Information
-
DSIP Inspection: Overhead Installation Quality Control Form
-
Conducted on
-
Prepared by
Project Description
-
Project Description:
-
SAP Order Number:
-
Date of Review:
-
Crew Foreman:
-
Company:
-
Is construction in progress?
-
List the poles that were "physically inspected":
Design
-
Installed per Design?
-
Field modifications approved by design engineer?
Work Site
-
Installation within ROW boundaries?
-
Restoration (landscaping, grade, r/w, etc.) acceptable?
-
Scrap, salvage, spent poles addressed?
Pole Installation
-
Size and class per staking sheet?
-
Fill properly tamped?
-
Grounds installed per staking sheet?
-
Guy type installed per staking sheet?
-
Dead ends and angles with rake?
-
Correct clearance and insulator placement?
-
Poles set at proper depth?
-
Ground molding installed? (Pole / TX)
-
Anchor distance per staking sheet?
-
Guy guards installed?
-
Tagging transferred to new pole?
Framing
-
Tangents per staking sheet and standards?
-
Dead ends per staking sheet and standards?
-
Raptor and animal protection per staking sheet?
-
Neutral offset brackets per staking sheet?
-
Angles per staking sheet and standards?
-
Taps per staking sheet and standards?
-
Climbing space maintained?
Field Equipment
-
Do you want to add a field equipment review?
Field Equipment Review
-
Correct Transformer KVA per staking sheet?
-
Lightning arrestor location per standards?
-
Required ground molding installed?
-
Specified fusing and tagging installed?
-
Animal guards installed per standards?
-
Grounds installed per staking sheet?
-
Transformer bolt end insulator installed?
-
Specified phase(s) tapped?
-
Other equipment (air brakes, reclosures, cap banks, etc.) installed per design and standards?
Primary Conductor
-
Do you want to add a primary conductor review?
Primary Conductor Review
-
Location of review (reference pole ID or #):
-
Is the structure being reviewed a dead-end structure?
-
Span lengths as per design?
-
What were the measured span lengths?
-
Joint use clearance as per standards?
-
What was the measured clearance?
-
What was the clearance measured between?
-
Conductor height ground clearance as per standards?
-
What were the measured clearances to the neutral conductor of both spans?
-
What were the measured clearances to the primary conductor of both spans?
-
Conductor height above ground at pole attachment as per design?
-
What was the measured clearance to the neutral conductor?
-
What was the measured clearance to the primary conductor?
-
Correct Sag height per design?
-
Vertical clearance to object as per NESC?
-
What was the measured clearance from the neutral conductor to the object?
-
What was the measured clearance from the primary conductor to the object?
-
Horizontal clearances as per NESC?
-
What was the measured clearance?
-
What was the clearance measured to?
-
Span length as per design?
-
What was the measured span length?
-
Joint use clearance as per standards?
-
What was the measured clearance?
-
What was the clearance measured between?
-
Conductor height ground clearance as per standards?
-
What was the measured clearance to the neutral conductor?
-
What was the measured clearance to the primary conductor?
-
Conductor height above ground at pole attachment as per design?
-
What was the measured clearance to the neutral conductor?
-
What was the measured clearance to the primary conductor?
-
Correct Sag height per design?
-
Vertical clearance to object as per NESC?
-
What was the measured clearance from the neutral conductor to the object?
-
What was the measured clearance from the primary conductor to the object?
-
Horizontal clearances as per NESC?
-
What was the measured clearance?
-
What was the clearance measured to?
Secondary Conductor
-
Do you want to add a secondary conductor review?
Secondary Conductor Review
-
Location of review (reference pole ID or #):
-
Is the structure being reviewed a dead-end structure?
-
Span lengths as per design?
-
What were the measured span lengths?
-
Joint use clearance as per standards?
-
What was the measured clearance?
-
What was the clearance measured between?
-
Conductor height ground clearance as per standards?
-
What were the measured clearances to the conductor of both spans?
-
Conductor height above ground at pole attachment as per design?
-
What was the measured clearance to the conductor?
-
Correct Sag height per design?
-
Vertical clearance to object as per NESC?
-
What was the measured clearance from the conductor to the object?
-
Horizontal clearances as per NESC?
-
What was the measured clearance?
-
What was the clearance measured to?
-
Span length as per design?
-
What was the measured span length?
-
Joint use clearance as per standards?
-
What was the measured clearance?
-
What was the clearance measured between?
-
Conductor height ground clearance as per standards?
-
What was the measured clearance to the conductor?
-
Conductor height above ground at pole attachment as per design?
-
What was the measured clearance to the conductor?
-
Correct Sag height per design?
-
Vertical clearance to object as per NESC?
-
What was the measured clearance from the conductor to the object?
-
Horizontal clearances as per NESC?
-
What was the measured clearance?
-
What was the clearance measured to?
Special Crossings
-
If applicable, verify all standards and/or requirements are met (road/rail/transmission):
-
Reviewed By