Title Page
-
Site conducted
-
Site Name
-
Site ID
-
Site Location
-
Electrical Contracting Company Name
-
Electrical Engineer Name
-
ADM responsible for the site
Sign Off LOG
- FCU
-
images are required against all responses
-
DP ID
-
Is the cabinet door earth bonded to the cabinet body correctly
-
Is the cabinet locked to prevent unauthorized access to live services
-
Are all connections tug tight ?
-
Is the un-switched fused connection unit labelled in accordance with the Hyperoptic electrical policy
-
Is the cable supported to regulation detailed within section 5 of the BS7671 2018
-
Is the fire stopping in line with the Hyperoptic guidance pack
-
Is the fire stopping label complete to Hyperoptic standards
-
Is the consumer unit labelled in accordance with the Hyperoptic electrical policy
-
Are the test results within the regulatory parameters of section 6 of the BS7671.
-
Is the next test due date sticker present on the existing distribution board
-
All electrical certificates must be submitted with 5 days of completion .
-
if you require further information on the firestopping guidance please contact a member of the field compliance team @ lee.hammond@hyperoptic.com
Additional Notes
-
All additional notes must be supplemented with supporting images where applicable
-
Additional Notes
-
Add media
Sign Off
-
Electrical Engineer Signature
-
Sign Off Completion Date