Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 - Previous Inspection
-
1.1 - Has the last inspection been reviewed?
-
1.2 - Are there any outstanding actions?
2.0 - Training & Compentency
-
2.1 - Has all the current scaffold crew read and signed the current risk assessment
3.0 - Information, Instruction
-
3. 1 - What was the last toolbox talk
-
3. 2 - When was the last subject the talk was given
-
3.3 - Is the risk and method statement relevant to the current scaffold task?
4.0 - Material storage and housekeeping
-
4.1 - Was there evidance of good stacking and storage practices observed
-
4.2 - Access ways kept clear
5.0 - Vehicle Movement controls
-
5.1 - Traffic routes sufficient for safe and easy movement
-
5.2 - Vehicles and pedestrians segregated
-
5.3 - Designated loading areas clearly marked out
-
5.4 - Pedestrian routes clearly marked out
6.0 - Work At Height
-
6.1 - Is the scaffolding task being carried out in accordance NASC SG4:10 with the use of the advanced guardrail system
-
6.2 - Is there evidence of adopted of tunnelling technique for raising the boards from below
-
6.3 - Vehicle base fall protection installed around the lorry bed
-
6.4 - Rescue plan in place and relevant to the scope of works
7.0 - Fall Protection Equipment
-
7.1 - Is there evidance of three-montly inspection and recording of fall arrest equipment up to date.
8.0 - Welfare
-
8.1 - Mess facilities are clean and tidy with sufficient seating
-
8.2 - Toilet facilities are clean and tidy
-
8.3 - Toilet facilities with soap, hand towels, hot and cold water
-
8.4 - Facilities to dry wet clothing
-
8.5 - Secure facilities for own clothing and work wear
-
8.6 - Kettle and means of heating food
9.0 - Workmanship/Structural Integrity
-
9.1 - Is the scaffold erected in accordance with NASC TG20:08 (basic scaffolds) or design
-
9.2 - Are there sufficient number of ties, using correct fittings, and across two standards
-
9.3 - Are the ladders secured at both stiles, correct angle and in good order
-
9.4 - Are all the platform fully boarded with guardrails correctly fixed
-
9.5 - Are trapdoors/gates or barriers at key ladder access points
10.0 - Signage
-
10. 1 - Standard safety signage posted at the key locations (incomplete & do not use)
-
10. 2 - Is the scaff tag signed and displaying the relevant date
11.0 - Material control
-
11. 1 - Company procedures for checking, maintaining plant & equipment being implemented
-
11.2 - Safe stacking practices observed
-
11.3 - Safe storage of materials observed.
12.0 - Personal Protective Equipment - Sufficient and Correct applied
-
12.1 - Hard hat
-
12. 2 - Gloves (various types for site conditions)
-
13. 3 - Ear protection
-
13. 4 - Eye protection
-
13. 5 - High Visibility vest or garment
-
13.6 - Harness & Lanyard correctly applied and adjusted
14.0 - Lifting operations
-
14.1 - Gin wheel correctly position, no greater than 750mm
-
14.2 - Is the area below the lifting point cordoned off
-
14.3 - Has the users have knowledge of knots
-
14.4 - Is the rope and wheel free from defects and suitable
Sign Off
-
On site representative
-
Auditor's signature