Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
All personnel with Training and Assessment System responsibilities have be made aware of their responsibilities<br>SMO<br>Project Training Staff <br>Trainers and Assessors
-
Approved Training and Assessment System in place. (as per Procedures, Flow charts, etc)
-
Training matrix established, available for personnel access and all skills achieved or in process listed (Up To Date)<br>Note: This is to include ALL personnel onsite, including workshop, staff and sub-contractors
-
Training and Assessment documents (master copies) in place or access available to Trainers / Assessors
-
Has the Training Needs for the site been established and displayed in the Crib Room and Supervisors office
Employee Training History
-
Personnel training files established<br>Note: This is to include ALL personnel onsite, including workshop, staff and sub-contractors
-
Induction/s completed – Client, Downer EDI Mining etc
-
Has Operator Pre-Test been completed, corrected, verified and signed. – 10% sampled
-
Verify operator competency – 10% sample (Compare matrix to employee training file and duties being performed – shift roster)
-
Has operator been trained and assessed in Downer EDI Mining SWP’s relevant to task? Verify if SWP signed off after being assessed.
-
Has further operator skills required been identified through a Training Plan (as applicable)
-
Assessment conducted has used correct process:<br>Assessment Booklet<br>RPL<br>RCC – (With previous documentation) Challenge test
Assessment Instrument
-
Has Trainer signed off level of competence (e.g. close/minimal supervision, full, requires further training etc).
-
Has assessment booklet been completed Boxes ticked off, dated, comments, signatures
Assessors
-
List of site assessors available
-
Copies of assessor qualifications in employee file and proof of current competency in assessments conducted
-
Have assessor/s been familiarised with and understand the Training and Assessment System documents
Completion
-
Has assessor / candidate signed all documentation
-
Has SMO completed authorisation document for operator to operate machinery onsite (as applicable)
-
Client approval to operate obtained (If applicable)
-
Employee training history entered into records/database
Summary - Positive Results
Summary - Observations
Summary - Opportunities for Improvement
-
Add signature