Title Page

  • Site conducted

  • Site Name

  • Site ID

  • Site Location
  • Electrical Contracting Company Name

  • Electrical Engineer Name

  • ADM responsible for the site

Sign Off LOG

    FCU
  • images are required against all responses

  • DP ID

  • Is the cabinet door earth bonded to the cabinet body correctly

  • Is the cabinet locked to prevent unauthorized access to live services

  • Are all connections tug tight ?

  • Is the un-switched fused connection unit labelled in accordance with the Hyperoptic electrical policy

  • Is the cable supported to regulation detailed within section 5 of the BS7671 2018

  • Is the fire stopping in line with the Hyperoptic guidance pack

  • Is the fire stopping label complete to Hyperoptic standards

  • Is the consumer unit labelled in accordance with the Hyperoptic electrical policy

  • Are the test results within the regulatory parameters of section 6 of the BS7671.

  • Is the next test due date sticker present on the existing distribution board

  • All electrical certificates must be submitted with 5 days of completion .

  • if you require further information on the firestopping guidance please contact a member of the field compliance team @ lee.hammond@hyperoptic.com

Additional Notes

  • All additional notes must be supplemented with supporting images where applicable

  • Additional Notes

  • Add media

Sign Off

  • Electrical Engineer Signature

  • Sign Off Completion Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.