Title Page
-
Conducted on
-
Prepared by
-
Location
-
Additional One Off Task Checklist completed fully (photos attached of all pages)
-
FC Competency Sign Off completed fully, updated on MS Teams and printed and placed in PS File 1 (photo of Sign off form attached)
-
Cleaning Checklist Completed fully (photos attached of all pages)
-
Break Room/Locker Room deep cleaned (photos attached of after clean)
-
Exterior signage clean and in working order (lights working where applicable) (attach photo of sign)
-
Key box fitted, in working order and all Managers/FCs know the access code (attach photo of location of key box)
-
Exterior TrainSafe marketing on display correctly and clearly (attach photo of window signage, queue floor markers, queue poster)
-
Exterior doors and pods are in working order, with TrainSafe Exit and Entry signage (photo of pods)
-
Hand sanitiser fitted in foyer near to pods and filled (attach photo)
-
Correct TrainSafe "Do not use" signage displayed on kiosk (attach photo)
-
Appropriate TrainSafe marketing material clearly on display in foyer and entrance area (attach photos of A Boards, Exit Queue Markers and Totems)
-
Vending machines been made card only (coin slot taped over) (attach photo)
-
Vending machines are operational and stocked
-
Meet the Team board displaying the correct FC/PTs upon gym re-opening
-
All marketing (inc. 3rd party) been removed from all areas and replaced where appropriate with correct TrainSafe marketing
-
WIPEPOD units fitted, filled and specific marketing placed next to unit (attach photo of all units)
-
"Member Cleaning Zones/Pods" removed from gym floor
-
Free Weights Area - All Weight Plates been stored on Weight Trees and not on any other Equipment (attach photo of free weights area)
-
Functional Area - All weight plates been stored on Rig or Weight Trees (where available) and not on any other equipment (attach photo of functional area)
-
Ladies Only - TrainSafe marketing displayed clearly and correctly, if applicable (attach photos)
-
Studio - The number of pump kits, steps and mats reflect the number of member boxes/grids available (attach photos of studio floor, steps against wall, studio mat rack and pump storage rack)
-
Floors/Carpets been hoovered and cleaned thoroughly from where Cardio kit was moved
-
All Cardio/Fixed Pin/Free Weight/Functional kit has been cleaned thoroughly (elevate treadmill and take photo of carpet underneath)
-
Cycle Studio - All bikes have been cleaned thoroughly
-
All clip frames on gym floor, in changing rooms, accessible toilet/shower displaying correct TrainSafe marketing (attach example photo)
-
Break Room - Gym layout printed and on display (attach photo)
-
Break Room - Health Declaration and Cleaning Checklist on display and available (attach photo)
-
Break Room/Back of House - PPE is readily and easily available (attach photo)
-
The number of Hand Sanitiser units put up in the gym match the Crib sheet criteria (leave comments if not)
-
Does the number of WIPEPOD units put up in the gym match the Crib sheet criteria (leave comments if not)