Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
SIGNING IN
-
Have all trades signed the Store Visitors Book?
-
Have all trades signed the KSD Site Register?
-
Does everyone attending site have a valid CSCS Card? If no please provide details.
-
Does everyone using lifers have a valid IPAF Card? If no please provide details.
-
Has the Permit To Work been completed by KSD and ISG (Separate Copies)?
-
Is the Site Board displayed and Safety Barriers in place before work commences?
-
Take Photograph
PRE CHECK AT START OF SHIFT
-
Did all trades arrive before start time? If no please state company and arrival time.
-
Did transport arrive before start time? If no please state arrival time.
-
Have all materials and fixings been checked and any shortages reported to Mission Control within 2 hours of Shift Start time?
-
Is the Cash Tube System working prior to start of shift? Please confirm with Duty Manager. If no please provide details.
-
Are all Checkout Services Lights (Red/Green) working prior to start of shift? Please confirm with Duty Manager. If no please provide details.
-
Is the Flair Pager System working prior to start of shift? Please confirm with Duty Manager. If no please provide details.
TRANSPORT CHECKS BEFORE DRIVER LEAVES
-
Were all checkouts and SSCs removed from store securely fixed down on pallets?
-
Has all available rubbish been removed from store and loaded onto vehicle?
-
Did the driver make contact with you before leaving site?
-
Has all Main Bank Checkout IT kit been removed, boxed up and loaded on the lorry?
INSTALLATION CHECKLIST
-
Are all dimensions correct to the current drawing? If no please provide details.
-
Is the branding correctly applied to the Self Scan Checkouts?
-
Take Photograph
-
Have the Self Scan Checkout Numbers been correctly applied?
-
Take Photograph
-
Are all Tri Lights secure and undamaged?
-
Take Photograph
-
Are all Tri Lights free from scratches and the Tri Light covers secured with the twin stick provided on the back?
-
Has all Self Scan Skirting been correctly installed using fixing screws provided with no gaps in the skirting rubber?
-
Take Photograph
-
Has all floor trunking been fixed to the floor and is straight with the floor tiles.
-
Take Photograph
-
Have all been Chrome Hoops been fixed securely to the floor and black caps applied?
-
Take Photograph
-
Have all barrier rails and In-Que system been secured to the floor and installed correct to the drawing?
-
Have all Self Scan Units been secured to the floor and installed correct to the drawing? If no please provide reasons.
-
Take a photograph showing all Self Scans
-
Has the Main Bank Back To Wall (BTW) kit been correctly installed and is it free from damage?
-
Take Photograph
-
Are all Cash Tube and Power Poles secure, level and free from damage?
-
What time was End of Day completed?
-
Was the 1st Power Pole installed within 3 hours from completion of End Of Day or Week? If no please provide reason.
-
Was the 2nd Power Pole installed within 3½ hours from completion of End Of Day or Week? If no please provide reason.
-
Have all RAP Stations been installed as shown on current drawing and are they securely fixed to the floor with all dust removed?
-
Take Photograph
-
Have all de-taggers been installed securely on RAP station as shown on WGLL?<br>
-
Take Photograph
-
Have all floor holes been repaired to an acceptable standard with chips installed on any holes over 10mm diameter?
-
Have all ceiling tiles requested on the Pre Start been used?
POST INSTALLATION CHECKLIST (BEFORE SIGNING OFF ANY TRADES)
-
Is the ceiling above the work area free from dirt and hand prints?
-
Are all Main Bank Checkouts operational?
-
Is the Cashtube System operational and have test pods been sent from all new or re-located Cash Tube Stations?
-
Enter Name of Manager who witnessed pods arriving at cash office.
-
Have all access equipment and safety barriers been removed from the shop floor and returned to the service yard?
-
Take photograph as evidence to prevent HSS charging for any missing or damaged equipment.
-
Has all redundant equipment, rubbish and materials been removed from the shop floor and a final clean been completed before the installation team leave?
-
Have all trades “Signed Out” of the Store Visitors Book?
-
Take Photograph with all times visible
-
Have all Sections of the Permit To Work been completed by KSD and ISG (Separate Copies) and have they been countersigned by duty manager
-
Take Photograph
-
Have all trades “Signed Out” of the KSD Site Register?
-
Take Photograph
INSTALLATION SUMMARY
-
Were Mission Control contacted during the shift? If Yes please provide details.
-
Were there any issues that delayed the installation? If Yes please provide details.
-
Did any trades leave site without your knowledge? If Yes please specify who.
-
Any other comments :-
Signatures
-
Site Manager Signature
-
Tesco Duty Manager Signature