Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Personal Protective Equipment
-
Hard Hats being Worn.
-
Everyone on site has eye protection on person?
-
Proper eye and ear protection is used when needed.
-
Dust masks used only after engineering contols are exhausted. (no respirators without clearance from safety)
-
Proper clothing and footwear is being worn.
-
All harnesses and lanyards inspected and in good repair
-
Gloves are used for hand protection.
-
Other:
Housekeeping
-
Steps, aisles and walkways are clear of debris.
-
Slip, trip and fall hazards removed.
-
Walkways clear of ice/snow and slippery conditions.
-
Material is stored neatly.
-
Material/trash is collected and disposed of daily.
-
General site kept free of debris.........
-
Fire hazards removed.
-
Other:
Ladders
-
Side rails extend 3 feet above the landing.
-
Ladders secured at top (and bottom as necessary).
-
Stepladders being properly used.
-
Other:
Boom and Scissor Lifts
-
Equipment is properly loaded.
-
Gates and chains are secured.
-
Safety harness and retractable used in boom lift.
-
Lifts are on flat, stable base.
-
Operators are trained.
-
Safe work distances from hazards like electricity.
-
Other;
Scaffolding
-
Scaffolding is footed properly
-
Guardrails and toe boards in place. (Note for 2x4 guardrails, max span is 4' or double 2x4 for 8'span
-
Ladders provided for accessing scaffoldig.
-
Scaffold tied into the structure (25' rise x 30' length).
-
All connections (pins, braces) in place and secure.
-
Baker staging is being properly used. (max height =4x the width, 2x the width when rolled with personnel on platform).
-
Competent person is present.
-
Daily inspection conducted and documented.
-
Safe distance from hazards like electricity.
-
Other:
Fall Protection
-
Floor and wall openings have proper barricades.
-
Cables are tight (max 3" deflection, 39" - 45").
-
Workers tying off when applicable.
-
Hole covers marked and secured. (hole=2").
-
Perimeter warning system in place on roof with safety monitor and safety monitor trained.
-
Guardrails, mid rails and toe boards in place. (Note - for 2x4 guardrails, max span is 4' or double 2x4 for 8').
-
Other:
Fire Protection
-
Fire extinguishers available for use and within 25' of any fueling station.
-
Fire extinguishers charged and inspected monthly.
-
"No Smoking" regulations observed in any such designated areas.
-
Welders and cutters have extinguishers.
-
Fire watch being used when needed.
-
Signage (flammable, etc.) in place.
-
Other:
Electrical
-
All electrical connections GFCI protected.
-
Cover plates on all swiches and outlets.
-
Weld leads in good condition. No repairs within 10' of stinger.
-
All extension cords in good condition with no tape/repair.
-
All extension cords have a grounding pin.
-
All extension cords kept out of traffic patterns to reduce trip hazards.
-
Extension cords not daisy chained.
-
Proper lighting available, protected and on own circuit.
-
Electrical hazards properly identified.
-
Electrical boxes have hard covers and breakers labeled
-
All knockouts, breakers and blanks in place - no duct tape.
-
Overhead power exposures identified and controlled.
-
Other:
Excavation/Trenching
-
Competent person present and conducting daily inspections.
-
Trenches properly sloped or shielded. (max non-protected depth is 5').
-
Trench boxes in good condition.
-
Spoil piles and materials stored 2' away from edge.
-
Ladders or ramps provided for access and egress within 25'
-
Proper barricades around trench when needed.
-
Dewatering as necessary.
-
Other:
Steel Erection
-
DEW met provisions of 1926.750 requirements.
-
1/2 inch wire cable used around the perimeter of al levels and tagged at 6' intrvals.
-
Tag lines being used on crane lifts and crane roped off.
-
A tightly planked floor or metal decking in place (<2 stories or 25')
-
There are 2 bolts at each connection, wrench tight, before tag line is released.
-
Safety latches on all hooks and pigtails.
-
The repair of any footing bolt has been engineer approved.
-
CAZ training/utilized.
-
Workers above 30' protected.
-
Workers between 15'-30' wearing fall protection.
-
Swing zone okay with no falling object exposure.
-
Site layout/sequence plan.
-
Other:
Resource Protection
-
General office materials (paper, bottles, cans) are recycled.
-
Cardboard is recycled. (Note - protect cardboard from weather)
-
Metal, concrete, asphlt, etc. is recycled.
-
Rolloffs cleary marked fr trash, cardboard, etc.
-
Opportunities for salvage/reuse being used.
-
Waste management plan has been communicated to all personal.
-
Other:
Miscellaneous
-
Forklift operators trained, certification provided.
-
Rebar caps in place where needed and impalement hazards removed.
-
Proper stairs built for access to trailers, including handrails.
-
Compressed air/flammable gas tanks upright, secure and stored properly. (Note - Oxygen tanks must be 25' from combustibles.)
-
Nails removed from lumber.
-
Formwork stacked neatly.
-
Floors kept clean.
-
Changes in floor elevation marked or easily noticeable. (max. distance of change is 19").
-
Oil, grease, etc. cleaned up properly.
-
Perimeter protection in place around cranes.
-
Confined spaces ventilated and monitored when workers are inside/spaces are permitted/rescue equipment is acceptable.
-
All personnel are kept out from under lifts.
-
Fences and gates in good condition.
-
General public kept from entering construction work areas and warning signs are posted.
-
Construction vehicles have back-up alarms and operators are wearing seat bels.
-
Fuel being stored in proper containers.
-
Weekly safey meetings (toolbox talks) being held with ALL subcontractors being included.
-
There were no unsafe acts observed.
-
Portable toilets and clean up facilities adequate.
-
First Aid supplies adequate and FA/CPR personnel available.<br>
-
Nearby medicaal facilities identified.
-
All posters including Safety and Human Resources posted.
-
Hazcom materials, including subcontractors available and disseminated.
-
Nail guns sequential fire only - no impulse allowed.
-
Compressors drained daily.
-
No pinch point exposures noted. All hands kept inside lifts while moving.
-
Other: