Information
-
Document No.
-
Audit Title
-
NMI#
-
Conducted on
-
Prepared by
-
Location
-
Photo of site
-
Tech being audited (ID#)
-
Date and time of audit
Pre-job assessment
-
Inspect site for possible hazards
-
Contact customer (if required)
-
Confirmed safe access to meter box
-
perform hazard assessment of meterboard
-
confirm meter serial number matches job sheet / palm pilot
Job completion
-
Read and record meter reading(s)
-
Put on low voltage glove(s), outer protective glove(s) & safety glasses
-
Remove meter cover seal
-
Remove meter cover
-
Remove load side tail - multiphase meter will require multiple tails to be removed
-
Cap tails with plastic/rubber sleeve
-
Tape tail cap completely, ensure there are no frayed or exposed wires
-
Secure tailing under meter cover, ensure tails are completly inside meter
-
Secure meter cover
-
Double seal meter cover with 2 NEW seals
Finish and vacate site
-
Tidy area including removing old seals from bottom of meter box
-
Complete "disconnection notice" and give to customer, or put in letterbox, under door, in meter box
-
Vacate site
-
Tech being audited
-
Auditor