Information

  • Clients Name

  • Postcode

  • Clients Address
  • Installation Date

  • Crew

  • Crew Leader Full Name

SEAL UP PROCUDURE

  • • ON ARRIVAL CHECK LAYOUT OF PROPERTY, LOOK FOR CLOAKROOM/ DOWNSTAIRS TOILETS
    • INSPECT EXTERNAL AREAS OF PROPERTY FOR EVIDENCE OF VENTS/ WASTE AND SERVICES
    • WHEN SEALING UP WORK ON ONE ROOM AT A TIME, COMPLETE ALL REQUIRED WORKS BEFORE MOVING ONTO THE NEXT ROOM
    • CHECK ALL CUPBOARDS IN ALL ROOMS
    • CHECK UNDER THE STAIRS FOR AREAS OF POTENTIAL INGRESS
    • CHECK ALL INTERNAL GAS AND ELECTRIC METERS
    • CHECK AROUND AND UNDER ALL BOILERS
    • REMOVE FURNITURE/ ITEMS FROM EXTERNAL WALLS AND CHECK BEHIND
    • MOVE OUT ALL WASHING MACHINES/ TUMBLE DRYERS
    • CHECKS UNDER KITCHEN SINKS FOR GAPS AROUND WASTE PIPES
    • REMOVE BATH PANELS AND CHECK FOR GAPS AROUND WASTE AND WATER PIPES
    • CHECK AIRING CUPBOARDS AND IN AND AROUND WATER TANKS

    POTENTIAL AREAS FOR INGRESS

    1. AROUND WINDOWS
    2. WINDOWSILLS
    3. POWER SOCKETS
    4. SKIRTING BOARDS
    5. AERIAL SOCKETS
    6. UNDER KITCHEN SINKS
    7. BEHIND WASHINE MACHINES/ TUMBLE DRYERS
    8. UNDERNEATH BATHS
    9. STENCH AND WASTE PIPES
    10. SERVICE PIPES (WATER/GAS/ELECTRIC)
    11. BOILERS AND FROM AROUND FLUES
    12. GAPS IN THE INTERNAL BRICKWORK (BUILDING OR RENOVATION WORKS)


    ANY CONCERNS EVIDENCE AND CONTACT LINE MANAGER

Health And Safety

  • Is all Electrical Equipment, Access Equipment, PPE and H&S Equipment up to Standard and Suitable for Use?

  • REPORT DEFECT TO YOUR LINE MANAGER

  • What equipment is faulty, and discription of fault?

  • Equipment ID

  • Photo of equipment showing fault

  • Who have you reported the issue too?

  • Name of person reported too?

Site Details

  • Photo of Front of Property:

  • Main Heating Type

  • Secondary Heating Type

  • Access equipment required:

  • Type Of Access equipment

PRE-EXTRACTION SEAL UP PROCESS AND REPORT

  • Property Type

  • Please state type of property

  • Sub Property Type

  • Please state Sub Type

  • Livingroom

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Dinning room

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Kitchen

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check cupboards especially under the sink

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Move out machine machine and any appliances on external walls.

  • Pre-works evidence

  • Post works Evidence

  • 7/ Check around all waste pipes/ waterpipes

  • Pre-works evidence

  • Post works Evidence

  • 8/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Number of Bathrooms

  • Bathroom 1

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Remove Bath Panel check under bath

  • Pre-works evidence

  • Post works Evidence

  • 3/ Seal around Bath panel

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check around toilet/ Stench pipe

  • Pre-works evidence

  • Post works Evidence

  • 7/ Check around all waste pipes/ waterpipes

  • Pre-works evidence

  • Post works Evidence

  • 8/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Bathroom 1

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Remove Bath Panel check under bath

  • Pre-works evidence

  • Post works Evidence

  • 3/ Seal around Bath panel

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check around toilet/ Stench pipe

  • Pre-works evidence

  • Post works Evidence

  • 7/ Check around all waste pipes/ waterpipes

  • Pre-works evidence

  • Post works Evidence

  • 8/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Bathroom 2

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Remove Bath Panel check under bath

  • Pre-works evidence

  • Post works Evidence

  • 3/ Seal around Bath panel

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check around toilet/ Stench pipe

  • Pre-works evidence

  • Post works Evidence

  • 7/ Check around all waste pipes/ waterpipes

  • Pre-works evidence

  • Post works Evidence

  • 8/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Bathroom 1

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Remove Bath Panel check under bath

  • Pre-works evidence

  • Post works Evidence

  • 3/ Seal around Bath panel

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check around toilet/ Stench pipe

  • Pre-works evidence

  • Post works Evidence

  • 7/ Check around all waste pipes/ waterpipes

  • Pre-works evidence

  • Post works Evidence

  • 8/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Bathroom 2

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Remove Bath Panel check under bath

  • Pre-works evidence

  • Post works Evidence

  • 3/ Seal around Bath panel

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check around toilet/ Stench pipe

  • Pre-works evidence

  • Post works Evidence

  • 7/ Check around all waste pipes/ waterpipes

  • Pre-works evidence

  • Post works Evidence

  • 8/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Bathroom 3

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Remove Bath Panel check under bath

  • Pre-works evidence

  • Post works Evidence

  • 3/ Seal around Bath panel

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check around toilet/ Stench pipe

  • Pre-works evidence

  • Post works Evidence

  • 7/ Check around all waste pipes/ waterpipes

  • Pre-works evidence

  • Post works Evidence

  • 8/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Number of Bedrooms

  • Bedroom 1

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Bedroom 1

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Bedroom 2

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Bedroom 1

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Bedroom 2

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Bedroom 3

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Bedroom 1

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Bedroom 2

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Bedroom 3

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Bedroom 4

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • Bedroom 1

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • BEDROOM 2

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • BEDROOM 3

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • BEDROOM 4

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • BEDROOM 5

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

  • ADDITIONAL ROOMS
  • USE THIS SECTION FOR ADDITIONAL ROOMS/SPACES (UNDERSTAIRS, SPARE ROOMS ETC)

  • Type of room

  • 1/ Check all window seals and sills

  • Pre-works evidence

  • Post works Evidence

  • 2/ Check aerial points

  • Pre-works evidence

  • Post works Evidence

  • 3/ Check power sockets

  • Pre-works evidence

  • Post works Evidence

  • 4/ Check all vents

  • Pre-works evidence

  • Post works Evidence

  • 5/ Check all skirting on external walls

  • Pre-works evidence

  • Post works Evidence

  • 6/ Check all other areas for points of ingress

  • Pre-works evidence

  • Post works Evidence

  • Comments:

  • Additional Photos:

SIGN OFF

  • CUSTOMER SIGNATURE

  • CREW SIGNATURE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.