Audit Title EABU Technical Services Construction & Flowlines EHSMS10 3.6.2 Contractor Management - Crane
-
Document No. AIM
-
Conducted on
-
Client / Site: Transfield Services/Moomba
-
Location: Transfield Services Hub Yard, Moomba, South Australia
-
Prepared by George Webster
-
Auditor: Santos CRMH/CCM Field Coordinator - George Webster Auditees: Transfield Services Plant& Equipment Manager - Sasha Miric Transfield Services Equipment Coordinator - Alvin Jupp
1. Crane Equipment Number
-
1.1 Comparison check that the unique number is documented is identical on the electronic and hard copies
-
1.2 Photo Evidence
2. Crane Mobilisation/Demobilisation Form
-
2.1 Vehicle Registration is documented<br>
-
2.2 VIN Number is documented
-
2.3 Mobilisation date is documented
-
2.4 Demobilisation date is documented
-
2.5 Equipment Ownership
-
2.6 Plant Risk Assessment completed tick box confirmed
-
2.7 IVMS (In vehicle monitoring system) is installed
-
2.8 Transmittal Number is documented
-
2.9 Plant & Equipment Manager Review Completion.
-
2.9.1 Vehicle Checklist form is signed off.
-
2.9.2 Photo Evidence
3. Crane Risk Assessment
-
3.1 Vehicle Registration is documented<br>
-
3.2 Assessment team and date of Assessment documented
-
3.3 Assessment Summary
-
3.4 Service History and Schedule
-
3.5 Potential Hazards Identified<br>
-
Potential hazards Identified
- Mechanical Energy
- Stored Energy
- Working at Heights
- Kinetic Energy
- Fluid Energy
-
Potential hazards Identified
- Ergonomic Factors
- Thermal Energy
- Radiation
- Biological Hazards
- Other Hazards
-
Potential hazards Identified
- Electrical Energy
- Chemical Energy
- Noise
- Vibration
-
3.6 Risk Assessment & Control Plan
-
Risk Assessment & Control Plan
- List any uncontrolled Hazards identified from the checklist
- Risk Rating
- Control Measure required
-
3.7 Risk Assessment form is signed off.
-
3.8 Photo Evidence