Title Page
-
Customer
-
Site
-
Scaffold Location
-
Scaffold Type
- Tower
- Independent
- Beamed Independent
- Birdcage / Crash Deck
- Cantilever Scaffold
- Pavement Gantry
- Pavement Gantry + Protection Fan
- Chimney Stack
- System Staircase
- Other
-
Scaffold Supervisor
-
Men on Site
-
Time & Date
Site & Team Information
-
RAMS on site, accessible and signed by all operatives
-
Do all operatives have the correct skills/knowledge/experience and training to dismantle
Work Area
-
Has the Vehicle been parked safely?
-
Have barriers / signs been placed as and where required?
-
Are all pedestrian footpaths clear of obstructions?
-
Can the vehicle be loaded/unloaded safely?
-
Is the work area around the scaffold safe for dismantling?
-
Is there a first aid box present with sufficient in date supplies?
Pre Dismantle Checklist
-
Is the scaffold structure free from damage?
-
Are scaffold foundations in good condition and free from damage?
-
Has a safe storage area being established so that the scaffolding being dismantled can be stored safely?
-
Is there a safe method of work to lower materials?
-
Have exclusion zones been installed to protect members of the public and any 3rd parties?
-
Have all access routes been established and are they free from obstructions?
-
Have weather conditions been risk assessed and are they deemed acceptable for dismantling works to begin?
-
Are all ties currently installed?
-
Are all boards in place?
-
Are all toe boards in place?
-
Are all guardrails in place?
-
Are all Braces installed?
-
Are all transoms in place?
-
Are all access ladders in place?
-
Are all scaffold elevations free from obstructions?
Dismantling Plan Sign off
-
Supervisor Signature