Information
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Site Contact, Name, Email, Phone number
Scope and Services
-
Provide a description of the equipment and the project scope:
-
Please indicate the services that are requested
- DC Power Services
- Other
DC Power Services
-
Indicate the Services that Vertiv will provide
- Battery Replacement (355)
- Battery Maintenance/PM (208)
- Battery Capacity Testing (208)
- Charger/UPS Maintenance (208)
- Charger/UPS Upgrades (215)
- Charger/UPS Replacement (215 or 356)
-
Indicate the battery manufacturer
- Alcad
- Alpha
- BAE
- C&D
- Deka (East Penn)
- Eaton
- Energy Storage Systems
- Enersys
- Fiamm
- GNB (Exide)
- Hoppecke
- Laor
- Leoch
- Northstar
- Power Battery
- Power Sonic
- SAFT
- SBS
- Ultra Power
- Universal Battery
- Other
-
Enter the battery model number
-
Enter the battery type
-
Indicate the battery system voltage
- 12VDC
- 24VDC
- 48VDC
- 125VDC
- 250VDC
- 288 VDC
- 360 VDC
- 384 VDC
- 480 VDC
- Other
-
Enter the number of batteries in a string
-
Enter the number of strings in the battery system
-
What is the accessibility of the battery?
- Elevator
- Stairs
- A manlift is needed for personnel and tools
- Not accessible
- Ground Level
- Other
-
Where are the batteries located?
- Basement
- Ground level
- 2nd floor
- 3rd floor
- 4th floor
- 5th floor
- Roof/Mezzanine
- Other
-
Indicate the desired manufacturer for the new system
- Alcad
- Alpha
- BAE
- C&D
- Deka (East Penn)
- Eaton
- Energy Storage Systems
- Enersys
- Fiamm
- GNB (Exide)
- Hoppecke
- Laor
- Leoch
- Northstar
- Power Battery
- Power Sonic
- SAFT
- SBS
- Ultra Power
- Universal Battery
- Other
-
Indicate the desired battery type for the new system
-
Is there presently spill containment?
-
Does the client want to reuse the spill containment system?
-
Enter the type of rack (e.g. 2-step, 3-tier, etc.)
-
Enter the rack dimensions (Width, Height, Depth)
-
Is a Temporary battery required for replacement of the existing battery system?
-
Include photos of battery system
-
What does the customer require for the frequency of the Battery PM?
- 1 PM Per Year
- 2 PMs Per Year
- 4 PMs Per Year
- 12 PMs Per Year
- Other
-
What is the customer wanting us to perform on the UPS, Inverter, Charger or Static Switch?
-
Enter the existing UPS, Inverter, Charger or Static Switch manufacturer
-
Enter the existing UPS, Inverter, Charger or Static Switch model number
-
Enter the number of UPS, Inverter, Charger or Static Switch
-
What is the accessibility of the UPS, Inverter, Charger or Static Switch?
- Elevator
- Stairs
- A manlift is needed for personnel and tools
- Not accessible
- Ground Level
- Other
-
Where is the UPS, Inverter, Charger or Static Switch located?
- Elevator
- Stairs
- A manlift is needed for personnel and tools
- Not accessible
- Ground Level
- Other
-
Take or attach photo of existing UPS, Inverter, Charger or Static Switch nameplates
-
Enter the existing UPS, Inverter, Charger or Static Switch manufacturer
-
Enter the existing UPS, Inverter, Charger or Static Switch model number
-
Enter the number of UPS, Inverter, Charger or Static Switch
-
Indicate the desired manufacturer, model number, and/or product family for the system. Enter Vertiv to specify if the client does not have a preference.
-
What is the accessibility of the UPS, Inverter, Charger or Static Switch?
- Elevator
- Stairs
- A manlift is needed for personnel and tools
- Not accessible
- Ground Level
- Other
-
Where is the UPS, Inverter, Charger or Static Switch located?
- Basement
- Ground level
- 2nd floor
- 3rd floor
- 4th floor
- 5th floor
- Roof/Mezzanine
- Other
-
Is a Temporary system required for replacement of the existing system? This option may not always be possible to provide.
-
Take or attach photo of existing UPS, Inverter, Charger or Static Switch nameplates
Other Services
-
Indicate the requested services:
Additional information and notes
-
When is the outage window or when is service requested? (Date)
-
If an outage, how long is the outage duration (in Hours, Days or Weeks)?
-
Notes