Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Operative being assessed
Tools and equipment
-
Calibrated, certificated test standpipes
-
Electronic test equipment
-
Pressure testing warning signs (MP mains)
-
Pipe anchorage systems. (Refer to SGN/WI/DIS/4.2.2 - Anchorage systems operating up to 7bar <br>– operatives)
-
Air compressor 80cfm-100cfm, foot pumps
Installation of standpipes &pressure gauges
-
Standpipes and gauges must be connected in accordance with Figure 95 in (SGN/WI/ML/2) and the following
must be carried out: -
Standpipes must be located at all extremities of the new main and incorporate a relief valve set to<br>lift at a pressure 10% above the specified test pressure
-
Pressure test instruments must be installed so that they can be read and operated without <br>entering the trench or standing in line with the end of the main
-
Pipe systems under test must be restrained against movement. For all fused systems, it is<br>sufficient to backfill the pipe under test
-
Test standpipes must all be of welded construction, have a current test certificate and be tested <br>for soundness immediately prior to testing the pipeline or main
-
Warning notices must be prominently displayed to warn that pressure testing being carried out
Pressure test requirements
-
Suitable test instruments are bourdon test gauges for LP mains or electronic testers for both LP and MP <br>mains. The following must be checked before pressurising the main:
-
As determined by the Operation Manager an NRO/RO procedure must be authorised and all safety precautions carried out prior to the test commencing
- Yes
- No
- N/A
-
To minimise the effect of temperature variation; the main under test should be backfilled as much <br>as possible and If the effects of temperature are to be taken into account this will be detailed in<br>the NRO/RO procedure
-
Both LP and MP mains must be maintained at 350mbar air pressure, post testing, if purging and <br>commissioning is delayed
-
All fittings must be approved for use
-
Test the pressure relief values on the standpipes to ensure that they are set to operate at 10% <br>above the test pressure
-
All values must be tested in the open position and sealed with a blank flange
-
As applicable the Operation Manager or Operative must brief all team members on the test <br>process prior to and during the test period
-
Use approved electronic test instruments that provide absolute pressure readings
Test requirements for MP mains
-
The Operation Manager will specify the pressure test requirements that will be<br>required and will provide a NRO/RO procedure. The following factors must be taken into account:
-
Noise levels whilst pressure testing is to be kept to a minimum
- Yes
- No
- N/A
-
If a hydrostatic test is deemed necessary, then this must be undertaken in accordance with<br>Section G3, (SGN/WI/ML/2)
-
Creep occurring in PE pipe must be accurately accounted for
-
Where creep allowances are to be applied to PE mains tests, it is important that the exact <br>conditioning time is established by recording the time of commencing pressurisation and the time <br>at which the first test reading is taken. Conditioning time includes the effects of the 2-hour<br>stabilisation period. The Operational Manager will determine the conditioning time
Pressurisation of the main
-
A Competent Operative must be in attendance at the pressurising point during the pressurisation<br>period to ensure that the necessary safety requirements are met
-
No person must enter the designated test area or interfere with the pipe work whilst the pressure<br>is being raised
-
A single or twin tool compressor (80 cfm to 100 cfm) with an inline fitter or foot pump is adequate for pressurising the majority of pipe systems
- Yes
- No
- N/A
-
Examine flexible pipes, hoses and their connections prior to use to ensure they are fit for their <br>intended purpose. They must be secured and anchored by a secondary restraining device, (whip<br>check) to prevent movement as a precaution in the event of failure<br>
-
Air must be introduced under controlled conditions into the main until the appropriate test<br>pressure is reached
-
The time of commencing pressurisation must be recorded on the test certificate
-
Do not over pressurise the main
Pressure test
-
Before the start of the test period, the temperature of the air in the main must be allowed to<br>stabilise before the test period commenced
-
For metallic mains and low-pressure PE mains, this will normally occur within 2 hours, and will be<br>indicated by a stable pressure reading
-
For Medium Pressure PE mains, the effects of creep must be taken into account and the <br>conditioning time allowed as specified by the Operation Manager
-
All exposed mechanical joints must be tested for leakage upon initial pressurisation with an <br>approved leak detection fluid
-
Following the period of the temperature stabilisation, the initial pressure reading must be taken. <br>For PE mains at MP (where the effect of creep is being taken into account) the first test readings<br>must be taken at the end of the conditioning time period<br>
-
A further pressure reading must be taken at the end of the test period
-
Where a long duration pressure test period (i.e. over 24 hours) is to be undertaken, the <br>Operational Manager may specify intermediate pressure readings; so, that the test may be<br>assessed and aborted at an early stage if there is an indication that the test will ultimately fail<br>
-
The Operative or Operational Manager responsible for the pressure test must completer the test <br>certificate
-
The Operative responsible for the pressure test must be in attendance at the end of the test to <br>witness de-pressurisation and this must be recorded on the test certificate
Test Failure
-
The test pressure should be reduced before carrying out an examination of the pipe work
-
All exposed connections plugs and external fittings must be re-examined for possible leakages by<br>leak detection fluid
-
Care must be taken to undertake any repairs with the appropriate tools without applying <br>excessive force
-
Where no obvious cause can be attributed to a pressure test failure and the test conditions have <br>not altered, the Operation Manager can decide to extend the test, using the final or an <br>intermediate test reading as the main starting point for the new period. However, if the mains<br>pressure has been reduced then the main must be re-pressurised to the test pressure and test<br>procedure carried out as above. In the case of pressure tests on MP PE mains, the revised creep<br>allowance must be established following calculation of the new conditioning time.
-
Where an MP PE main is to be retested following de-pressurisation, it must remain at atmospheric <br>pressure for a minimum of three hours before re-pressurisation, to allow creep from the original <br>test to relax. The creep allowance for the retest can then be obtained from the appropriate table
-
Where a test failed, further investigations using tracing techniques or sectioning of the main as <br>detailed by the Operational Manager can be carried out
De-pressurisation of main:
-
The air must be released by opening the vents on the pressure test standpipes or vent pipe<br>situated on the extremities of the main until atmospheric pressure within the main is achieved. <br>This ensures that the entire system under test has been included in the test
-
Due to the noise of the venting air, ear protection may be required<br>
-
Measures must be taken to minimise noise generated during de-pressurising and its impact of the <br>public
-
The Competent Operative must confirm, by checking the gauges installed at the extremities, that<br>the pressure within the whole of the main has been reduced to atmospheric
-
The Competent Operative responsible for the pressure test must record this information on the <br>test certificate before authorising further construction work to proceed
Test Records
-
The test certificate must be completed and passed to the Operational Manager or returned in the<br>project file on completion of the works.
Sign off
-
Name of assessor
-
Pass or refer for further training