Title Page
-
Departure crossing
-
Departure port
-
Ship Name
-
Conducted on
-
Prepared by
-
Location
-
The Checklist is to be completed by the Master with the assistance of the Bridge Team. The Master is to be advised of any malfunction of equipment. Section 1 can be completed by the Master, Deck Officer or QM. Section 2 by the Master only. section 3 by the Master or Deck Officer. Boxes may be ticked or initiated, or makes N/A if not relevant to the ship. The master must sign section 2 and section 3 on completion of the checklist and before departure. The Deck Officer must sign Section 4 post departure and report all complete to the Master.
SECTION 1
COMMUNICATIONS
-
15 mins notice to ECR (at ETD -20 mins)
-
Time
-
15 mins notice to Information Office
-
Time
-
15 mins notice to Port Control/ ramp man
-
Time
-
5 mins notice to ECR (at ETD -10 mins)
-
Time
-
5 mins notice to Port Control
-
Time
-
Harbour Stations fwd comms tested
-
Harbour Stations aft comms tested
-
DG Plan received ashore
-
DG Plan on Bridge
-
DG Plan in ECR
-
Muster List on Bridge
-
Confirm muster list mode to ECR
-
Muster list received ashore
-
Documents received onboard
NAVIGATIONAL EQUIPMENT
-
VHF sets operating on ch. 11-13-16-17/74
-
Echo sounder on and operational
-
Gyro repeaters, alignment checked
-
Radars set up, performance checked
-
Masters/conning radar switched to VDR
-
VDR on alarms checked
-
VMS safety settings, VP in, auto alarm on
-
Voyage plan in ECDIS/ DGPS
-
AIS total persons onboard updated
-
Navigational lights on
-
Tides updated
-
Nap warnings checked
BRIDGE CONTROLS
-
Fire detection to 'sea mode'
-
Car deck fans to 'sea mode'
-
Deck 7 car deck doors closed and locked
-
Deck 5 car deck doors closed and locked
-
Deck 3 car deck doors closed and locked
-
Lifts isolated for sea
-
Heeling tanks isolated
-
Bridge email/ PC off or on standby
FINAL CLEARANCE
-
Fresh water hose clear
-
Freight in way of stern gates chocked and lashed
-
Bunker barge disconnected and clear
-
Skywalk clear and secure
-
Ramps clear
-
Blindside checked and clear
-
Mooring party in attendance
-
BNWAS on
-
Verbal signal for departure
-
Time
-
Visual signal for departure
-
Time
SECTION 2 MASTER ONLY
OUTER BOW DOOR
-
Time reported secure
-
Verbally reported secure
-
Visual check of lamps
-
Visual check of CCTV cameras
INNER BOW DOOR
-
Time reported secure
-
Verbally reported secure
-
Visual check of lamps
-
Visual check of CCTV cameras
STERN DOOR
-
Time reported secure
-
Verbally reported secure
-
Visual check of lamps
-
Visual check of CCTV cameras
BRIDGE FRONT DOOR
-
Time reported secure
-
Verbally reported secure
-
Visual check of lamps
-
Visual check of CCTV cameras
OTHER DOORS/ HATCHES
-
Time reported secure
-
Verbally reported secure
-
Visual check of lamps
-
Visual check of CCTV cameras
HYDRAULIC POWERPACK ISOLATED
-
Time isolated
MODE
-
Muster mode
- 1
- 2
- 3
- 4
- F
-
Max permitted onboard
-
Crew onboard
-
Passengers onboards
-
Total Souls on board
HOD REPORTS
-
Deck
-
Tech
-
OBS
-
Masters signature
SECTION 3 MASTER/DECK OFFICER
MANOEUVRING CONTROLS
-
Propellers clear
-
Control levers at zero after testing
-
Pitch indicator at zero
-
Engines in constant speed
-
Engines started
-
Engines clutched in
-
Engines on bridge control
-
Bow thrusters on and tested
-
- BT 1
- BT 2
- BT 3
-
Steering motors
-
- 2 Pumps
- 4 Pumps
-
Hand steering selected and tested
-
Watertight doors all closed
-
SBE
-
Time
STATUS
-
Bridge condition: Red in effect
-
Stability safe and master informed
-
Significant difference
-
Captains announcement
-
Passenger tape playing
-
Masters departure brief
-
TOP LINE given to port control
-
Designated Officers Signatures
-
Master's Signature
SECTION 4 - POST DEPARTURE - DECK OFFICER
-
Keys in the box, locked, key to Master
-
Echo sounder depth alarm set
-
Bow thrusters stopped
-
Grey water switch to sea mode
-
ECDIS docking CID turned off on all screens
-
ECDIS profile set to default
-
ECDIS alarm set
-
OOW / conning radar switch to VDR
-
Deck rounds completed
-
Aft mooring decks and hatches secured
-
Anchors, focsle head doors and hatches secured
-
Car deck door status checked
-
Bridge condition as appropriate
-
Post departure checks reported completed to master
-
Designated Officers Signature