Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Administration and First Aid
-
Has an audit on administrative procedures been carried out for this project?
-
1.1 Safety Management Plan available or review?
-
1.2 Site inductions for workers, sub-contractors & visitors being carried out in accordance with SMP?
-
1.3 Supervisory arrangements in accordance with SMP?
-
1.4 Required training, licenses and skills register maintained in accordance with SMP?
-
1.5 SWMS for High Risk Construction Work reviewed and monitored in accordance with SMP?
-
1.6 Sub-contractor SWMS reviewed in accordance with SMP?
-
1.7 Incident Notification process in accordance with SMP?
-
1.8 Site safety inspections, safety walks, or audits carried out in accordance with SMP?
-
1.9 Toolbox meetings, site meetings or other consultative arrangements being conducted in accordance with SMP?<br> Take photos of toolboxese tic.
-
1.10 Emergency response plan displayed on site?
-
1.11 Emergency evacuation procedure displayed on site/
-
1.12 Adequate First Aid kit on site?
-
1.13 Access available to trained first aider/s?<br> Copy of certificate
-
1.14 Plant and equipment register maintained in accordance with SMP?
-
1.16 Hazardous chemical/substance register maintained in accordance with SMP?
-
1.17 Safety Data Sheet register maintained in accordance with SMP?
-
1.18 Safety Data Sheets available on site?
-
1.19 Traffic Management Plan in place in accordance with SMP?
-
1.20 Does SMP identify any activities requiring permits to be used, (i.e. Hot Works, Excavation Work)?
-
1.21 Is an Environmental Management Plan in place for the site?
-
1.2.1 Pick 3 persons signed in for the day and check against induction records.<br> Take photos of induction form.
-
1.3 Is the first aid shed/office clearly identified as such with the correct signage. (White cross on green background)?
-
1.4 Open the 1st aid kit and check for certification every 12 months.
-
1.5 How many 1st aiders are on site. Should be a ratio of 1 to 25 in a high risk/construction environment?
-
1.6 Is there a first aid room ? Should be a facility for this if 100 workers or more.
-
1.7 How is 1st aid managed ? Principal contractor is responsible to ensure they supply it or the sub-contractor manages it and has available 1st aiders.
2. Site Security
-
2.1 Site fencing adequate to prevent unauthorised access?
-
2.2 Is Site Signage displayed, and in a prominent and easily visible place?
-
2.3 Does signage include the name of the PC carrying out the building works?
-
2.4 Does signage give the location of the site office?
-
2.5 Specify an after hours contact number?
HIGH RISK ACTIVITIES
3.1 Working at Heights
-
3.1 Are there workers working at heights above 2m on site today?
-
3.1.1 Has a SWMS for this task been implemented ?<br> Photo of SWMS.
-
3.1.2 Are adequate fall protection measures in place?
-
3.1.3 Are Fall Arrest Devices (FAD) being used as the means of fall protection (i.e. Harnesses)?
-
3.1.4 Is there evidence that the FAD has been regularly inspected and maintained?<br>Photo of inspection tag.
-
3.1.5 Are workers trained in use of FADs. Photo of Safe Working at Height certificate.
-
3.1.6 Have permanent anchor points been inspected and certified within the last year ?<br>If used take photo.
-
Is there a permit system to use a harness ?<br>Copy of permit.
-
3.1.8 If there is a permit system has it been filled in and is a copy with the worker ?
-
3.2 Are Extension ladders being used to access work areas?
-
3.2.1 Are ladders in good condition and safe for use?<br>Photo of ladder.
-
3.2.2 Are ladders adequately secured top and bottom?
-
3.2.3 Are ladders erected at approx a 1:4 ratio?
-
3.2.4 Is ladder erected to extend 1 metre past step off point?
-
3.3 Are Step Ladders being used to access elevated work areas?
-
3.3.1 Are ladders in good condition and safe for use?
-
3.3.2 Are ladders specified for industrial use?
-
3.3.3 Are ladders being used in accordance with manufacturers recommendations (i.e. not or electrical work/do not stand on top two rungs)?
-
3.4 Are Elevated Work Platforms (EWP) being used to access elevated work areas (i.e. Scissor lifts, boom lift)?
-
3.4.1 Are EWPs in good condition and safe for use?
-
3.4.2 Are log books being regularly filled out?<br>Photo of log book.
-
3.4.3 Are High Risk Work Licenses required for this type of plant? Boom lifts over 11m require (WP) license.
-
3.4.3.1 Are operators appropriately licenced?
-
Take copy of license.
-
3.4.3.2 If a boom lift is used are operators using a connected safety harness?
-
3.5 Are Mobile Scaffolds being used to access elevated work areas?
-
3.5.1 Are Mobile Scaffolds in good condition and safe for use?
-
3.5.2 Does mobile scaffold have internal ladder access?
-
3.5.3 Are work platforms fitted with kick boards?
-
3.6 Are there excavations deeper than 1.5 Meters on site ?
-
3.6.1 Is the excavation battered, benched or shored to prevent a collapse.
-
3.6.2 Is safe access provided? (Ladders, ramped access that is clear of loose material and not excessively sloped or steps cut into bank less each than in height)
-
3.6.6 Are barricades in place to prevent falls ?
4. Plant and Equipment
-
4.1 Is Mobile Plant being used on site today (backhoe, telescopic handler, mobile crane, vehicle loading crane)?
-
4.1.1 Is Mobile Plant in good condition and safe for use?
-
4.1.2 Has a SWMS for HRCW been implemented for this work?
-
Has a risk assessment or a JSA been conducted ?
-
4.1.3 Is Traffic Management Plan in place in accordance with SMP?
-
4.1.4 Has mobile plant been regularly inspected, tested and maintained?
-
4.1.5 Does mobile plant involve lifting equipment?
-
4.1.5.1 Are slings, chains and associated lifting equipment regularly inspected and well maintained? A dated tag or similar should be visible.
-
4.1.5.2 Is SWL information displayed?
-
4.1.5.3 Are operators appropriately licensed (HRWL). Should have DG or Dogman class.?
-
Take photo of license.
-
4.2 Are Electrical Power Tools being used on site today?
-
4.2.1 Are Power Tools in good condition for use?
-
4.2.2 Are Power tools tested and tagged in accordance with AS/NZ 3012:2010?
-
4.2.3 Are Power Tools specified for industrial use?
-
4.2.4 Are Power Tools supplied through a portable RCD?
-
4.2.5 Are portable RCD's tested and tagged in accordance with AS/NZ 3012:2010?
-
4.3 Are Extension Leads being used on site today?
-
4.3.1 Are Extension Leads in good condition and no exposed wires?
-
4.3.2 Are Extension Leads tested and tagged in accordance with AS/NZ 3012:2010? Minimum every 3 months
-
4.3.3 Are Extension Leads appropriately suspended off the ground?
-
4.3.4 Are Extension Leads being used correctly (i.e. not joined together)?
-
4.3.5 Are portable RCD's tested and tagged in accordance with AS/NZ 3012:2010?
-
4.4 Are Electrical Portable Outlet Devices (EPODs) being used on site today (power boards)?
-
4.4.1 Are EPODs suitable for construction work (i.e. not domestic type)?
-
4.4.2 Are EPODs in good condition and not damaged?
-
4.4.3 Are EPODs tested and tagged in accordance with AS/NZ 3012:2010?
-
4.5 Is other Electrical Plant being used on site today (cement mixers, tile elevators, etc)?
-
4.5.1 Is the identified equipment in good condition and safe for use?
-
4.5.2 Is the identified equipment tested and tagged in accordance with AS/NZ 3012:2010?
-
4.5.3 Is the identified equipment supplied through a portable RCD?
-
4.5.4 Are portable RCD's tested and tagged in accordance with AS/NZ 3012:2010?
-
4.6 Are items of Plant powered by petrol or diesel motors being used on site today (cement mixers, tile elevators, etc)?
-
4.6.1 Is the identified equipment in good condition and safe for use?
-
4.6.2 Is the identified equipment set up in well a ventilated area?
-
4.6.3 Are fuel containers adequately stored in well ventilated and secure area?
-
4.7 Are petrol or diesel generators being used on site today?
-
4.7.1 Are Generators in good condition and safe for use?
-
4.7.2 Are generators fitted with a built in RCD?
-
4.7.3 Are RCD's tested and tagged in accordance with AS/NZ 3012:2010?
-
4.7.4 Are Generators set up in well a ventilated area?
-
4.7.5 Are fuel containers adequately stored in well ventilated and secure area?
5. Scaffolds
-
5.1 Is Modular or Kwik stage scaffold erected on site today?
-
5.1.1 Is scaffold complete and safe for use?
-
5.1.2 Does Scaffold have a current Scaffold Tag ? Date should be within 30 days expiry.
-
5.1.3 Is access to work decks installed correctly and safe for use?
-
5.1.4 Do work decks have adequate hand rails installed (top & mid rails)?
-
5.1.5 Are kick boards installed on work decks?
-
5.1.6 Are mesh guards installed where work decks have building materials stored on them?
-
5.1.7 Are sole boards visible and every standard has one positioned under it ?
-
Is A frame or trestle type scaffold in use
-
Is adequate fall protection in place ?
-
Is there safe access to the work deck ?
6. Temporary Electrical Installation
-
6.1 Is mains power connected to provide temporary power to site?
-
6.1.1 Are socket outlets protected by an RCD?
-
6.1.2 Does RCD have a current inspection Tag ?
-
6.1.3 Does switchboard allow for leads to be entered so that lid can be closed without damaging leads?
-
6.1.4 Is switchboard easily accessible and free of obstruction?
-
6.1.5 Are enough switchboards installed to ensure leads do not need to be joined together to reach work areas?
-
6.1.6 On multi level sites, are switchboards located to ensure leads are not run from one level to another?
-
6.1.7 Are sockets outlets overloaded ?
-
6.1.8 Does electrical contractor have an effective electrical isolation procedure?
-
6.2 Are site sheds connected to mains power?
-
6.2.1 Is supply to site shed hard wired to a circuit breaker?
-
6.2.2 Is site shed supply cable installed to prevent mechanical damage?
-
6.2.3 Are extension leads being run out of site shed to supply work areas?
-
6.2.4 Are socket outlets in site shed protected by RCD?
-
6.3 Are overhead power lines present on or adjacent on this site?
-
6.3.2 Is plant or equipment operating near or under overhead conductors?
-
6.3.1 Are power line conductors fitted with visual warning indicators (tiger tale, line flags) ?
7. Personal Protective Equipment (PPE) & Permit Works
-
7.1 Does site have a sign indicating minimum PPE requirements, (i.e. hard hats, safety boots, Hi Vis)?
-
7.1.1 Are workers wearing PPE in accordance signage requirements?
-
7.2 Are workers wearing appropriate PPE for specific hazardous tasks, (i.e. using angle grinder)?
-
7.3 Are any activities being carried out requiring a permit as identified in the SMP?
-
7.3.1 Have permits been completed and approved prior to works commencing?
8. Work Environment
-
8.1 Do workers have ready access to adequate amenities? (toilets, wash areas, lunch rooms, etc)
-
8.2 Is site well maintained, clean and tidy, (i.e. good housekeeping)?
-
8.3 Is lighting sufficient?
-
8.4 Is adequate noise/ vibration control in place if required?
-
8.5 Are there any other uncontrolled hazards not already covered
-
8.6 Audio-metric testing. Ask for evidence of audiometric testing if applicable. Testing should be done if PPE is used as a control measure, i.e. ear plugs or muffs, and the worker has been there 3 months or more
9. Environmental Hazards
-
9.1 Are adequate controls in place to prevent contaminants entering stormwater drains?
-
9.2 Are adequate dust suppression controls in place?
-
9.3 Are the excavations that could affect Underground services being worked on
-
9.3.1 Is there a system in place to check for underground services such as a permit system?
-
9.3.2 Has the system been implemented
-
10.0 Are any works required to stop ? Provide detail.
Corrective Actions
-
All items identified in this audit must be addressed by the contractor responsible for the site.
The contractor must use a risk based approach to address any issues. Where there is a need to implement an interim control until the hazard can be permanently addressed this must be documented.
Where there has been a system failure DHA will require a written plan to address how the company will prevent a re-occurrence. -
Enter any corrective actions that have been discussed onsite.
-
Additional photos taken from audit.
Sign Off
-
On site representative
-
Auditor's signature