Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
WORK ORDER DETAILS
-
Work Order Number:
-
Requested By:
-
For Hub:
CLIENT/HOUSEHOLDER DETAILS
-
Claim Number:
-
Client/Householder Name:
-
Contact Details:
TASK ANALYSIS (Required for this work order yes/no)
-
SITE CHECKS (PER VISIT)
-
1) Assess property for external hazards
-
2) Familiarise customer with process and requirements
-
3) Erect signs and barricades and/or check existing signs and barricades
-
4) Don PPE (full face mask with HEPA and organic vapour cartridges, BA when entering floor cavities)
-
---------------------------------------------------------------------------------------------------------------------------------------------------------
-
5) As per below
-
---------------------------------------------------------------------------------------------------------------------------------------------------------
-
6) Ensure any signage being left on site is secure and visible
-
7) Remove bundling and signage not being left on site
-
8) Check site and leave
-
ECC AND/OR AIR SAMPLING
-
follow steps 1-4 of site checks
-
a) Load in equipment and ensure all is in good working order (electrical equipment is fully tagged etc)
-
b) Record observations including clients comments
-
c) Take samples as required
-
follow steps 6-8 of site checks
-
DECONTAMINATE CRAWL SPACE
-
follow steps 1-4 of site checks
-
a) Ensure all occupants and pets are out of the area to be decontaminated
-
b) Block all foundation vents
-
c) Fog out crawl space
-
follow steps 6-8 of site checks
-
DECONTAMINATION OF INTERNAL ENVELOPE OF PROPERTY
-
follow steps 1-4 of site checks
-
a) Load in equipment and ensure all is in good working order (electrical equipment is fully tagged etc)
-
b) Load in disinfectants and ensure they are safely stored and mixed (keep well away from the public and have MSDS at hand)
-
c) Take pre-air samples
-
d) Ensure all occupants and pets are out of the area to be decontaminated
-
e) Apply surface treatments
-
f) Pack up unnecessary equipment and load out
-
g) Set VHP and close up home
-
follow steps 6-8 of site checks
-
POST TREATMENT SAMPLING
-
follow steps 1-4 of site checks
-
a) Upon re-entry, test VHP levels. Only re-enter if safe to
-
b) Take Air Impact Samples
-
follow steps 6-8 of site checks
-
Signature of Technician Completing Task Analysis