Title Page
-
Conducted on
-
Prepared by
-
Location
Pre-15 Equipment checks
-
Date
-
Departure port
-
Voyage time ex-Dover
- C01
- C03
- C05
- C07
- C09
- Shift
-
Voyage time ex-Calais
- C02
- C04
- C06
- C08
- C10
- Shift
-
Voyage plan in DGPS & ECDIS
- DGPS
- ECDIS
-
Relevant tidal information displayed
-
Navtext printer checked
-
Engine controls (4 checks)
- Levers zero
- Pitch shows zero
- Bridge and Lever control switches
- Manoeuvre mode selected
Pre-5
15 - 5
-
15 Minutes to ECR
-
15 Minutes to Port control
-
15 Minutes to Info
-
Muster list on bridge
-
Confirm muster list mode to ECR
-
10 Minutes to Master
-
RADARs set up
-
Radios set appropriately
-
5 minutes to ECR (ETD -10)
Readiness
-
Propellers clear
-
4 steering motors on, hand steering tested
-
Bunker barge disconnected and clear
-
Skywalk clear
-
Car deck fire detection reinstated
-
Heeling tanks disabled
-
Car deck fans set for sea
-
Muster list received ashore