Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Works information
-
Site Address
-
Date Of Visit
-
Supervisor For Site Works<br>
-
Works notification type?
- Notifiable
- Non-Notifiable
-
Works area?
- Enclosure
- Zone
-
Asbestos type?
- Chrysotile
- Amosite
- Crocidolite
-
Stage of works
- Site set up
- Enclosure construction
- Removal / Encapsulation
- Final clean
- Air test / Site clear
-
Photo - Stage of works
Site security
-
Are perimeter fence lines secure?
-
Photos of perimeter fence line
Site Welfare
-
Are welfare facilities set up and working on site?
-
Are facilities correct for amount of personnel on site?
-
Are the facilities kept clean and hygienic?
-
Photos of welfare set up (inside & outside)
Site Documentation
-
Asbestos License / ASB5 / /NNLW1 /POW on site?
-
Are isolation certificates on site?<br>
-
Has toolbox talk been given on isolations<br>
-
COSHH assessments on site<br>
-
Site log completed<br>
-
Plan of work signed by operatives<br>
-
Risk assessments on site<br>
-
Emergency procedures on site<br>
-
Consignment notes on site<br>
-
A copy of the standard procedures<br>
-
Has the site diary been completed?<br>
-
A copy of insurance on site
-
Daily Exposure been completed
-
Daily RPE been completed
-
Daily enclosure inspection been completed
-
Daily plant check been completed
-
Has a smoke test been completed
-
Medicals / face fits / Training for all Operatives on site<br>
Site Set Up - Plan Of Works
-
Has there been liaison with the client<br>
-
Is the site layout as per plan of work?<br>
-
Is the enclosure as per plan of work?<br>
-
Is the DCU as per plan of work?<br>
-
Is the Skip / Waste Van as per plan of work?<br>
-
Is the waste route as per plan of work?
-
Is the transit route as per plan of work?
-
Is the bagging station as per plan of work?
-
Are the air locks as per plan of works
-
Is the method of removal as per plan of works
-
Is the vision panel / CCTV as per plan of works
- Yes
- No
- Not Applicable
-
Have any amendments been recorded?<br>
-
If yes, What are the amendments?
-
Tool Box talks carried out
- Site Set up
- DCU Set up
- Enclosure Construction
- Stripping Technique
- Waste Disposal
- Accident Reporting
- Fire Point
- Emergency Procedure
- PPE
- Risk Assessments
- Site Log
- Exposure
- Plan Of Works
-
Fire point identified<br>
-
Is the fibre suppression as per PoW?<br>
-
Is there wetting agent on site<br>
-
Is the enclosure preventing the spread of asbestos?<br>
-
Is the site supervisor on site at all times?<br>
-
Is there a first aid kit on site?<br>
-
Is there a fire extinguisher on site?<br>
Plant and Equipment
-
Number of NPU as per Plan of works
-
Certificates available for each NPU<br>
-
NPU in good condition<br>
-
Are leads secure preventing trips<br>
-
Are there at least 2 off H Type vacuums on site<br>
-
Are the certificates available for Vacuums<br>
-
Is the RPE as per plan of works<br>
-
Is the RPE in a clean condition<br>
Waste
-
Is the waste being stored in the Enclosure<br>
-
If yes, Why is it being stored within enclosure?
-
Is the waste in the correct packaging?<br>
-
Is the waste being bagged as soon as it is removed <br>
-
Are waste bags being over loaded<br>
-
Is the transit route free of debris<br>
-
Is the waste route clearly marked<br>
-
Are the operatives wearing the correct RPE and PPE when removing waste<br>
-
Are correct handling techniques being used<br>
-
Is the waste being stored in a lockable container<br>
DCU Checks
-
Is the DCU level?
-
Are the internal and dirty end external doors self closing?
-
Is there a direct water feed to DCU?
-
Is the electric to mains with RCD secure?
-
Is the earthing rod in place?
-
Is the Pilot Light on boiler lit?
-
Are the Clean and Dirty ends marked?<br>
-
Is the Waste water going to foul water drain?
-
Are the Steps in position for access?
-
is there a copy of the DCU clearance certificate from its last site
-
Boiler Test available?
-
Electrical Test available?
-
Stock Towels available?
-
Stock Overalls available?
-
Shampoo / Shower Gel available?
-
Nail Brushes available?
Enclosure
-
Is there an enclosure?
-
Is there a separate baglock as per Plan Of Works?
-
Has the bagging station got the correct signs?
-
Is the bagging station clean?
-
Air lock Condition? (Poor 1 - 5 Perfect)
-
Picture of Airlocks
-
Number of buckets within Airlocks
-
Are Airlocks clean?
-
Have the Airlocks got signs on?
-
Is the removal method as per plan of works?
-
Type of suppression being used?
-
Do the Baglocks / Airlocks have vision panels on them?
-
Are the flaps the correct size and correctly weighted?
-
Have any amendments been recorded?
-
If Yes, Please state what has been amended.
-
Has the enclosure got vision panels?
-
Transit shoes in the airlocks?
-
Overall standard of the enclosure? (Poor 1-5 Perfect)
-
Are there sufficient signs around the enclosure?
-
Wellington boots being used within the enclosure?
-
Hoods on overalls up?
-
CCTV in operation and viewing the removal? (If required within the POW)
-
DCU direct connection?
Work At Height
-
Has the work at height risk been assessed?
-
Is the work at height risk assessment on site?
-
Is the scaffold tower correctly erected?
-
Toe boards / Guardrails correctly installed?
-
Ladders correctly installed?
-
Competent inspection / Scaff-Tagged?
-
Picture of scaffolding
-
Podiums / Towers erected by PASMA trained operatives?
-
Podiums / Towers correctly erected?
-
Picture of podiums / towers
-
Are ladders being used?
-
If yes, State circumstances for use of ladder?
Storage
-
Is the plant stored in clean condition?
-
Is the plant being looked after on site?
-
Are vacuum hoses being stored correctly in bags?
-
Rate the plant storage (Poor 1-5 Perfect)
-
Are materials being stored on site correctly / Tidily?
-
Is there any visible waste around works area?
Employee's
-
Are masks clean and in tidy condition?
-
Are tools in good condition?
-
Do all operatives have transit shoes?
-
Do all operatives have wellingtons?
-
Are all operatives clean shaven?
-
Is correct PPE and RPE being used?
General Site
-
Have all fire precaution been assessed?
-
Comments -
-
Is the general housekeeping good on site?
-
Comments -
-
Are services clearly located on site?
-
Comments -
-
Are emergency plans in place on site?
-
Comments -
-
Are all traffic routes segregated away from works?
-
Comments -
-
Is there any works interfering with our works?
-
Comments -
Personnel Check
Supervisor
-
Mask condition is good
-
PPE is correct
-
Have daily checks been carried out
-
Medical Available on site
-
FaceFit available on site
-
Full Face mask on site
-
Wellingtons on site
-
Transit shoes on site
Operative 1 Check List
-
Mask condition is good
-
PPE is correct
-
Have daily checks been carried out
-
Medical Available on site
-
FaceFit available on site
-
1/2 Mask on site
-
Full Face mask on site
-
Wellingtons on site
-
Transit shoes on site
Operative 2 Check List
-
Mask condition is good
-
PPE is correct
-
Have daily checks been carried out
-
Medical Available on site
-
FaceFit available on site
-
1/2 Mask on site
-
Full Face mask on site
-
Wellingtons on site
-
Transit shoes on site
Vehicle Information
-
Vehicle cleanliness Bodywork<br>
-
Vehicle cleanliness Cab<br>
-
Vehicle cleanliness Inside the back<br>
-
Picture of vehicle
-
First aid kit in van?
-
Fire Extinguisher in van front?
-
Signature of Supervisor
-
Signature of Assessor
-
Select date