Title Page

  • Site

  • Conducted on

  • Prepared by

  • Location
  • What Store Type Is The Install

Pre-Installation

  • Time Eyelevel informed of teams arrival at store

  • Has the store visitors book been filled out and the Store Manager/Assistant Manager been contacted?

  • Has a parking disclaimer been completed.

  • Are all 4 demonstration products listed on install manual available at the store?

  • Take photograph of existing fixture prior to installation clearly showing all items in theatre brackets.

Post-Installation

  • Have all redundant products including the existing theatre products been returned to the store?

  • Have white cover caps been fitted to all existing theatre bracket holes

  • Has the new theatre bracket been installed using the supplied template including self tapping fixing?

  • Has the new theatre product been installed as per installation guide

  • Take photograph of the above

  • Have both retaining bolts been fitted to the theatre product as per installation guide?

  • Take photograph of the above

  • Has the security wire been fitted as per the installation guide?

  • Take photograph of the above

  • Have new product chargers been fitted?

  • Have new foamex panels been installed as per installation guide?

  • Take photograph of the above

  • Have all cradles, lift arrows and demo products been fitted as per installation instructions

  • Take photograph of the above

  • Have all lenses and tickets been fitted level with lift arrows on V10 products and level with cradles on non V10 products as per installation guide

  • Take photograph of the above showing charging lights as per installation instructions

  • Have new base panels been fitted as per installation guide

  • Take photograph of the above

  • Take photographs of each corner of the SIS unit as per installation guide

Pre-Installation

  • Time Eyelevel informed of teams arrival at store

  • Has the store visitors book been filled out and the Store Manager/Assistant Manager been contacted?

  • Has a parking disclaimer been completed

  • Are all 4 demonstration products listed on install manual available at the store?

  • Take photograph of existing fixture prior to installation clearly showing all items in theatre brackets.

Post-Installation

  • Have all redundant products including the existing theatre products been returned to the store?

  • Have white cover caps been fitted to all existing theatre bracket holes

  • Has the new theatre bracket been installed using the supplied template including self tapping fixing?

  • Has the new theatre product been installed as per installation guide

  • Take photograph of the above

  • Have both retaining bolts been fitted to the theatre product as per installation guide?

  • Take photograph of the above

  • Has the security wire been fitted as per the installation guide?

  • Take photograph of the above

  • Have new product chargers been fitted?

  • Have new foamex panels been installed as per installation guide?

  • Take photograph of the above

  • Have all cradles, lift arrows and demo products been fitted as per installation instructions

  • Take photograph of the above

  • Have all lenses and tickets been fitted level with lift arrows on V10 products and level with cradles on non V10 products as per installation guide

  • Take photograph of the above showing charging lights as per installation instructions

  • Has new light box graphic been installed as per installation guide

  • Take photograph of the above

  • Take photographs of each corner of the SIS unit as per installation guide

Pre-Installation

  • Time Eyelevel informed of teams arrival at store

  • Has the store visitors book been filled out and the Store Manager/Assistant Manager been contacted?

  • Has a parking disclaimer been completed

  • Are all 4 demonstration products listed on install manual available at the store?

  • Take photograph of existing fixture prior to installation clearly showing all items in theatre brackets.

Post-Installation

  • Have all redundant products including the existing theatre products been returned to the store?

  • Have white cover caps been fitted to all existing theatre bracket holes

  • Has the new theatre bracket been installed using the supplied template including self tapping fixing?

  • Has the new theatre product been installed as per installation guide

  • Take photograph of the above

  • Have both retaining bolts been fitted to the theatre product as per installation guide?

  • Take photograph of the above

  • Has the security wire been fitted as per the installation guide?

  • Take photograph of the above

  • Have new product chargers been fitted?

  • Have new foamex panels been installed as per installation guide?

  • Take photograph of the above

  • Have all cradles, lift arrows and demo products been fitted as per installation instructions

  • Take photograph of the above

  • Have all lenses and tickets been fitted level with lift arrows on V10 products and level with cradles on non V10 products as per installation guide

  • Take photograph of the above showing charging lights as per installation instructions

  • Has new light box graphic been installed as per installation guide

  • Take photograph of the above

  • Take photographs of each corner of the SIS unit as per installation guide

Pre-Installation

  • Time Eyelevel informed of teams arrival at store

  • Has the store visitors book been filled out and the Store Manager/Assistant Manager been contacted?

  • Has a parking disclaimer been completed

  • Are all 4 demonstration products listed on install manual available at the store?

  • Take photograph of existing fixture prior to installation clearly showing all items in theatre brackets.

Post-Installation

  • Have all redundant products including the existing theatre products been returned to the store?

  • Have white cover caps been fitted to all existing theatre bracket holes

  • Has the new theatre bracket been installed using the supplied template including self tapping fixing?

  • Has the new theatre product been installed as per installation guide

  • Take photograph of the above

  • Have both retaining bolts been fitted to the theatre product as per installation guide?

  • Take photograph of the above

  • Has the security wire been fitted as per the installation guide?

  • Take photograph of the above

  • Have new product chargers been fitted?

  • Have new foamex panels been installed as per installation guide?

  • Take photograph of the above

  • Have all cradles, lift arrows and demo products been fitted as per installation instructions

  • Take photograph of the above

  • Have all lenses and tickets been fitted level with lift arrows on V10 products and level with cradles on non V10 products as per installation guide

  • Take photograph of the above showing charging lights as per installation instructions

  • Has new light box graphic been installed as per installation guide

  • Take photograph of the above

  • Take photographs of each corner of the SIS unit as per installation guide

Pre-Installation

  • Time Eyelevel informed of teams arrival at store

  • Has the store visitors book been filled out and the Store Manager/Assistant Manager been contacted?

  • Has a parking disclaimer been completed

  • Are all 4 demonstration products listed on install manual available at the store?

  • Take photograph of existing fixture prior to installation clearly showing all items in theatre brackets.

Post-Installation

  • Have all redundant products including the existing theatre products been returned to the store?

  • Have white cover caps been fitted to all existing theatre bracket holes

  • Has the new theatre bracket been installed using the supplied template including self tapping fixing?

  • Has the new theatre product been installed as per installation guide

  • Take photograph of the above

  • Have both retaining bolts been fitted to the theatre product as per installation guide?

  • Take photograph of the above

  • Has the security wire been fitted as per the installation guide?

  • Take photograph of the above

  • Have new product chargers been fitted?

  • Have new foamex panels been installed as per installation guide?

  • Take photograph of the above

  • Have all cradles, lift arrows and demo products been fitted as per installation instructions

  • Take photograph of the above

  • Have all lenses and tickets been fitted level with lift arrows on V10 products and level with cradles on non V10 products as per installation guide

  • Take photograph of the above showing charging lights as per installation instructions

  • Has new light box graphic been installed as per installation guide

  • Take photograph of the above

  • Take photographs of each corner of the SIS unit as per installation guide

Pre-Installation

  • Time Eyelevel informed of teams arrival at store

  • Has the store visitors book been filled out and the Store Manager/Assistant Manager been contacted?

  • Has a parking disclaimer been completed

  • Are all 4 demonstration products listed on install manual available at the store?

  • Take photograph of existing fixture prior to installation clearly showing all items in theatre brackets.

Post-Installation

  • Have all redundant products including the existing theatre products been returned to the store?

  • Have white cover caps been fitted to all existing theatre bracket holes

  • Has the new theatre bracket been installed using the supplied template including self tapping fixing?

  • Has the new theatre product been installed as per installation guide

  • Take photograph of the above

  • Have both retaining bolts been fitted to the theatre product as per installation guide?

  • Take photograph of the above

  • Has the security wire been fitted as per the installation guide?

  • Take photograph of the above

  • Have new product chargers been fitted?

  • Have new foamex panels been installed as per installation guide?

  • Take photograph of the above

  • Have all cradles, lift arrows and demo products been fitted as per installation instructions

  • Take photograph of the above

  • Have all lenses and tickets been fitted level with lift arrows on V10 products and level with cradles on non V10 products as per installation guide

  • Take photograph of the above showing charging lights as per installation instructions

  • Have new base panels been fitted as per installation guide

  • Take photograph of the above

  • Has new light box graphic been installed as per installation guide

  • Take photograph of the above

  • Take photographs of each corner of the SIS unit as per installation guide

Pre-Installation

  • Time Eyelevel informed of teams arrival at store

  • Has the store visitors book been filled out and the Store Manager/Assistant Manager been contacted?

  • Has a parking disclaimer been completed

  • Are all 4 demonstration products listed on install manual available at the store?

  • Take photograph of existing fixture prior to installation clearly showing all items in theatre brackets.

Post-Installation

  • Have all redundant products including the existing theatre products been returned to the store?

  • Have white cover caps been fitted to all existing theatre bracket holes

  • Has the new theatre bracket been installed using the supplied template including self tapping fixing?

  • Has the new theatre product been installed as per installation guide

  • Take photograph of the above

  • Have both retaining bolts been fitted to the theatre product as per installation guide?

  • Take photograph of the above

  • Has the security wire been fitted as per the installation guide?

  • Take photograph of the above

  • Have new product chargers been fitted?

  • Have new foamex panels been installed as per installation guide?

  • Take photograph of the above

  • Have all cradles, lift arrows and demo products been fitted as per installation instructions

  • Take photograph of the above

  • Have all lenses and tickets been fitted level with lift arrows on V10 products and level with cradles on non V10 products as per installation guide

  • Take photograph of the above showing charging lights as per installation instructions

  • Have all 3 new light box graphics been installed as per installation guide

  • Take photographs of the above

  • Take photographs of each corner of the SIS unit as per installation guide

Pre-Installation

  • Time Eyelevel informed of teams arrival at store

  • Has the store visitors book been filled out and the Store Manager/Assistant Manager been contacted?

  • Has a parking disclaimer been completed

  • Are all 4 demonstration products listed on install manual available at the store?

  • Take photograph of existing fixture prior to installation clearly showing all items in theatre brackets.

Post-Installation

  • Have all redundant products including the existing theatre products been returned to the store?

  • Have white cover caps been fitted to all existing theatre bracket holes

  • Has the new theatre bracket been installed using the supplied template including self tapping fixing?

  • Has the new theatre product been installed as per installation guide

  • Take photograph of the above

  • Have both retaining bolts been fitted to the theatre product as per installation guide?

  • Take photograph of the above

  • Has the security wire been fitted as per the installation guide?

  • Take photograph of the above

  • Have new product chargers been fitted?

  • Have new foamex panels been installed as per installation guide?

  • Take photograph of the above

  • Have all cradles, lift arrows and demo products been fitted as per installation instructions

  • Take photograph of the above

  • Have all lenses and tickets been fitted level with lift arrows on V10 products and level with cradles on non V10 products as per installation guide

  • Take photograph of the above showing charging lights as per installation instructions

  • Have new base panels been fitted as per installation guide

  • Take photograph of the above

  • Has the new light box graphic been installed as per installation guide

  • Take photograph of the above

  • Take photographs of each corner of the SIS unit as per installation guide

Pre-Installation

  • Has the store visitors book been filled out and the Store Manager/Assistant Manager been contacted?

  • Has a parking disclaimer been completed

  • Are all 4 demonstration products listed on install manual available at the store?

  • Are boxes for old products available

  • Take photograph of existing fixture prior to installation clearly showing all items in theatre brackets.

Post-Installation

  • Have white cover caps been fitted to all existing theatre bracket holes

  • Have both new theatre brackets been installed using the supplied templates?

  • Take photograph of the extra bracket as installed

  • Has the new theatre product been installed as per installation guide

  • Take photograph of the above

  • Have both retaining bolts been fitted to the theatre product as per installation guide?

  • Take photograph of the above

  • Has the security wire been fitted as per the installation guide?

  • Take photograph of the above

  • What obsolete products have been returned to the store

  • Have new product chargers been fitted?

  • Have new foamex panels been installed as per installation guide?

  • Take photograph of the above

  • Have all cradles, lift arrows and demo products been fitted as per installation instructions

  • Take photograph of the above

  • Have all lenses and tickets been fitted as per installation guide

  • Take photograph of the above showing charging lights as per installation instructions

  • Have new base panels been fitted as per installation guide

  • Take photograph of the above

  • Have all 3 new light box graphics been installed as per installation guide

  • Take photographs of the above

  • Take photographs of each corner of the SIS unit as per installation guide

  • Photos uploaded WhatsApp Group

  • Installation approved by Eyelevel

  • Job Title of Signee

  • Store Manager, Product Manager or Dyson Rep

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.