Information
-
Job Number
-
Date of Seg Visit
-
Engineer Tech Code
-
Engineer
-
Post Visit Conducted on
-
Completed By
-
Origonal Job Type
-
Ladder Used
-
Location
Fault finding: Customer Feedback
-
Did the engineer discuss the Fault History with the customer?
-
Has the fault now been rectified
-
Did the Engineer carry out a physical check on the dish
-
Tm comments
Work Carried out
-
What work has been completed
- dish replaced
- lnb replaced
- Stb replaced
- Cabling replaced
- Customer Education
- Other
-
Tm Comments
Quality feedback
-
Is the problem resolved?
-
Was there anything that could have been done differently on first visit to avoid issues?<br><br>
-
Has all work been completed to a high standard?<br>
-
Cable entry hole sealed and brick burst plate used
-
Tm Comments
Customer
-
Is the customer happy with the resolution?
-
Does the customer have a good understanding of problem and actions to resolve?
-
Was aftercare promoted and card left on-site
-
Any customer issues outstanding
-
Tm Comments
Engineer
-
Does the post visit review match the completed engineer seg30 report?
-
Is there a requirement to feedback findings to engineer?
-
Tm Comments
Pictures of Visit
-
Pictures