Title Page

  • Client / Site

  • Address

  • Conducted on

  • Prepared by

  • Personnel at Audit

Outstanding Works

Overall Completion

  • Outstanding Works

  • Outstanding Works Item

Outstanding Work Details

  • Details of Work Item

  • Pictures of Outstanding Works Item

  • Location

  • Action Required

  • Action By (Individual or Organisation)

  • Action Required By

  • Has this Item been closed out?

  • Details

  • Close Out Date

Practical Completion Defects Audit

Overall Completion

  • Defects to be rectified prior to Practical Completion

  • Defect Item

Defect Details

  • Details of Defect

  • Pictures of Defect

  • Location Of Defect (include road number, pit number etc.)

  • Action Required

  • Action By (Individual or Organisation)

  • Action Required By

  • Has the item been closed out?

  • Details

  • Close Out Date

IDM Practical Completion Checklist

  • All construction works are completed as per the approved plans or can be issued once the outstanding works are bonded

  • If the response is 'No', provide details

  • Site is generally tidy (i.e. no rubbish, wheel ruts have been removed etc)

  • If the response is 'No', provide details

  • Cracking/surface of road pavement and concreting is satisfactory

  • If the response is 'No', provide details

  • Pit lids (inserts) are off, pits are clean?

  • If the response is 'No', provide details

  • All house drains and property inlets are installed and house drain riser is in place

  • If the response is 'No', provide details

  • Kerb and channel is stamped indicating location of conduits and house drains

  • If the response is 'No', provide details

  • Line marking, signs and street plates are in place

  • If the response is 'No', provide details

  • Light and sign poles are vertical

  • If the response is 'No', provide details

  • Temporary turning facilities, including Carriageway easement as required, with hazard chevrons in place

  • If the response is 'No', provide details

  • Pit lid levels are flush with FSL

  • If the response is 'No', provide details

  • Pit lid levels and FSL provide detention as specified in bioretention areas

  • If the response is 'No', provide details

  • Number of plants as specified in bioretention areas

  • If the response is 'No', provide details

  • Pit lid (frames) are sitting on all sides. If using TerraFirma pits lids, are frames bolted into pit surround

  • If the response is 'No', provide details

  • Top soil in place to correct FSL at BOK and edge of footpath, nature strips free of debris

  • If the response is 'No', provide details

  • Fire hydrants and fire plugs in place and marked in accordance with Fire Service Guidelines published by the fire authority and are at the correct level

  • If the response is 'No', provide details

  • Outfalls have grates to prevent entry and are locked with an approved Council key

  • If the response is 'No', provide details

  • Have as-constructed plans been submitted to Council

  • If the response is 'No', provide details

End of Defects Liability Period Inspection

Overall Completion

  • Defects to be rectified prior to end of DLP

  • Defect Item

Defect Details

  • Details of Defect

  • Pictures of Defect

  • Location of Defect (include road number, pit number, etc.)

  • Action Required

  • Action By (Individual or Organisation)

  • Action Required By

  • Has this Item been closed out

  • Close Out Date

  • Details

IDM Defects Liability Period Checklist

  • Site is generally tidy (i.e. no rubbish, wheel ruts have been removed etc)

  • If the response is 'No', provide details

  • No subsidence has been identified

  • If the response is 'No', provide details

  • Electronic surveillance of all pipe drains was carried out at the end of the maintenance period and information provided to Council

  • If the response is 'No', provide details

  • Light and sign poles are vertical

  • If the response is 'No', provide details

  • No failure of infrastructure has been identified

  • If the response is 'No', provide details

  • Outstanding Works have been completed as per Outstanding Works and Defects lists

  • If the response is 'No', provide details

  • Cracking/surface of road pavement and concreting is satisfactory

  • If the response is 'No', provide details

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.