1. Subcontractor Inspected
-
Subcontractor Name
-
Work Performed / Location
-
CWP/JHA Package for work being performed is on site and signed
-
PPE (Hard Hat, Safety Glasses, Type 3 Vest, etc)
-
Housekeeping (Impalements protected, trash in containers, materials cleaned up and stacked to eliminate tripping hazards, portable toilets nearby and clean)
-
Fall Protection (Anything over 6' - At heights or leading edges)
-
Confined Space Entry (Gas Tester, Permit filled out, Employees trained, Blower in place, Form of rescue in place)
-
Excavations (DigAlert current, Ladder in place and secure, Competent Person on site, Shored properly, Spoil pile 2' from edge)
-
Ladders (3' above landing, Secured, Working form ladder at over 6'?' Using 3 point contact, Positioned at 4 to 1, Extension ladders separated)
-
Electrical Cords (Cords not cut and covered with tape, Guards are in place)
-
Traffic Control (Flaggers needed and/or qualified, Attenuator required, Cones/Arrow boards/Barricades/Signs and Banners properly placed)
-
Fire Protection (Oxy/Act - stored properly, Flash arresters in place, Complying with project fire permits, Fire Ext charged and inspected)
-
Hoisting / Lifting Equipment (Rigging inspected and not defective, Cranes / Boom trucks all documents and inspections, Operator certs current, Qualified rigger/signaler)
-
Railroad (Has training, RR flagger on site, has protection limits written down, Stops work when horn is blown)
-
Any additional observations (Note them here)
-
Subcontractor Name
-
Work Performed / Location
-
CWP/JHA Package for work being performed is on site and signed
-
PPE (Hard Hat, Safety Glasses, Type 3 Vest, etc)
-
Housekeeping (Impalements protected, trash in containers, materials cleaned up and stacked to eliminate tripping hazards, portable toilets nearby and clean)
-
Fall Protection (Anything over 6' - At heights or leading edges)
-
Confined Space Entry (Gas Tester, Permit filled out, Employees trained, Blower in place, Form of rescue in place)
-
Excavations (DigAlert current, Ladder in place and secure, Competent Person on site, Shored properly, Spoil pile 2' from edge)
-
Ladders (3' above landing, Secured, Working form ladder at over 6'?' Using 3 point contact, Positioned at 4 to 1, Extension ladders separated)
-
Electrical Cords (Cords not cut and covered with tape, Guards are in place)
-
Traffic Control (Flaggers needed and/or qualified, Attenuator required, Cones/Arrow boards/Barricades/Signs and Banners properly placed)
-
Fire Protection (Oxy/Act - stored properly, Flash arresters in place, Complying with project fire permits, Fire Ext charged and inspected)
-
Hoisting / Lifting Equipment (Rigging inspected and not defective, Cranes / Boom trucks all documents and inspections, Operator certs current, Qualified rigger/signaler)
-
Railroad (Has training, RR flagger on site, has protection limits written down, Stops work when horn is blown)
-
Any additional observations (Note them here)
-
Subcontractor Name
-
Work Performed / Location
-
CWP/JHA Package for work being performed is on site and signed
-
PPE (Hard Hat, Safety Glasses, Type 3 Vest, etc)
-
Housekeeping (Impalements protected, trash in containers, materials cleaned up and stacked to eliminate tripping hazards, portable toilets nearby and clean)
-
Fall Protection (Anything over 6' - At heights or leading edges)
-
Confined Space Entry (Gas Tester, Permit filled out, Employees trained, Blower in place, Form of rescue in place)
-
Excavations (DigAlert current, Ladder in place and secure, Competent Person on site, Shored properly, Spoil pile 2' from edge)
-
Ladders (3' above landing, Secured, Working form ladder at over 6'?' Using 3 point contact, Positioned at 4 to 1, Extension ladders separated)
-
Electrical Cords (Cords not cut and covered with tape, Guards are in place)
-
Traffic Control (Flaggers needed and/or qualified, Attenuator required, Cones/Arrow boards/Barricades/Signs and Banners properly placed)
-
Fire Protection (Oxy/Act - stored properly, Flash arresters in place, Complying with project fire permits, Fire Ext charged and inspected)
-
Hoisting / Lifting Equipment (Rigging inspected and not defective, Cranes / Boom trucks all documents and inspections, Operator certs current, Qualified rigger/signaler)
-
Railroad (Has training, RR flagger on site, has protection limits written down, Stops work when horn is blown)
-
Any additional observations (Note them here)
2. Atkinson Inspections
-
Foreman's Name
-
Work Performed / Location
-
CWP/JHA Package for work being performed is on site and signed
-
PPE (Hard Hat, Safety Glasses, Type 3 Vest, etc)
-
Housekeeping (Impalements protected, trash in containers, materials cleaned up and stacked to eliminate tripping hazards, portable toilets nearby and clean)
-
Fall Protection (Anything over 6' - At heights or leading edges)
-
Confined Space Entry (Gas Tester, Permit filled out, Employees trained, Blower in place, Form of rescue in place)
-
Excavations (DigAlert current, Ladder in place and secure, Competent Person on site, Shored properly, Spoil pile 2' from edge)
-
Ladders (3' above landing, Secured, Working form ladder at over 6'?' Using 3 point contact, Positioned at 4 to 1, Extension ladders separated)
-
Electrical Cords (Cords not cut and covered with tape, Guards are in place)
-
Traffic Control (Flaggers needed and/or qualified, Attenuator required, Cones/Arrow boards/Barricades/Signs and Banners properly placed)
-
Fire Protection (Oxy/Act - stored properly, Flash arresters in place, Complying with project fire permits, Fire Ext charged and inspected)
-
Hoisting / Lifting Equipment (Rigging inspected and not defective, Cranes / Boom trucks all documents and inspections, Operator certs current, Qualified rigger/signaler)
-
Railroad (Has training, RR flagger on site, has protection limits written down, Stops work when horn is blown)
-
Any additional observations (Note them here)
-
Foreman's Name
-
Work Performed / Location
-
CWP/JHA Package for work being performed is on site and signed
-
PPE (Hard Hat, Safety Glasses, Type 3 Vest, etc)
-
Housekeeping (Impalements protected, trash in containers, materials cleaned up and stacked to eliminate tripping hazards, portable toilets nearby and clean)
-
Fall Protection (Anything over 6' - At heights or leading edges)
-
Confined Space Entry (Gas Tester, Permit filled out, Employees trained, Blower in place, Form of rescue in place)
-
Excavations (DigAlert current, Ladder in place and secure, Competent Person on site, Shored properly, Spoil pile 2' from edge)
-
Ladders (3' above landing, Secured, Working form ladder at over 6'?' Using 3 point contact, Positioned at 4 to 1, Extension ladders separated)
-
Electrical Cords (Cords not cut and covered with tape, Guards are in place)
-
Traffic Control (Flaggers needed and/or qualified, Attenuator required, Cones/Arrow boards/Barricades/Signs and Banners properly placed)
-
Fire Protection (Oxy/Act - stored properly, Flash arresters in place, Complying with project fire permits, Fire Ext charged and inspected)
-
Hoisting / Lifting Equipment (Rigging inspected and not defective, Cranes / Boom trucks all documents and inspections, Operator certs current, Qualified rigger/signaler)
-
Railroad (Has training, RR flagger on site, has protection limits written down, Stops work when horn is blown)
-
Any additional observations (Note them here)
-
Foreman's Name
-
Work Performed / Location
-
CWP/JHA Package for work being performed is on site and signed
-
PPE (Hard Hat, Safety Glasses, Type 3 Vest, etc)
-
Housekeeping (Impalements protected, trash in containers, materials cleaned up and stacked to eliminate tripping hazards, portable toilets nearby and clean)
-
Fall Protection (Anything over 6' - At heights or leading edges)
-
Confined Space Entry (Gas Tester, Permit filled out, Employees trained, Blower in place, Form of rescue in place)
-
Excavations (DigAlert current, Ladder in place and secure, Competent Person on site, Shored properly, Spoil pile 2' from edge)
-
Ladders (3' above landing, Secured, Working form ladder at over 6'?' Using 3 point contact, Positioned at 4 to 1, Extension ladders separated)
-
Electrical Cords (Cords not cut and covered with tape, Guards are in place)
-
Traffic Control (Flaggers needed and/or qualified, Attenuator required, Cones/Arrow boards/Barricades/Signs and Banners properly placed)
-
Fire Protection (Oxy/Act - stored properly, Flash arresters in place, Complying with project fire permits, Fire Ext charged and inspected)
-
Hoisting / Lifting Equipment (Rigging inspected and not defective, Cranes / Boom trucks all documents and inspections, Operator certs current, Qualified rigger/signaler)
-
Railroad (Has training, RR flagger on site, has protection limits written down, Stops work when horn is blown)
-
Any additional observations (Note them here)
-
Foreman's Name
-
Work Performed / Location
-
CWP/JHA Package for work being performed is on site and signed
-
PPE (Hard Hat, Safety Glasses, Type 3 Vest, etc)
-
Housekeeping (Impalements protected, trash in containers, materials cleaned up and stacked to eliminate tripping hazards, portable toilets nearby and clean)
-
Fall Protection (Anything over 6' - At heights or leading edges)
-
Confined Space Entry (Gas Tester, Permit filled out, Employees trained, Blower in place, Form of rescue in place)
-
Excavations (DigAlert current, Ladder in place and secure, Competent Person on site, Shored properly, Spoil pile 2' from edge)
-
Ladders (3' above landing, Secured, Working form ladder at over 6'?' Using 3 point contact, Positioned at 4 to 1, Extension ladders separated)
-
Electrical Cords (Cords not cut and covered with tape, Guards are in place)
-
Traffic Control (Flaggers needed and/or qualified, Attenuator required, Cones/Arrow boards/Barricades/Signs and Banners properly placed)
-
Fire Protection (Oxy/Act - stored properly, Flash arresters in place, Complying with project fire permits, Fire Ext charged and inspected)
-
Hoisting / Lifting Equipment (Rigging inspected and not defective, Cranes / Boom trucks all documents and inspections, Operator certs current, Qualified rigger/signaler)
-
Railroad (Has training, RR flagger on site, has protection limits written down, Stops work when horn is blown)
-
Any additional observations (Note them here)
-
Foreman's Name
-
Work Performed / Location
-
CWP/JHA Package for work being performed is on site and signed
-
PPE (Hard Hat, Safety Glasses, Type 3 Vest, etc)
-
Housekeeping (Impalements protected, trash in containers, materials cleaned up and stacked to eliminate tripping hazards, portable toilets nearby and clean)
-
Fall Protection (Anything over 6' - At heights or leading edges)
-
Confined Space Entry (Gas Tester, Permit filled out, Employees trained, Blower in place, Form of rescue in place)
-
Excavations (DigAlert current, Ladder in place and secure, Competent Person on site, Shored properly, Spoil pile 2' from edge)
-
Ladders (3' above landing, Secured, Working form ladder at over 6'?' Using 3 point contact, Positioned at 4 to 1, Extension ladders separated)
-
Electrical Cords (Cords not cut and covered with tape, Guards are in place)
-
Traffic Control (Flaggers needed and/or qualified, Attenuator required, Cones/Arrow boards/Barricades/Signs and Banners properly placed)
-
Fire Protection (Oxy/Act - stored properly, Flash arresters in place, Complying with project fire permits, Fire Ext charged and inspected)
-
Hoisting / Lifting Equipment (Rigging inspected and not defective, Cranes / Boom trucks all documents and inspections, Operator certs current, Qualified rigger/signaler)
-
Railroad (Has training, RR flagger on site, has protection limits written down, Stops work when horn is blown)
-
Any additional observations (Note them here)