  • DGSS040 INTERIM SITE SAFETY INSPECTION Rev 1 - 02/01/2018

STANDARD INFORMATION

  • BRANCH MANAGER

  • CONTRACT MANAGER

  • SITE MANAGER / SUPERVISOR

  • SITE ADDRESS

  • CLIENT

  • JOBNUMBER

  • Dodd Group Undertaking Principal Contractor Duties

  • Dodd Group Undertaking Contractor Duties

  • Direct employees

  • Agency/Sub-contractor staff employed by Dodd Group

  • Is there a separate Dodd Group site office or dedicated Dodd Group notice board

SITE INSPECTION

1. Welfare Facilities

  • Are toilet, urinal & washing facilities adequate for the number of persons on site ?

  • Is there an effective hot & cold running water supply ?

  • Is there a soap or hand wash dispensing station ?

  • Are there sufficient and adequate means for drying hands, face etc. i.e. towel or air dryer ?

  • Have adequate changing/drying areas been provided ?

  • Is there fresh drinking water available ?

  • Is there any means to boil water ?

  • Is there any means to heat a meal ?

  • Is the lighting & heating in the welfare area adequate ?

  • Are welfare areas kept clean & tidy ?

2. First Aid

  • Is there a first aid box suitable located ?

  • Is the First Aid Box adequately stocked and the contents in date ?

3. Plant & Equipment

  • Are all power tools 110 volt or below ?

  • Are all power tools in good condition and any safety devices operating correctly ?

  • Are cables, transformers & splitter boxes in good condition ?

  • Are machine / tool safety guards in good condition ?

  • Is it clear that the right plant & equipment is being used for the job ?

  • Is access equipment in good condition e.g. podiums, mobile towers, stepladders and ladders ?

  • Are all portable ladders classified to EN131 ?

  • Do all Podiums comply with either PAS 250 or BS 8620 ?

  • If applicable, are Podium Packs utilised correctly ?

  • Are operatives trained & competent to operate MEWPS, abrasive wheels etc. ?

  • Are visual & audible warning devices fitted and working on site plant ?

  • Are MEWPS switched off and keys removed from ignition when left unattended ?

  • When MEWPS are being operated in an area occupied with other workers or vehicles, is this area adequately barricaded and sufficient warning signs in displayed ?

  • Are battery operated MEWPS charged in a well ventilated area ?

4. Personal Protective Equipment

  • Are all operatives wearing mandatory PPE ?

  • Are other items of PPE being used when required ?

  • Are all items of PPE in good condition ?

  • Are operatives wearing suitable clothing ?

5. Fire & Emergency

  • Is there a means of raising the alarm, and does it work ?

  • Are there adequate escape routes and are they kept clear ?

  • Are there adequate fire exit signs ?

  • Are adequately suitable fire extinguishers provided and are they accessible ?

  • Are suitable fire extinguishers accessible within the vicinity of Hot Works ?

  • Has annual servicing of extinguishers been maintained ?

  • Are fire extinguishers fully charged ?

  • Is the area clear of combustible materials where hot works are being conducted ?

  • Is the area clear of flammable substances where hot works are being conducted ?

  • Are flammable liquids and gases stored correctly ? e.g. LPG & Acetylene

6. Housekeeping & Environmental

  • Is the site kept tidy ?

  • is the site free from trip hazards ?

  • Are materials stored safely ?

  • Is the site adequately lit in all areas ?

  • Have precautions been taken to prevent nuisance from dust ?

  • Is the area underneath and around cement silo's kept clean & tidy ?

  • Is there a bunded area around fuel bowsers ?

  • If required, is there a spill kit available and is it accessible and adequate ?

  • Have precautions been taken to prevent contamination of ground & water sources ?

  • Is waste segregated and disposed of in appropriate skips ?

7. Static & Mobile Tower Scaffolds

  • Are static scaffolds erected, altered & dismantled by competent persons ?

  • Are all uprights provided with base plates & where necessary timber sole plates ?

  • Are all uprights, ledgers, braces & struts in position and in good condition ?

  • Is the scaffold tied to the building or structure to prevent collapse ?

  • Are upper & mid guard rails fitted at every edge to prevent falls ?

  • Are adequate toe boards fitted at every edge ?

  • Are additional brick guards provided to prevent materials falling from scaffold ?

  • Is there safe access to the scaffold platform ? i.e. Scaffold staircase system or a tied ladder extending 1m or 5 rungs above landing point

  • Are work platforms fully boarded & are boards arranged to avoid tipping or tripping ?

  • Are scaffold platforms free from debris & materials ?

  • Are there effective barriers or warning notices in place to stop operatives using an incomplete scaffold ?

  • Is the Maximum Safe Working Load (SWL) displayed on scaffold loading bays ?

  • Are loading bays fitted with swing gates or other edge protection to prevent falls ?

  • Does a competent person inspect the scaffold at regular intervals ?

  • Are mobile tower scaffolds erected, altered and dismantled by competent persons ?

  • Do mobile tower scaffolds have scafftags or similar means to identify inspection ?

  • Are these inspections being carried out by a PASMA qualified person ?

  • Have mobile tower scaffolds been correctly erected ?

  • Are incomplete mobile tower scaffolds suitably identified to prevent use ?

8. Site Security & Public/Site Operative Safety

  • Is the site securely fenced from the public with hoarding or other suitable barriers ?

  • Are site safety notices prominently displayed ?

  • Is the site adequately protected from trespass ?

  • Is there a site speed limit? Is it enforced & being adhered to ?

  • Are pedestrian & vehicle routes segregated as far as reasonably practicable ?

  • Are holes barricaded and marked to prevent falls ?

  • Has robust fall protection been provided across dry riser openings ?

  • Has robust fall protection been provided across lift shaft openings ?

  • Are there adequate barriers or edge protection to stop operatives or materials falling from roofs ?

  • Are operatives & members of the public protected from falling material ?

  • Have hearing protection zones been marked ?

  • Are energised circuits, panels and other conductors properly guarded or secured ?

  • Are temporary 415 volt sub-main enclosures securely locked ?

  • Have operatives been informed of any potential Asbestos Hazards ?

9. Excavations

  • To reduce the risk of collapse, have adequate precautions been taken to ensure that excavations are made safe by the use of trench supports or sloped/battered back to a safe angle ?<br>(Depending on the soil properties, be aware that there is No Safe Minimum Depth of excavation).

  • Is there a safe means of access & egress into and out of the excavation, e.g. sufficiently long, secured ladder ?

  • Are there barriers or other methods of protection to stop people & vehicles falling in ?

  • Is the excavation safe in relationship to the stability of neighbouring structures or services ?

  • Are materials, spoil and plant stored away from the edge of the excavation to reduce the risk of collapse ?

  • Is the excavation regularly inspected by a competent person ?

10. Safe Method of Working

  • Are Temporary Works carried out in a safe and proper manner ?

  • Are the wheels of mobile tower scaffolds & podiums locked when in use ?

  • Are the platforms of mobile tower scaffolds & podiums empty when they are moved ?

  • Are operatives accessing and egressing mobile tower scaffolds correctly ?

  • Are operatives closing the gate when working on podiums ?

  • Are MEWPS being operated safely ?

  • Has a suitable Permit to Work system been implemented ?

  • Is there a safety barrier around portable pipe threading machines ?

  • Have welding screens been erected where arc welding is being conducted ?

  • Are warning notices displayed when welding works are in process ?

  • Are operatives following Method Statements ?

Audit Observations

  • ADDITIONAL COMMENTS

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.