Title Page
-
Site conducted
-
Prepared by
- Cristian Serban
- Reece Martinez
- Daniel Bagalo
- Greg Siciunas
- Mantas Siciunas
- Leon Clarke
- Tsvetan Tsvetkovski Cece
-
Ganger names
-
Job Number
-
Contract
-
Conducted at Time and Date
-
Who is meeting with on site, Names
Defect information
-
Number of defects being reported for site location?
-
Number of defects agreed?
-
Number of defects rejected?
-
1. Type of defect?
- Potential Trip Hazard
- Trench sunk
- Temp tarmac
- Slabs broken
- Frame and cover to High Trip hazard
- Footway/Highway staining
- Block Paving
- Rocking slabs
- Verge grass required
- Concrete pointing or infill cracked or damaged
- Concrete damaged or marked by others
- Duct still blocked
- Chamber install incorrect
- Shallow ducts
- Damage to third party property
- Incorrect Tarmac colour
- Stones over 20mm
- Incorrect slab size or colour
- Incorrect Line marking colours
- Incorrect Anti skid installed
- Core failures
- No rope in ducts
- No labelling in chamber or on fibre cables
- Kerb damaged or rocking
- Toby box too high or low
- Incorrect duct size installed
- Scaring
- 150mm and 250mm rules
-
1. Defect Pictures
-
2. Type of defect?
- Potential Trip Hazard
- Trench sunk
- Temp tarmac
- Slabs broken
- Frame and cover to High Trip hazard
- Footway/Highway staining
- Block Paving
- Rocking slabs
- Verge grass required
- Concrete pointing or infill cracked or damaged
- Concrete damaged or marked by others
- Duct still blocked
- Chamber install incorrect
- Shallow ducts
- Damage to third party property
- Incorrect Tarmac colour
- Stones over 20mm
- Incorrect slab size or colour
- Incorrect Line marking colours
- Incorrect Anti skid installed
- Core failures
- No rope in ducts
- No labelling in chamber or on fibre cables
- Kerb damaged or rocking
- Toby box too high or low
- Incorrect duct size installed
- Scaring
- 150mm and 250mm rules
-
2. Defect Pictures
-
3. Type of defect?
- Potential Trip Hazard
- Trench sunk
- Temp tarmac
- Slabs broken
- Frame and cover to High Trip hazard
- Footway/Highway staining
- Block Paving
- Rocking slabs
- Verge grass required
- Concrete pointing or infill cracked or damaged
- Concrete damaged or marked by others
- Duct still blocked
- Chamber install incorrect
- Shallow ducts
- Damage to third party property
- Incorrect Tarmac colour
- Stones over 20mm
- Incorrect slab size or colour
- Incorrect Line marking colours
- Incorrect Anti skid installed
- Core failures
- No rope in ducts
- No labelling in chamber or on fibre cables
- Kerb damaged or rocking
- Toby box too high or low
- Incorrect duct size installed
- Scaring
- 150mm and 250mm rules
-
3. Defect Pictures
-
4. Type of defects?
- Potential Trip Hazard
- Trench sunk
- Temp tarmac
- Slabs broken
- Frame and cover to High Trip hazard
- Footway/Highway staining
- Block Paving
- Rocking slabs
- Verge grass required
- Concrete pointing or infill cracked or damaged
- Concrete damaged or marked by others
- Duct still blocked
- Chamber install incorrect
- Shallow ducts
- Damage to third party property
- Incorrect Tarmac colour
- Stones over 20mm
- Incorrect slab size or colour
- Incorrect Line marking colours
- Incorrect Anti skid installed
- Core failures
- No rope in ducts
- No labelling in chamber or on fibre cables
- Kerb damaged or rocking
- Toby box too high or low
- Incorrect duct size installed
- Scaring
- 150mm and 250mm rules
-
4. Defect Pictures
-
5. Type of defect?
- Potential Trip Hazard
- Trench sunk
- Temp tarmac
- Slabs broken
- Frame and cover to High Trip hazard
- Footway/Highway staining
- Block Paving
- Rocking slabs
- Verge grass required
- Concrete pointing or infill cracked or damaged
- Concrete damaged or marked by others
- Duct still blocked
- Chamber install incorrect
- Shallow ducts
- Damage to third party property
- Incorrect Tarmac colour
- Stones over 20mm
- Incorrect slab size or colour
- Incorrect Line marking colours
- Incorrect Anti skid installed
- Core failures
- No rope in ducts
- No labelling in chamber or on fibre cables
- Kerb damaged or rocking
- Toby box too high or low
- Incorrect duct size installed
- Scaring
- 150mm and 250mm rules
-
5. Defect Pictures
Defect Agreed Remedials Agreed On-site
-
Defects-Remedials Agreed on site
Materials
-
Description of what materials and amounts required
Signing off report
-
SDU Supervisor Signature
-
Local Authority Signature