Information

  • CPA works order number

  • Site name

  • Conducted on

  • Supervisor

  • Location
  • Gang Name

  • Site photo

Safety Observations

  • Housekeeping (free of hazards)?

  • Service avoidance (under and overhead) use of CAT

  • PPE

  • Noise/dust

  • Manual Handling(reduced where possible)

  • Fire protection and First Aid

  • Ladders/cherry picker

  • Cutting & Grinding

  • Is COSHH being used correctly?(labelled containers etc)

  • Are fuel containers labelled with correct UN codes?

  • Lifting Equipment (in date test etc)

  • HAV's

Traffic management

  • Are all signs and cones laid in accordance with CH8?

  • Is there a safe route for pedestrians?

Quality

  • Are works following design? Record CVI if necessary.

  • Are the gang making expected progress?

  • Are the materials correct to the job?

  • Are Plant & vehicle correct to the job?

  • Are the operatives correct for this work?

  • Does the Site layout look correct?

Drainage

  • Drainage

  • Is correct ironwork class in use? i.e. D400

  • Is line and level of pipe work correct to the design?

  • Are manholes and gullies constructed correctly?

  • Does bed and surround meet specification?

  • Are pipe joints closed?

Earthworks

  • Earthworks

  • Is line and level correct ?

  • Edge Shoring: Have the tie wires been correctly installed ?

  • Edge Shoring: have the correct posts been used and are they driven to correct depth?

  • Gabion: Has the correct fill been used? i.e. Class 6G

  • Gabions: Has the correct basket been used i.e. Welded mesh baskets?

Footways

  • Footways

  • Has all ironwork been adjusted to correct level?

  • Does the footway have a fall to allow free drainage i.e. no ponding?

  • Are asphalt layers the correct the correct thickness and compacted properly?

  • Is sub-base material properly compacted?

  • Has weed treatment been applied to sub grade?

  • Has existing footway been excavated to correct depth?

  • Are kerbs laid to correct line and level?

  • Have kerb lines been excavated to correct depth?

Patching

  • Patching

  • Are patches planed to correct depth?

  • Has bond coat been applied to both base AND vertical edges?

  • Has the material temp been checked before laying?

  • Are patches compacted satisfactorily?

Grass/Hedge cutting

  • Grass/Hedge cutting

  • Is the grass cut to 75mm +/- 25mm?

  • Are number of swathes cut correct?

  • Is strimming carried out around street furniture ?

  • Have all visibility splays been cut correctly?

  • Confirm sensitive sites have not been cut?

Jetting/gullying

  • Jetting/Gully Emptying

  • Is there evidence gully pots have been properly cleaned?

  • Have tops been cleaned and surround cut back 100mm?

Roadmarkings

  • Roadmarkings

  • Is line of the required quality?

  • Are the lines in the correct position?

  • Are the line spacings and line widths correct?

Sign maintenance

  • Sign maintenance

  • Has the correct post foundation used ? i.e. size and depth

  • Does the sign have a manufacturers label?

  • Has the correct post size been used and is the sign face installed at the correct height ?

  • Working at height (safe ladder use, tools on lanyards, MEWP certificate etc)

  • For multi-panel signs, have butting clamps been fitted?

Safety Defects

  • Safety Defects

  • Have defects been saw cut with vertical edges?

  • Has bond coat been applied to both edges AND base?

  • Is asphalt hot and compacted?

Driver Checks

  • Drivers licence checked?

  • CPC card present and checked?

  • Defect book checked?

  • Driver log book checked?

Acknowledgement

  • Chargehand signature

  • Supervisor Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.