Information

  • Document No.

  • Principal Contractor

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • DGSS174 FRAMEWORK DOCUMENTATION AUDIT Rev 0 - 02/01/2018

STANDARD INFORMATION

  • BRANCH MANAGER

  • CONTRACT MANAGER

  • PROJECT / CONTRACT

  • SITE SUPERVISOR / FOREMAN

  • CLIENT

  • SITE ADDRESS

  • SECTOR OF WORKS

  • JOBNUMBER

  • Dodd Group Undertaking Principal Contractor Duties

  • Dodd Group Undertaking Contractor Duties

  • Direct employees

  • Agency/Sub-contractor staff employed by Dodd Group

CDM CONSTRUCTION PHASE PLAN

  • Is there an appropriate CPP and has it been reviewed and approved by the Contracts Manager & QHSE ?

  • Are details of any amendments correctly recorded ?

SECTION 1: DESCRIPTION OF PROJECT

1.1 Framework Description and Programme

  • Does the Plan correctly address the Framework Description & Programme ?

  • Does the Plan effectively address Framework location/address ?

  • Does the Plan identify hours of working ?

  • Does the Plan identify the timescales of the Framework ?

  • Does the Plan indicate if an HSE F10 notification is required ?

  • Is a copy of the relevant F10 available (if required) ?

1.2 Duty Holders

  • Does the Plan correctly identify the relevant Duty Holders ?

1.3 Existing Records and Plans

  • Does the Plan effectively address any existing records and plans ?

SECTION 2: MANAGEMENT OF THE WORK

2.1 Management Structure and Framework Management

  • Does the Plan correctly identify the Management and Framework Management Structure ?

2.2 Framework Health, Safety and Environmental Aims

  • Are the Aims of the Framework documented ?

2.3 Temporary Works

  • Are Temporary Works applicable to this site ?

2.4 Site Rules

  • Does the Plan effectively address Framework Rules including PPE requirements ?

2.5 Arrangements to Ensure Co-operation Between the Project Team

  • Does the Plan effectively address arrangements to ensure effective Liaison, Communication, Exchange of Information and Monitoring ?

2.6 Arrangements for Selecting and Involving Workers

  • Does the Plan effectively address Selection, Consultation and Training Requirements ?

2.7 Site Inductions

  • Does the Plan effectively address Framework Inductions ?

2.8 Welfare Facilities

  • Does the Plan effectively address welfare provisions ?

2.9 Accident / First Aid Arrangements

  • Does the Plan effectively address Accidents and First Aid arrangements ?

  • Does the Plan name Emergency First Aid Trained Personnel ?

2.10 Fire, Emergency and Security Arrangements

  • Does the Plan effectively address Fire, Emergency and Security Arrangements ?

  • Does the Plan provide details of the nearest Hospital with an A&E Department and details of how to get to it ?

SECTION 3: CONTROL OF SPECIFIC RISKS

  • Does the Plan effectively address Control Of Specific Framework Risks? Ensure that only those that are applicable to the Framework are included.

SECTION 4: SAFE SYSTEMS OF WORK

  • Does the Plan effectively address Safe Systems of Work ?

  • Does the Plan effectively address which Permit to Work are required on the Framework ?

FRAMEWORK SHE FILE

Policy Documents

  • Is there a copy of the current Health & Safety Policy DGSS001 displayed or held within the file ?

  • Is there a copy of the current Quality Policy DGQMS0002 displayed or held within the file ?

  • Is there a copy of the current Environmental Policy DGES0002 displayed or held within the file ?

Section 1. Framework Inductions

  • For Commercial Contracts, is there a Framework Induction Record (DGSS015) for each operative (direct, agency and subcontractor) and is it filled out correctly (including CSCS card details) ?

  • For Property Care, is there a Framework Induction Record (DGSS053) for each operative (direct, agency and subcontractor) and is it filled out correctly ?

Section 2. Training

  • Is there a Safety Awareness Talk Programme (DGP063) that is appropriate to the Framework and is it being adhered to ?

  • Are there copies of all Safety Awareness Talks (DGSS012) either in the Framework SHE File or held separately ?

  • Is there a separate Attendance Record (DGQMS0113) for each Safety Awareness Talk given and have they been signed by the participating operatives ?

  • Are there photocopies of all relevant specialist training certificates for operatives on the Framework (direct, agency and subcontractor), e.g. PASMA, IPAF etc. ?

  • Does the Framework have adequate fist aid cover ?

  • Are there First Aid certificates for all EFAW qualified personnel ?

Section 3. Accident and Incident Reporting

  • Is there a copy of the current Accident & Incident Reporting Policy (DGSS021) ?

  • Is there an Accident Record Form (DGSS044) and are accidents being correctly logged onto it ?

  • Is there an Accident Book / Pack applicable to the Framework ?

Section 4. Near Miss Reporting

  • Is there a copy the current Near Miss Reporting Policy (DGSS022) ?

  • Are Near Miss Incidents being recorded on the Reporting Form DGSS020 ?

Section 5. Plant and Equipment

  • Is there a Planned Maintenance / Inspection Schedule (DGSS028) ?

  • Are there any Portable Appliance Test Records (DGSS051 or equivalent) ?

  • If required, are there copies of Mobile Tower Inspection Records (DGSS030) and Mobile Access Tower Inspection Checklist / Report (DGSS026) ?

  • If required, are there copies of Podium Inspection Records (DGSS173 & DGSS084) ?

  • If required, are there copies of the Ladders, Stepladders & Hop-Ups Inspections ?

  • If required, are records of the statutory 6 monthly thorough examination available for MEWPS ?

  • If required, are there copies of the Weekly MEWPS Inspection Records (DGSS078) ?

  • If required, are all items of Lifting Equipment (and accessories) subject to the required statutory "Thorough Examination" with certification retained ?

  • If required, are records available to verify that Pressure Systems (air compressor / receivers) are subject to the required statutory "Thorough Examinations" or that a "Written Scheme of Examination" exists ?

  • If required, are records available to confirm that Local Exhaust Ventilation (LEV) systems are subject to the required statutory "Thorough Examination" at the required frequency ?

  • Is there a copy of the Hand Arm Vibration Safety Guide DGSS052 ?

  • If required, have Vibration and Noise Calculations been produced using the following:<br>HAV Daily Vibration Exposure Record DGSS076A and DGSS076B (instructions).<br>Hand Arm Vibration & Noise Assessment Tool (DGSS077) ?

  • If Harness & Lanyards are being used on the Framework, have the following been completed:<br>Harness & Lanyard Register of Users (DGSS086) ?<br>Harness & Lanyard Inspection Sheet (DGSS085) ?<br>(Note: a copy of the users Work at Height Certificates must be included in section 2)

Section 6. Safe Systems of Work

  • Have suitable and sufficient Risk Assessments been produced for all work activities ?

  • Have appropriate COSHH Assessments been conducted ?

  • Is there evidence that risk assessments have been reviewed as necessary ?

  • Are Material Safety Data Sheets available for hazardous substances used on the Framework ?

  • Are all Method Statements correctly identified on the Register, DGSS119 ?

  • Is there evidence that these Method Statements have been reviewed (Using document DGSS067 or similar) ?

  • Are copies of Method Statements available for inspection and are they suitable and relevant to the task ?

  • Have all personnel who are involved in the works relevant to a specific Method Statement acknowledged the safe system of work on either form DGSS123 or in Section 18 of the Method Statement (DGSS093) ?

  • Are Permits to Work correctly controlled and filed ?

Section 7. Temporary Works

  • Is there a copy of the current Temporary Works Procedure (DGSS034) held within the file ?

  • Where appropriate, is there a completed Temporary Works Appointments form relevant to the works (DGSS162) ?

  • Where appropriate, are Temporary Works Design Briefs completed (DGSS165) ?

  • Where appropriate, is there a Record of Design Brief Check/Approval of Temporary Works (DGSS166) ?

  • Are there relevant Competency Assessments (DGSS164) ?

  • Is there a Register of Temporary Works and does it appear to be up to date (DGSS163) ?

  • Are Temporary Works Trackers completed for all applicable works (DGSS167) ?

  • Are Permits to Load/Use/Unload/Strike/Dismantle being used and are they being used correctly (DGSS168) ?

Additional Items

  • Have actions arising from previous Documentation Audit been completed ?

Audit Observations

  • ADDITIONAL COMMENTS

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.