To be completed BEFORE leaving site.
-
Project Name
-
Conducted on
-
Completed by:
Checklist
Space
-
Has the space/area been left clean and tidy with no damage to space or items belonging to others. (photograph(s) required)
Dismantle Checklist
-
All items have been dismantled with due care and attention.
-
Have all fragile items been labelled with FRAGILE stickers
-
All items are wrapped and/or crated where appropriate. (photographs required)
Loading Checklist
-
All stand components have been loaded and are secure for transportation. (Photographs required)
-
Site box and tools within are loaded and secured for transportation (Photograph required)
-
Are there any additional items loaded e.g. the client has left something or asked us to bring back.
Breakages / items missing
-
Are there any breakages / items missing that need to be flagged with your line manager? (Please add details and photographs of any damage).
Lead person signing off
-
Client Name
-
Client comments