Title Page
-
Address / Property
-
Address of property
-
Conducted on
-
Prepared by
-
Weather conditions
-
Type of property
-
undefined
-
Did you gain access
Specification
-
Kitchen:
Damp and Mould
-
Are there signs of damp and mould
-
What is the Relative Humidity of the room
-
What is the Temperature of the room
-
Lounge:
Damp and Mould
-
Are there signs of damp and mould
-
Hallway & Landing:
Damp and Mould
-
Are there signs of damp and mould
-
What is the relative humidity of the room
-
what is the temperature of the room
-
Bathroom:
Damp and Mould
-
Are there signs of damp and mould
-
Separate W/C (if applicable):
Damp and Mould
-
Are there signs of damp and mould
-
Bedroom 1:
Damp and Mould
-
Are there signs of damp and mould
-
Bedroom 2 (if applicable):
Damp and Mould
-
Are there signs of damp and mould
-
Bedroom 3 (if applicable):
Damp and Mould
-
Are there signs of damp and mould
-
Bedroom 4 (if applicable):
Damp and Mould
-
Are there signs of damp and mould
-
Airing Cupboard
-
Garden (rear):
-
Front Garden:
-
Communal Area
-
Entrance doors
-
Clear communal areas
-
Photos
-
Gas & Electric
-
Gas Meter Details:
-
Gas Meter Readings:
-
Electric Meter Details:
-
Electric Meter Readings:
Property Dimensions
-
Kitchen:
-
Lounge:
-
Hallway & Landing
-
Bathroom:
-
W/C (If Applicable):
-
Bedroom 1:
-
Bedroom 2 (if Applicable):
-
Bedroom 3 (if Applicable):
-
Bedroom 4 (if Applicable):
-
Garden (Rear):
-
Front Garden:
Property Photos
-
Kitchen:
-
Lounge:
-
Hallway & Landing:
-
Bathroom:
-
W/C (if applicable):
-
Bedroom 1:
-
Bedroom 2 (if Applicable):
-
Bedroom 3 (if Applicable):
-
Bedroom 4 (if Applicable):
-
Garden (Rear):
-
Front Garden:
Dilapidation Report Completion
-
Signature of supervisor / appointed surveyor:
Post Works Sign-off
-
All works included with dilapidation schedule / specification above completed?
-
Electrical works within address complete and certification held with Void Coordinator?
-
Void cleaned to lettable / good standard?
-
Void clear of all debris / items (including external areas)?
-
Garden/s clear and cut back (including all hedges, shrubbery, and grass)?
-
2x communal fobs / keys present (if property is located within a secured block)?
-
Metres Clear / Debt Free?
Post Inspection - Photos Of All Areas
-
Kitchen:
-
Work carried out to specification
-
Lounge:
-
Work carried out to specification
-
Hallway & Landing:
-
Work carried out to specification
-
Bathroom:
-
Work carried out to specification
-
W/C (if applicable):
-
Work carried out to specification
-
Bedroom:
-
Work carried out to specification
-
Bedroom 2 (if applicable):
-
Work carried out to specification
-
Bedroom 3 (if applicable):
-
Work carried out to specification
-
Bedroom 4 (if applicable):
-
Work carried out to specification
-
Garden (Rear):
-
Work carried out to specification
-
Front Garden:
-
Work carried out to specification
-
Communal Areas
-
Work carried out to specification
Post Inspection Sign Off
-
Signature of Surveyor
-
Name of Surveyor
-
Date of post Inspection