Title Page

  • TPG Job Number

  • DB Reference

  • Client

  • Site

  • Conducted on

  • TPG Engineer

Test Equipment

  • IR Tester Calibration Number & Due Date

  • M8 Torque Wrench & Due Date

General Checks

  • Paintwork

  • Incoming Connections Torque Tested

  • Outgoing MCB/RCBO Devices Fitted

  • Outgoing MCB/RCBO Devices Torque Tested

  • Outgoing Metering - P1 On CT Facing Outgoing Device

  • Incomer Metering - P2 On CT Facing Mains Incomer

  • Small Voltage/CT Cabling Pull Check On All Terminations

  • DB Switchboard Fully Vacuumed

  • Isolation Sliders Closed

  • Title Labels Installed As Per G.A Drawing

  • Surge Device Fitted & Connections Torque Tested

  • Metering Device Installed

  • Current Transformer Installed

  • Number Of Ways

  • PM3255 Metering Device

  • PM5110/PM5111 Metering Device

  • Rayleigh RI-F400/RI-F300 Metering Device

  • Rayleigh RI-360/380/460/480

End to End Continuity Test

  • Operate Mains Incomer Into Closed Position

  • Connect Test Probe 1 On Incoming Terminal - L1

  • Connect Test Probe 2 On End Of Main Busbar - L1

  • Connect Test Probe 1 On Incoming Terminal - L2

  • Connect Test Probe 2 On End Of Main Busbar - L2

  • Connect Test Probe 1 On Incoming Terminal - L3

  • Connect Test Probe 2 On End Of Main Busbar - L3

  • Connect Test Probe 1 On Incoming Terminal - N

  • Connect Test Probe 2 On End Of Main Busbar - N

  • Connect Test Probe 1 On Incoming Earth Bar

  • Connect Test Probe 2 On End Of Outgoing Earth Bar

  • Operate Mains Incomer Into Open Position

  • Operate Bus-Coupler Into Open Position

Insulation Resistance Test

  • ENSURE ALL FUSES HAVE BEEN REMOVED PRIOR TO TESTING

  • ENSURE SURGE MCB IS IN THE OPEN POSITION, IF 3P ENSURE NEUTRAL IS DISCONNECTED

  • TEST METER PRE TESTING BY SHORTING PROBES OUT AND CONFIRM 0MΩ

  • L1 - EARTH (MΩ)

  • L2 - EARTH (MΩ)

  • L3 - EARTH (MΩ)

  • L1 - L2 (MΩ)

  • L1- L3 (MΩ)

  • L2 - L3 (MΩ)

  • L1 - NEUTRAL (MΩ)

  • L2 - NEUTRAL (MΩ)

  • L3 - NEUTRAL (MΩ)

  • NEUTRAL - EARTH (MΩ)

  • TEST METER POST TESTING BY SHORTING PROBES OUT AND CONFIRM 0MΩ

  • ENSURE ALL FUSES HAVE BEEN RE-INSTATED POST TESTING

  • ENSURE NEUTRAL CABLE HAS BEEN RE-CONNECTED IF DISCONNECTED ON 3P DEVICE

Snagging Items

  • Item No.1

  • Item No.2

  • Item No.3

  • Item No.4

  • Item No.5

  • Item No.6

  • Item No.7

  • Item No.8

  • Item No.9

  • Item No.10

  • Item No.11

  • Item No.12

  • Item No.13

  • Item No.14

  • Item No.15

  • Item No.16

  • Item No.17

  • Item No.18

  • Item No.19

  • Item No.20

Sign off

  • TPG TEST ENGINEER

  • ASSEMBLED BY

  • SIGNATURE

  • TEST ENGINEER NOTES

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.