Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Pre Installation
-
Has the “Store Visitor’s” book been completed
-
Has the “Permit to Work” book been completed and signed by the Duty or Checkout Manager before work commences?
-
Please state name of Duty or Checkout Manager contacted before work commences
-
Number of SSC Lanes to complete on the Tesco Schedule
-
Number of SSC Lanes in the store to complete
Post Installation
-
Have all Bag Holder Extensions been installed as shown on the WGLL (What Good Looks Like) Guide and are secured with x1 clamp and x2 5mm Nylock Nuts per unit
-
Take photo front and back of each Bag Extension
-
Has all packaging or rubbish been removed from the store?
-
Has the Store Visitor’s book been completed before leaving the store
-
Take photo of above
-
Has the Permit to Work been completed and signed by the Duty or Checkout Manager after the work has been completed?
-
Take photo of above
-
Tesco Duty Manager