Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • undefined

Concrete Data

  • Contractor(s)

  • Location(s)

  • Pour Date & Start Time

  • End Date & Time

  • Estimated Volume

  • Actual Volume

  • Is The Concrete Mix Design Approved?

  • Mix Design Class

  • KYTC Mix #

  • #8 Stone

  • Fly-Ash

  • Retarder (%)

  • Temperature Control

  • Notes

Surface Preparation

  • Has debris been removed from deck, diaphragm. approach and moment slabs?

  • Are deck pans cleaned and any voids filled with filler?

  • Is styro-foam taped down properly were broken or removed?

  • Are deck drains covered and any holes filled?

  • Notes:

  • WCC - Foreman/Superintendent

  • WCC - QC Engineer

  • KYTC Representative

Reinforcement & Joints

  • Has any nicked or cut epoxy coated rebar been touched up?

  • Is the rebar the proper size?

  • Are the top and bottom mats per plan?

  • Are the ties spaced properly and tied tightly?

  • Is the top mat tied down every 8sq ft?

  • If splices are used, does it meet the minimum splice length?

  • Expansion joints installed per plan?

  • Notes:

  • WCC - Foreman/Superintendent

  • WCC - QC Engineer

  • KYTC Representative

Contractor Equipment & Material Preparation

  • Has a internal dry-run been performed?

  • Has a dry-run been performed with KYTC representative?

  • Is there burlap on site? (New burlap must be soaked for minimum of 24hrs and used burlap a minimum of 12hrs)

  • Is there an approved curing compound on site?

  • Has the barrier wall steel been protected from curing compound application?

  • Is epoxy bonding agent required? If so is it on site?

  • Is there an approved washout pit onsite and accessible?

  • Are the materials to construct a bulkhead onsite and accessible?

  • Is there an adequate water supply and hose for wetting and curing the deck onsite?

  • Is there adequate lighting for night work?

  • Is there plywood available for transporting concrete samples?

  • Notes:

  • WCC - Foreman/Superintendent

  • WCC - QC Engineer

  • KYTC Representative

Pre-Pour Meeting Items

  • Has a pre-pour meeting occurred?

  • Is there a back up plan in place for rain or inclement weather?

  • Is there a cold/hot weather plan?

  • Is there a backup equipment plan e.g. vibrators, generators, pump truck, finishing machine?

  • Notes:

Approvals For Placement

  • WCC - Foreman/Superintendent

  • WCC - QC Engineer

  • KYTC Representative

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.