Gas Main Installation Quality Control Review Sheet (Form 3815)
*Reviews are to be completed on all main projects (service only projects are excluded) -
Document No.
-
Conducted on
-
Prepared by
Project Description
-
Project Description:
-
SAP Order Number:
-
Date of Review:
-
Crew Foreman:
-
Company:
Design
-
Installed per Design?
-
Field modifications approved by design engineer?
Work Site
-
Restoration (landscaping, grade, etc.) acceptable?
-
Installation within ROW boundaries?
-
ROW left in reasonable manner?
Installation Per Standards
Materials Used as Specified:
-
Pipe/Fittings (52-A, 53-A, 53-B)
-
Line Markers, Locate Stations (55-F)
-
Key Valves (61-B to 61-E)
-
Test Stations (55-F)
Joining Method(s):
-
Procedure(s) Used per Construction Standards:
-
Welding (53-P)
-
Fusion (52-P)
-
Mechanical (52-P)
Tapping/Stopping (53-K, 3130):
-
Verify coupons were retrieved and Internal Inspection Form completed (Form 3170)
Tracer Wire (52L):
-
Taps Solder to Main Wire
-
Western Union Splice
-
DBY Splice Kits
-
Burial depths and separation met per Construction Standards (55-B):
-
Riser and meter set installed per Construction Standards (59-A):
Backfilling
-
Backfill Used (55-E):
-
Adequate Compaction (55-E):
Special Crossings
-
If applicable, verify all standards and/or requirements are met (road/rail/transmission):
-
Reviewed By