Title Page
-
Serial Number
-
Take photo of header serial number
-
Model
-
Build date
-
Build conducted by
-
Inspection completed by
Machine build checklist
-
Export end mounted and aligned
-
Export end bolts torqued
-
Fit knife guards where export end is joined at cutterbar including skid plates
-
Hydraulic hoses joined and torqued
-
Reel assembled correctly
-
Reel assembly bolts torqued
-
Mount reel into main header
-
Reel mounting bolts torqued
-
hang and secure draper deck
-
Install draper mat and join (ensure bolt orientation is correct, heads facing feed drum)
-
Install back sheet
-
Fit RH knife (back off hold downs to make this slide in easy, use gloves as this is extremely sharp)
-
Install pin securing knife head to pitman arm (ensure grease nipple is facing outwards)
-
Reseal hardware bags and mount to machine
-
Ensure all kits and bag are back on the machine
-
Ensure books are with the machine
-
Are ALL skid plates fitted
-
is the centre reel cover fitted
Machine post build damage inspection
-
Are all kits with header
-
Check the unit has no obvious damage (excluding fair wear and tear) and is in good order.
-
LH end shield
-
RH end shield
-
Main frame
-
Draper belts
-
Reel tube and bracing
-
Reel fingers and finger tubes
-
Hydraulic tank
-
Decals - safety and maintenance
Inspection Photos
-
LH end shield
-
Underside
-
RH end shield
-
RH reel
-
RH draper mat
-
RH back sheet
-
Centre reel
-
LH reel
-
LH draper mat
-
LH backsheet
-
Hydraulic tank - sight glass and fill point
-
Kits secured to machine for transport