Title Page
-
Project Title
-
G. Network Job No.
-
Project Description
-
Design Discipline
-
Project Type
-
Date
-
Prepared by
-
Location
Part A
1. Existing Environment
-
1.1 Access restrictions
-
1.2 Interface with the public
-
1.3 Structural instability
-
1.4 Existing street furniture
-
1.5 Ongoing building works (i.e scaffolding/construction works)
-
1.6 Bridges
-
1.7 Fragile materials
-
1.8 Hazardous materials
-
1.9 Trees/trees roots
-
1.10 Traffic
-
1.11 Bus Lanes
-
1.12 Pedestrian Zone
-
1.13 Hospital entrances and schools
-
1.14 Are there any other hazards identified?
-
Please specify other
-
Status
2. Existing Services
-
2.1 Underground
-
• Electrical
-
• Gas
-
• Water (Asbestos pipes?) basements only
-
• Telecommunications
-
2.2 Overhead Services
-
• Electrical
-
• Telecommunications
-
• Are there any other hazards identified?
-
Please specify other
-
Status
3. Earthworks
-
3.1 Deep excavations
-
3.2 Slope / ground stability
-
3.3 Interface with services
-
3.4 Are there any other hazards identified?
-
Please specify other
-
Status
4. Basement Area
-
4.1 Access
-
4.2 Existing services (asbestos?)
-
4.3 Manual handling
-
4.4 Materials / substances
-
4.5 Confined spaces
-
4.6 Pressure systems
-
4.7 Testing operations
-
4.8 Fixings
-
4.9 Are there any other hazards identified?
-
Please specify other
-
Status
5. Railway Activities
-
5.1 Overhead lines
-
5.2 Underground services
-
5.3 Are there any other hazards identified?
-
Please specify other
-
Status
-
Please click Next to continue on Hazard Elimination Checklist
Part B
Hazard Elimination Checklist
ITEM
-
Reference
-
Activity
-
Add a photo
-
Hazard
-
Add a photo
-
Persons at Risk
-
Design Measures taken, or being taken to eliminate or reduce the hazard
-
Information on the Residual Risk
Completion
-
Additional comments and observations
-
Prepared By Name and Signature