DGSS174 FRAMEWORK DOCUMENTATION AUDIT Rev 0 - 02/01/2018
STANDARD INFORMATION
-
BRANCH MANAGER
-
CONTRACT MANAGER
-
PROJECT / CONTRACT
-
SITE SUPERVISOR / FOREMAN
-
CLIENT
-
SITE ADDRESS
-
SECTOR OF WORKS
- Property Care
- Commercial
-
JOBNUMBER
-
Dodd Group Undertaking Principal Contractor Duties
-
Dodd Group Undertaking Contractor Duties
-
Direct employees
-
Agency/Sub-contractor staff employed by Dodd Group
CDM CONSTRUCTION PHASE PLAN
-
Is there an appropriate CPP and has it been reviewed and approved by the Contracts Manager & QHSE ?
-
Are details of any amendments correctly recorded ?
SECTION 1: DESCRIPTION OF PROJECT
1.1 Framework Description and Programme
-
Does the Plan correctly address the Framework Description & Programme ?
-
Does the Plan effectively address Framework location/address ?
-
Does the Plan identify hours of working ?
-
Does the Plan identify the timescales of the Framework ?
-
Does the Plan indicate if an HSE F10 notification is required ?
-
Is a copy of the relevant F10 available (if required) ?
1.2 Duty Holders
-
Does the Plan correctly identify the relevant Duty Holders ?
1.3 Existing Records and Plans
-
Does the Plan effectively address any existing records and plans ?
SECTION 2: MANAGEMENT OF THE WORK
2.1 Management Structure and Framework Management
-
Does the Plan correctly identify the Management and Framework Management Structure ?
2.2 Framework Health, Safety and Environmental Aims
-
Are the Aims of the Framework documented ?
2.3 Temporary Works
-
Are Temporary Works applicable to this site ?
2.4 Site Rules
-
Does the Plan effectively address Framework Rules including PPE requirements ?
2.5 Arrangements to Ensure Co-operation Between the Project Team
-
Does the Plan effectively address arrangements to ensure effective Liaison, Communication, Exchange of Information and Monitoring ?
2.6 Arrangements for Selecting and Involving Workers
-
Does the Plan effectively address Selection, Consultation and Training Requirements ?
2.7 Site Inductions
-
Does the Plan effectively address Framework Inductions ?
2.8 Welfare Facilities
-
Does the Plan effectively address welfare provisions ?
2.9 Accident / First Aid Arrangements
-
Does the Plan effectively address Accidents and First Aid arrangements ?
-
Does the Plan name Emergency First Aid Trained Personnel ?
2.10 Fire, Emergency and Security Arrangements
-
Does the Plan effectively address Fire, Emergency and Security Arrangements ?
-
Does the Plan provide details of the nearest Hospital with an A&E Department and details of how to get to it ?
SECTION 3: CONTROL OF SPECIFIC RISKS
-
Does the Plan effectively address Control Of Specific Framework Risks? Ensure that only those that are applicable to the Framework are included.
SECTION 4: SAFE SYSTEMS OF WORK
-
Does the Plan effectively address Safe Systems of Work ?
-
Does the Plan effectively address which Permit to Work are required on the Framework ?
FRAMEWORK SHE FILE
Policy Documents
-
Is there a copy of the current Health & Safety Policy DGSS001 displayed or held within the file ?
-
Is there a copy of the current Quality Policy DGQMS0002 displayed or held within the file ?
-
Is there a copy of the current Environmental Policy DGES0002 displayed or held within the file ?
Section 1. Framework Inductions
-
For Commercial Contracts, is there a Framework Induction Record (DGSS015) for each operative (direct, agency and subcontractor) and is it filled out correctly (including CSCS card details) ?
-
For Property Care, is there a Framework Induction Record (DGSS053) for each operative (direct, agency and subcontractor) and is it filled out correctly ?
Section 2. Training
-
Is there a Safety Awareness Talk Programme (DGP063) that is appropriate to the Framework and is it being adhered to ?
-
Are there copies of all Safety Awareness Talks (DGSS012) either in the Framework SHE File or held separately ?
-
Is there a separate Attendance Record (DGQMS0113) for each Safety Awareness Talk given and have they been signed by the participating operatives ?
-
Are there photocopies of all relevant specialist training certificates for operatives on the Framework (direct, agency and subcontractor), e.g. PASMA, IPAF etc. ?
-
Does the Framework have adequate fist aid cover ?
-
Are there First Aid certificates for all EFAW qualified personnel ?
Section 3. Accident and Incident Reporting
-
Is there a copy of the current Accident & Incident Reporting Policy (DGSS021) ?
-
Is there an Accident Record Form (DGSS044) and are accidents being correctly logged onto it ?
-
Is there an Accident Book / Pack applicable to the Framework ?
Section 4. Near Miss Reporting
-
Is there a copy the current Near Miss Reporting Policy (DGSS022) ?
-
Are Near Miss Incidents being recorded on the Reporting Form DGSS020 ?
Section 5. Plant and Equipment
-
Is there a Planned Maintenance / Inspection Schedule (DGSS028) ?
-
Are there any Portable Appliance Test Records (DGSS051 or equivalent) ?
-
If required, are there copies of Mobile Tower Inspection Records (DGSS030) and Mobile Access Tower Inspection Checklist / Report (DGSS026) ?
-
If required, are there copies of Podium Inspection Records (DGSS173 & DGSS084) ?
-
If required, are there copies of the Ladders, Stepladders & Hop-Ups Inspections ?
-
If required, are records of the statutory 6 monthly thorough examination available for MEWPS ?
-
If required, are there copies of the Weekly MEWPS Inspection Records (DGSS078) ?
-
If required, are all items of Lifting Equipment (and accessories) subject to the required statutory "Thorough Examination" with certification retained ?
-
If required, are records available to verify that Pressure Systems (air compressor / receivers) are subject to the required statutory "Thorough Examinations" or that a "Written Scheme of Examination" exists ?
-
If required, are records available to confirm that Local Exhaust Ventilation (LEV) systems are subject to the required statutory "Thorough Examination" at the required frequency ?
-
Is there a copy of the Hand Arm Vibration Safety Guide DGSS052 ?
-
If required, have Vibration and Noise Calculations been produced using the following:<br>HAV Daily Vibration Exposure Record DGSS076A and DGSS076B (instructions).<br>Hand Arm Vibration & Noise Assessment Tool (DGSS077) ?
-
If Harness & Lanyards are being used on the Framework, have the following been completed:<br>Harness & Lanyard Register of Users (DGSS086) ?<br>Harness & Lanyard Inspection Sheet (DGSS085) ?<br>(Note: a copy of the users Work at Height Certificates must be included in section 2)
Section 6. Safe Systems of Work
-
Have suitable and sufficient Risk Assessments been produced for all work activities ?
-
Have appropriate COSHH Assessments been conducted ?
-
Is there evidence that risk assessments have been reviewed as necessary ?
-
Are Material Safety Data Sheets available for hazardous substances used on the Framework ?
-
Are all Method Statements correctly identified on the Register, DGSS119 ?
-
Is there evidence that these Method Statements have been reviewed (Using document DGSS067 or similar) ?
-
Are copies of Method Statements available for inspection and are they suitable and relevant to the task ?
-
Have all personnel who are involved in the works relevant to a specific Method Statement acknowledged the safe system of work on either form DGSS123 or in Section 18 of the Method Statement (DGSS093) ?
-
Are Permits to Work correctly controlled and filed ?
Section 7. Temporary Works
-
Is there a copy of the current Temporary Works Procedure (DGSS034) held within the file ?
-
Where appropriate, is there a completed Temporary Works Appointments form relevant to the works (DGSS162) ?
-
Where appropriate, are Temporary Works Design Briefs completed (DGSS165) ?
-
Where appropriate, is there a Record of Design Brief Check/Approval of Temporary Works (DGSS166) ?
-
Are there relevant Competency Assessments (DGSS164) ?
-
Is there a Register of Temporary Works and does it appear to be up to date (DGSS163) ?
-
Are Temporary Works Trackers completed for all applicable works (DGSS167) ?
-
Are Permits to Load/Use/Unload/Strike/Dismantle being used and are they being used correctly (DGSS168) ?
Additional Items
-
Have actions arising from previous Documentation Audit been completed ?
Audit Observations
-
ADDITIONAL COMMENTS