Information
-
CPA works order number
-
Site name
-
Conducted on
-
Supervisor
-
Location
-
Gang Name
-
Site photo
Safety Observations
-
Housekeeping (free of hazards)?
-
Service avoidance (under and overhead) use of CAT
-
PPE
-
Noise/dust
-
Manual Handling(reduced where possible)
-
Fire protection and First Aid
-
Ladders/cherry picker
-
Cutting & Grinding
-
Is COSHH being used correctly?(labelled containers etc)
-
Are fuel containers labelled with correct UN codes?
-
Lifting Equipment (in date test etc)
-
HAV's
Traffic management
-
Are all signs and cones laid in accordance with CH8?
-
Is there a safe route for pedestrians?
Quality
-
Are works following design? Record CVI if necessary.
-
Are the gang making expected progress?
-
Are the materials correct to the job?
-
Are Plant & vehicle correct to the job?
-
Are the operatives correct for this work?
-
Does the Site layout look correct?
Drainage
-
Drainage
-
Is correct ironwork class in use? i.e. D400
-
Is line and level of pipe work correct to the design?
-
Are manholes and gullies constructed correctly?
-
Does bed and surround meet specification?
-
Are pipe joints closed?
Earthworks
-
Earthworks
-
Is line and level correct ?
-
Edge Shoring: Have the tie wires been correctly installed ?
-
Edge Shoring: have the correct posts been used and are they driven to correct depth?
-
Gabion: Has the correct fill been used? i.e. Class 6G
-
Gabions: Has the correct basket been used i.e. Welded mesh baskets?
Footways
-
Footways
-
Has all ironwork been adjusted to correct level?
-
Does the footway have a fall to allow free drainage i.e. no ponding?
-
Are asphalt layers the correct the correct thickness and compacted properly?
-
Is sub-base material properly compacted?
-
Has weed treatment been applied to sub grade?
-
Has existing footway been excavated to correct depth?
-
Are kerbs laid to correct line and level?
-
Have kerb lines been excavated to correct depth?
Patching
-
Patching
-
Are patches planed to correct depth?
-
Has bond coat been applied to both base AND vertical edges?
-
Has the material temp been checked before laying?
-
Are patches compacted satisfactorily?
Grass/Hedge cutting
-
Grass/Hedge cutting
-
Is the grass cut to 75mm +/- 25mm?
-
Are number of swathes cut correct?
-
Is strimming carried out around street furniture ?
-
Have all visibility splays been cut correctly?
-
Confirm sensitive sites have not been cut?
Jetting/gullying
-
Jetting/Gully Emptying
-
Is there evidence gully pots have been properly cleaned?
-
Have tops been cleaned and surround cut back 100mm?
Roadmarkings
-
Roadmarkings
-
Is line of the required quality?
-
Are the lines in the correct position?
-
Are the line spacings and line widths correct?
-
Sign maintenance
-
Sign maintenance
-
Has the correct post foundation used ? i.e. size and depth
-
Does the sign have a manufacturers label?
-
Has the correct post size been used and is the sign face installed at the correct height ?
-
Working at height (safe ladder use, tools on lanyards, MEWP certificate etc)
-
For multi-panel signs, have butting clamps been fitted?
Safety Defects
-
Safety Defects
-
Have defects been saw cut with vertical edges?
-
Has bond coat been applied to both edges AND base?
-
Is asphalt hot and compacted?
Driver Checks
-
Drivers licence checked?
-
CPC card present and checked?
-
Defect book checked?
-
Driver log book checked?
Acknowledgement
-
Chargehand signature
-
Supervisor Signature