Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Service Visit Type
-
Location
-
Plant Description
-
Asset Reference
RAMS
-
Risk assessment completed
-
Method statement completed
-
PPE
-
Engineer Initials
SFG20 Procedure - Deaerator (1Y)
-
Drain the dirt from the unit (Caution - The main body and the piping may be hot and hot water or steam may escape during the procedure).
-
1 - Remove the safety plug
-
2 - Connect a hose to the drain valve. Make sure that the hose is connected to a drain or leads to a suitable place to collect the drained dirt.
-
3 - Gradually open the drain valve fully until the dirt is drained out. An indication is when clear water comes out of the unit.
-
4 - Close the drain valve.
-
5 - Disconnect the hose from the drain valve.
-
6 - Install the safety plug.
-
7 - Check the system pressure. If it is necessary, refill the system.
Additional Comments
-
Report of any faults
Safety checks
-
Inspection Completed
-
Area left safe
-
Area left clean
Polyteck Building Services, 143 Leman Street, London, E1 8EY
-
Engineer signature