Information
-
SITE NAME:
-
SITE LOCATION:
-
CONDUCTED ON:
-
PREPARED BY:
-
DOCUMENT NUMBER:
-
Persons onsite at time of inspection.
- Project Manager
- Project Surveillance Officer
- Contractor
- Team Leader
- Other
SCOPE OF INSPECTION:
-
Visual assessment of accessible areas of the site to identify major and minor defects. This has been a visual inspection only in the form of a walk-through and excludes opening up structures, removing and dismantling of building materials for detailed examination.
EXTERNAL DEFECTS:
-
List visible external defects with as much detail as possible, including photos and accurate location.
Defect
-
Location:
- Main Road
- Side Road
- Entry road
- Fencing
- Gates
- Bollard
- Signage
- Asphalt
- Curb
- Gutter
- Stormwater Pit
- Sewer Pit
- Crossover
- Driveway
- Nature strip
- Footpath
- Vegetation
- Fencing
- Adjacent properties
- Main Building
- Ground (divots, holes, trenches)
- Trees
- Bench
- Power Cabinet
- Post
- Joist
- Handrail
- Stairs
- Decking
- Bearer
- footings
-
Details of defect:
-
Defect marked with tape/spray paint?
-
Why Not?
- Defect area is scheduled to be removed at commencement of works
- Defect area not reachable
- Defect cannot be marked
-
Photos:
INTERNAL DEFECTS:
-
List visible internal defects with as much detail as possible, including photos and accurate location.
Defect
-
Location:
-
Details:
-
Defect marked with tape/spay paint?
-
Why Not?
- Defect area is scheduled to be removed at commencement of works
- Defect area not reachable
-
Photos:
GENERAL COMMENTS:
-
Comment on the overall state of the site, infrastructure, vegetation and roads, including proposed site envelope and adjacent areas.
-
undefined