I have been appointed as a competent Schenker Ltd (RPS).

  • I confirm the above Maintenance Company provided information, associated service report and carried out appropriate checks in accordance with the Ionising Radiation Regulations 2017. I confirm all required local procedures have been completed and have reviewed the service report

  • Result of compelted maintenance

  • What are reasons for non-satisfaction?

  • Add actions to this to ensure followed up

  • Schenker Ltd RPS acceptance sign off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.