Information
-
Overhead Installation Quality Control Review Sheet (Form 3816)
*Reviews are to be completed on all primary projects (service only projects are excluded) -
Document No.
-
Conducted on
-
Prepared by
Project Description
-
Project Description:
-
SAP Order Number:
-
Date of Review:
-
Crew Foreman:
-
Company:
Design
-
Installed per Design?
-
Field modifications approved by design engineer?
Work Site
-
Installation within ROW boundaries?
-
Restoration (landscaping, grade, r/w, etc.) acceptable?
-
Scrap, salvage, spent poles addressed?
Pole Installation (Minimum - 10% of poles must be reviewed)
-
Size and class per staking sheet?
-
Fill properly tamped?
-
Grounds installed per staking sheet?
-
Guy type installed per staking sheet?
-
Poles set at proper depth?
-
Ground molding installed?
-
Anchor distance per staking sheet?
-
Guy guards installed?
-
Tagging transferred to new pole?
Framing
-
Transmission framing per staking sheet and standards?
-
Distribution framing per staking sheet and standards?
-
Raptor and animal protection per staking sheet?
-
Climbing space maintained?
Field Equipment
-
Airbreak Switch per staking sheet?
-
Grounding grate per staking sheet?
-
Distribution equipment installed per design and standards?
Conductor
-
Do you want to add a conductor review?
Conductor Review
-
Location of review (reference pole ID or #):
-
Span length as per design?
-
Conductor height ground clearance as per design?
-
Conductor height above ground at pole attachment as per design?
-
Correct Sag per design?
-
Vertical clearances as per NESC?
-
Horizontal clearances as per NESC?
-
Distribution clearance as per standards?
-
Joint use clearance as per standards?
Special Crossings
-
If applicable, verify all standards and/or requirements are met (road/rail/transmission):
-
Reviewed By