Information
-
Prepared by
-
Date and Time
-
Project Name
- Cyclotron
- Animal clinic
- Animal House
- Swimming pool
- Sardar Yaseen Malik Block
- Dr. Tajmmul Block
- Cafeteria
- Mosque
- Zoo
-
Project No.
-
Project Description
-
Contractor
-
Project Starting Date
-
Project Completion Period
-
Project Handover Deadline
-
Project Covered Area
-
Project Completion (%)
- 10% to 20%
- 20% to 30%
- 30% to 40%
- 40% to 50%
- 50 % to 60%
- 60% to 70%
- 70% to 80%
- 80% to 90%
-
Project No.
-
Project Description
-
Contractor
-
Project Starting Date
-
Project Completion Period
-
Project Handover Deadline
-
Project Covered Area
-
Project Completion (%)
- 10% to 20%
- 20% to 30%
- 30% to 40%
- 40% to 50%
- 50 % to 60%
- 60% to 70%
- 70% to 80%
- 80% to 90%
-
Project No.
-
Project Description
-
Contractor
-
Project Starting Date
-
Project Completion Period
-
Project Handover Deadline
-
Project Covered Area
-
Project Completion (%)
- 10% to 20%
- 20% to 30%
- 30% to 40%
- 40% to 50%
- 50 % to 60%
- 60% to 70%
- 70% to 80%
- 80% to 90%
-
Project No.
-
Project Description
-
Contractor
-
Project Starting Date
-
Project Completion Period
-
Project Handover Deadline
-
Project Covered Area
-
Project Completion (%)
- 10% to 20%
- 20% to 30%
- 30% to 40%
- 40% to 50%
- 50 % to 60%
- 60% to 70%
- 70% to 80%
- 80% to 90%
-
Project No.
-
Project Description
-
Contractor
-
Project Starting Date
-
Project Completion Period
-
Project Completion (%)
- 10% to 20%
- 20% to 30%
- 30% to 40%
- 40% to 50%
- 50 % to 60%
- 60% to 70%
- 70% to 80%
- 80% to 90%
-
Project Progressing Obstructions History
- Contractor doesn't have enough Labor at site
- Material was not Receiving timely
- Changes in drawings many times
- Corrections in drwings many times
- Structural issues were not solve timely
- Project progressing normally
- MEP drawings not matching with Architecture
- Structural drawings not matching Architecture
- Plumbing Drawings not available
- Electrical Drawings not available
- HVAC Drawings not available
-
Contractor payment status
- 1st Running Bill
- 2nd Running Bill
- 3rd Running Bill
- 4th Running Bill
- 5th Running Bill
- Final Settlement
-
Contractor Rating
Site Analysis From 8th May to 14th May 2022
Site Workforce
-
Contractor's Engineer Available at Site?
Project Progress
-
Project Phases
- Earth Works
- Cement Concrete Work
- Reinforcement Works
- Finishing work
- R.C.C. Supporting work
-
Activities under Earth Work phase
- Layout
- Excavation
- Stone solling
- Termite control
- Back filling
- Lift Pit
- Water proofing
- Compaction
- Concealed Piping
- Lean
-
Activity Location
- At Ground Floor Level
- At First Slab Level
- At Second Slab Level
- At Third Slab Level
- At Fourth Slab Level
- At Fifth Slab Level
- At Ground Level
-
Activity Status
-
Reason for Delay
-
Activities under Cement Concrete Phase
- Plastering
- Pouring concrete
- Block Masonry
- Floor screed
- Precasting
- Water Tank
- Septic Tank
- Concrete Floor
-
Activity Location
- At Ground Floor Level
- At First Slab Level
- At Second Slab Level
- At Third Slab Level
- At Fourth Slab Level
- At Fifth Slab Level
- At Ground Level
-
Activity Status
-
Reason for Delay
-
Activities under Reinforcement Work phase
- Footing steel
- Beam Steel
- Columns steel
- Slabs steel
- Retaining wall steel
- Staircase steel
- Lift Wall steel
-
Activity Location
- At Ground Floor Level
- At First Slab Level
- At Second Slab Level
- At Third Slab Level
- At Fourth Slab Level
- At Fifth Slab Level
- At Ground Level
-
Activity Status
-
Reason for Delay
-
Activities under Finishing Work phase
- Plumbing work
- Paint work
- Electrical work
- Flooring work
- Marble & Skirting
- Pavers
- Tiling work
- Aluminum & Glass work
- Wood work
- False ceiling
- Fiber & S.S. Work
- HVAC Work
- Cladding
- Insulation
- Fixtures
- I.T. Cabling
- Fire Safety
- C.C.T.V. Cabling
- Furniture
- Landscaping
- Door Accessories
- Window Accessories
-
Activity Location
- At Ground Floor Level
- At First Slab Level
- At Second Slab Level
- At Third Slab Level
- At Fourth Slab Level
- At Fifth Slab Level
- At Ground Level
-
Activity Status
-
Reason for Delay
-
Activities under R.C.C. Supporting work phase
- Columns scaffolding
- Beams scaffolding
- Foundation scaffolding
- Water tank scaffolding
- Pools scaffolding
- Slabs scaffolding
- Conduiting
- Piping
- Trenching
- Insulation
- Ducting
- Retaining wall scaffolding
- Curing Concrete
-
Activity Location
- At Ground Floor Level
- At First Slab Level
- At Second Slab Level
- At Third Slab Level
- At Fourth Slab Level
- At Fifth Slab Level
- At Ground Level
-
Activity Status
-
Reason for Delay
More Information
-
Any work stoppage order implied at site?
-
Describe reason for stop the work
-
Any instruction received from any team member regarding current activity?
-
Instruction details
-
Instruction status
-
Instruction has been Passover to the contractor?
-
Describe
-
Any revision required in drawings as per site condition?
-
Drawings to be revised for?
-
Revision Detail
-
Is the contractor working with updated drawings?
-
Describe
-
Anything to be undone or demolished at the site?
-
Details
-
Was it order in written?
-
Should it be backcharged?
-
To whom & why?
-
Does any Machinery use at the site?
-
Type & Useage?
-
Contractor plan to work ovetime?
-
Required technical support, we provide by the.
- A/C Tech.
- Electrician
- Plumber
- Carpinter
- Painter
- Other
- Not Required
-
Technical Support details
Safety & Security
-
Were their any accident at the site?
-
Project Spot?
- Cyclotron
- Animal clinic
- Animal House
- Swimming pool
- Sardar Yaseen Malik Block
- Dr. Tajmmul Block
- Cafeteria
- Mosque
- Zoo
-
Do laborers stay at the site?
-
safety precautions measure at the site
-
Any irregularity found during the site inspection?
-
Describe
Visitor / Guest information
-
Any meeting at the site?
-
Meeting agenda?
-
Meeting Result?
-
Were there any visitors?
-
Visitors Names
-
Any document send/received/signed for project ?
-
Details
Orders & Deliveries
-
Any material order from site
-
Material Name & Quantity
-
Any material Received at site
-
Material Name & Quantity
Remarks
-
If anything else?
-
Complain & Issues