Title Page
-
Conducted on
-
Prepared by
-
Location
TRILITY Definitions
-
TRILITY's own assessment of the site is represented by the condition scale and the criticality scale.
TRILITY Condition Assessment - Electrical and Mechanical
1 Very Good
-
Sound modern electrical and mechanical components in “as new” condition all operable and well maintained. No major investment required.
2 Good
-
As 1, but showing superficial wear and tear. Efficiency undiminished. Minor oil leaks and gland wear evident. Protective coatings still intact. Unlikely to require major overhauls or replacement within 10 years. Routine maintenance required, needs to be inspected within 5 years.
3 Moderate
-
All components functioning acceptably but showing significant wear and tear with minor failures and efficiency has diminished. Early signs of significant (rather than superficial) wear and tear, corrosion becoming apparent. No major work likely to be required within 5 years. Needs to be inspected within 5 years.
4 Poor
-
Function and/or running costs significantly affected by failures or maintenance needs, still functioning as 3 but effective life exceeded, requires major overhaul within 5 years.
5 Fail
-
Electrically unsafe, Health and Safety risk, not working or out of commission because unsafe to use, too unreliable or costly to run. Requires major overhaul or replacement within 2 years.
TRILITY Criticality Scale
-
5 Very High
-
4 High
-
3 Medium to High
-
2 Low to Medium
-
1 Low
-
0 Very Low
SA Water General Electrical Asset Condition Rating
-
The condition rating along with the associated estimated % of asset life remaining.
1 Very good 80% to 100%
-
Asset is in “as new” condition.
Sound, fully functional modern electrical equipment.
2 Good 50% to 80%
-
Initial signs of deterioration.
Sound, fully functional equipment. Minor deterioration of electrical equipment with signs of physical deterioration (e.g. minor discolouration). Deterioration has minimal impact on asset performance. Minimal short-term failure risk.
Most overhauled assets expected to return to condition grade 2.
3 Fair / Moderate 25% to 50%
-
Satisfactory condition.
Functional electrical equipment, with minor physical defects and some diminished efficiency. Appearance affected by deterioration. Minor components or isolated sections of the asset need replacement or repair, but asset still functions safely at adequate level of service.
Consider operational intervention to restore condition grade and deter further deterioration.
4 Poor 10% to 25%
-
Asset is still functional but experiencing problems due to deterioration of the asset.
Asset exhibiting significant signs of one or more of the following: physical damage, loss of insulation/potential for exposed live parts, signs of heat damage, deterioration, discolouration, physical wear and tear, corrosion and/or noise/vibration.
Replacement or refurbishment required in short term; asset barely serviceable. Intervention to restore condition grade may still be economically viable.
5 Very Poor 0% to 10%
-
Asset has failed or failure is imminent. Asset condition is having a detrimental effect on performance.
Asset exhibiting extreme signs of one or more of the following: physical damage, failure of insulation/exposed live parts, signs of excessive heat damage, deterioration, discolouration, wear and tear, corrosion and/or noise/vibration.
Urgent action necessary. Asset is unserviceable, replacement required.
TBD00 Tailem Bend General Area
-
TBD00LGT001 External Lighting Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD00LGT002 Internal Lighting Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD00LGT003 Emergency Lighting Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
TBD31 Plant Inlet
-
TBD31AIT003 Analyser-R/W Turbidity Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD31AIT004 Analyser-R/W pH Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD31FIT001 Flow Meter - Raw Water Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD31FSL002 Raw Water - Low Flow Switch Startup Year: 1999 Condition: 2 Criticality: 2
- 1
- 2
- 3
- 4
- 5
- N/A
TBD32 PAC Contact Tanks
-
TBD32LSH002 PAC Tank 1 High Level Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD32LSH003 PAC Tank 2 Low Level Switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD32LSHH004 PAC Tank 1 High High Level Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD32LSHH005 High High level switch PAC tank 2 Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD32LSL001 PAC Tank 1 Low Level Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD40 Mixing/Flocculation Structure
-
TBD40LSH011 Supernatant Pit High Level Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD41 Mixing
-
TBD41LSH002 Rapid Mix High Level Switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD41LSL001 Rapid Mix Low Level Switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD41M001 Rapid Mixer 1 Motor Startup Year: 1999 Condition: 3 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD41M002 Rapid Mixer 2 Motor Startup Year: 1999 Condition: 3 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
TBD42 Flocculation
-
TBD42AIT001 Analyser-pH Flocc Tank Inlet Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD43 Sedimentation
-
TBD43AE006 Clarifier Water Turb Analyser Sensor Startup Year: 2018 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD43FSL005 C/Water Turb No Flow Switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD43LSL003 Clarifier 1 Low Level Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD43LSL004 Clarifier 2 Low Level Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
Motor & Gearbox Sludge Suckers 1 and 2 are planned to be replaced in 2023 for Refurbishment on Time (EOL)
-
TBD43M001 Motor & Gearbox Sludge Sucker #1 Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD43M002 Motor & Gearbox Sludge Sucker #2 Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD43VSD001 Sludge Sucker 1 VSD Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD43VSD002 Sludge Sucker 2 VSD Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD43ZS001 Travel Proximity Sw Clarifier #1 East Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD43ZS002 Travel Proximity Sw Clarifier #1 West Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD43ZS003 Travel Proximity Sw Clarifier #2 East Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD43ZS004 Travel Proximity Sw Clarifier #2 West Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD44 Filtration
-
TBD44AE010 Filter Water Common Turbidity Sensor Startup Year: 2018 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44AE011 Filter 1 Turbidity Analyser Sensor Startup Year: 2018 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44AE012 Filter 2 Turbidity Analyser Sensor Startup Year: 2018 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44AE013 Filter 3 Turbidity Analyser Sensor Startup Year: 2018 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44AE014 Filter 4 Turbidity Analyser Sensor Startup Year: 2018 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44DPT005 Filter 1 Differential pressure Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44DPT006 Filter 2 Differential pressure Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44DPT007 Filter 3 Differential pressure Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44DPT008 Filter 4 Differential pressure Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44FIT001 Flow Meter - F/W Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44FSL011 Filter 1 Turb No Flow Switch Startup Year: 2018 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44FSL012 Filter 2 Turb No Flow Switch Startup Year: 2018 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44FSL013 Filter 3 Turb No Flow Switch Startup Year: 2018 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44FSL014 Filter 4 Turb No Flow Switch Startup Year: 2018 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44LIT001 Filter #1 Level trans. Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44LIT002 Filter 2 Level Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44LIT003 Filter 3 Level Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD44LIT004 Filter 4 Level Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD45 Air Scour System
-
TBD45M001 Air Scour Blower 1 Motor Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD45M002 Air Scour Blower 2 Motor Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD45PI001 Air Scour Blower 1 Output press. Startup Year: 1999 Condition: 2 Criticality: 1
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD45PI002 Air Scour Blower 2 Output press. Startup Year: 1999 Condition: 2 Criticality: 1
- 1
- 2
- 3
- 4
- 5
- N/A
TBD46 UV Disinfection System
-
TBD46AE001 Reactor #1 - Intensity Meter Startup Year: 2005 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46AE002 Reactor #2 - Intensity Meter Startup Year: 2005 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46AE003 Reactor #3 - Intensity Meter Startup Year: 2005 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46AIT001 Reactor #1 - Transmisisty Meter Startup Year: 2005 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46AIT002 Reactor #2 - Transmisisty Meter Startup Year: 2005 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46AIT003 Reactor #3 - Transmisisty Meter Startup Year: 2005 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46ES001 UV Distribution Board - Rowanco Startup Year: 2005 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46ES002 UV Distribution Board - Wedeco Startup Year: 2005 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46FE001 Reactor #1 Flow Element Startup Year: 2005 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46FE002 Reactor #2 Flow Element Startup Year: 2005 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46FE003 Reactor #3 Flow Element Startup Year: 2005 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46ME001 A/C Unit - Split System Startup Year: 2005 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
UV Lamp Wiper Reactors 1, 2, and 3 are planned to have a once off improvement in 2024.
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46MIS001 UV Lamp Wiper Reactor #1 Startup Year: 2005 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46MIS002 UV Lamp Wiper Reactor #2 Startup Year: 2005 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46MIS003 UV Lamp Wiper Reactor #3 Startup Year: 2005 Condition: 2 Criticality: 2
- 1
- 2
- 3
- 4
- 5
- N/A
-
UV HIM Module is planned to be replaced in 2023 due to end of life.
-
TBD46MISC005 UV HIM Module Startup Year: 2005 Condition: 2 Criticality: 2
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46PLC001 UV PLC Startup Year: 2005 Condition: 2 Criticality: 2
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46PWK001 UV Disinfection System Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46UV001 UV Reactor #1 Startup Year: 2005 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46UV002 UV Reactor #2 Startup Year: 2005 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD46UV003 UV Reactor #3 Startup Year: 2005 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD50 Chemical Dosing, Storage
-
Dosing Switchboard is planned to be refurbished in 2023 due to end of life.
-
TBD50ES001 Dosing Switchboard Startup Year: 1999 Condition: 3 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD50LSH001 Bund - High Level Switch Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD50LSH002 Truck Unloading Bund Level switch Startup Year: 1999 Condition: 5 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
TBD51 Alum Dosing
-
TBD51CO001 Calibration Column Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
Flow Meter - Alum will be replaced in 2022 due to end of life
-
TBD51FIT004 Flow Meter - Alum Startup Year: 1999 Condition: 3 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD51FSL005 Alum - Low Flow Switch EOL Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD51LIT001 Alum Tank 1 Level Transm. Startup Year: 1999 Condition: 1 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD51LSH003 Alum Bund Sump High Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD51VSD001 Alum Pump 1 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD51VSD002 Alum Pump 2 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD52 Coagulant Aid Dosing
-
TBD52CO002 Calibration Column Volumetric Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD52CO003 Carry Water Rotameter Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD52FIT003 Flow Meter - Coag Dosing Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD52FSL004 Coag L/ Flow Swi-.Dosing Point EOL Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD52FSL005 Coag L/ Flow Swi.Carry Water Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD52LIT001 Coag Storage Tank Level Trans Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD52VSD001 Coag Dosing Pump 1 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD52VSD002 Coag Dosing Pump 2 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD53 Fluoride Dosing
-
TBD53CO001 Fluoride Calibration column Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD53FE001 Fluoride flow meter Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD53LIT001 Fluoride Storage Tank Level Startup Year: 1999 Condition: 1 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD53LIT004 Fluoride Day Tank level Startup Year: 1999 Condition: 1 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD53LSH009 Fluoride Bund - High Level Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD53LSH010 Fluoride Tank Bund - H/ Level Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
TBD54 Lime Dosing
-
TBD54CO001 Batching service water rotameter 1 Startup Year: 1999 Condition: 4 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54CO002 Batching service water rotameter 2 Startup Year: 1999 Condition: 4 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54CO003 Carry Water rotameter 1 Startup Year: 1999 Condition: 4 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54CO004 Carry Water rotameter 2 Startup Year: 1999 Condition: 4 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54FSL007 Mix Tank 1 Low Flow Sw make up water Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54FSL008 Mix Tank 2 Low Flow Sw make up water Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54JB001 Lime switchboard Startup Year: 1999 Condition: 3 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54LE005 Mixing Tank 1 Level sensor Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54LE006 Mixing Tank 2 Level sensor Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54LSH018 Lime Sump High Level Startup Year: 1999 Condition: 5 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54PSH009 Pre Lime Pump 1 Press Switch Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54PSH010 Pre Lime Pump 2 Press Switch Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54PSH011 Post Lime Pump 1 Press Switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54PSH012 Post Lime Pump 2 Press Switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54VSD001 Pre Lime Pump 1 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54VSD002 Pre Lime Pump 2 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54VSD003 Post Lime Pump 1 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54VSD004 Post Lime Pump 2 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54VSD005 Lime Screw Feeder 1 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD54VSD006 Lime Screw Feeder 2 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD55 Ammonia Dosing
-
TBD55C001 Ammonia calibration column Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD55FE001 Ammonia Dosing - Flowmeter Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD55LI001 Ammonia Tank level sensor DP Cell Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
TBD56 Caustic Dosing
-
TBD56CO001 Volumetric Column Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD56LIT001 Caustic Storage Tank Level Startup Year: 1999 Condition: 1 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD56LSH002 Caustic Sump High Level Switch Startup Year: 1999 Condition: 5 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD56VSD001 Caustic Pump 1 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD56VSD002 Caustic Pump 2 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD57 Flocculation Aid Dosing
-
TBD57C001 Carry Water Flow Rotameter Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57C002 Volumetric Column Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57C003 Dosing point calibration column 1 Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57C004 Dosing point calibration column 2 Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57C005 Batching Water Rotameter Startup Year: 1999 Condition: 3 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
Flow Meter - Flocculation Aid is planned to be replaced in 2023 due to End of Life
-
TBD57FIT007 Flow Meter - Flocculation Aid Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57FSL003 Flow Switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57FSL007 Floc Aid Flow Switch -Dose point Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57FSL008 Floc Aid Flow Switch - Carry water Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57LE004 Level Indicator Stock tank Startup Year: 1999 Condition: 3 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57LE005 Ageing tank level probe Startup Year: 1999 Condition: 3 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57LSH001 Floc Aid Bund - High Level Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57SWB001 Flocc Aid Switch Board Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57VSD001 Floc Aid Dose Pump 1 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD57VSD002 Floc Aid Dose Pump 2 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
Variable Speed Drive Volumetric Feeder is planned to be replaced in 2023 due to End of Life
-
TBD57VSD003 Variable Speed Drive Volumetric Feeder Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
TBD58 Chlorine Dosing
-
TBD58AIT001 Chlorine Gas Leak Detector Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58FS001 #1 Booster pump flow switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58FS002 #2 Booster pump flow switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58FSL007 Chlorine Dosing F/Switch TWS Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58FSL008 Chlorine Dose F/Switch F/W Out Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58MIS007 Signal Conditioning Unit #1 Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58MIS008 Signal Conditioning Unit #2 Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58MIS009 Chlorine Shutdown sys - control panels Startup Year: 2015 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58PI001 Chlorine press C/O sw and gauge - A Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58PI003 Chlorine press C/O sw and gauge - B Startup Year: 1999 Condition: 3 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58SWB001 Chlorine switchboard Rowanco Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58SWB002 Chlorine building distribution board Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD58SWB003 Chlorine changeover panel Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
TBD59 PAC Dosing
-
TBD59C001 Balancing Tank Filling Rotameter Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD59FSL015 Pump #1 Carry Water Flow Switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD59FSL016 Pump #2 Carry Water Flow Switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD59JB001 PAC Junction Box Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD59LIT010 PAC Mix Tank 1 Level trans. Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD59LIT011 PAC Mix Tank 2 Level trans. Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD59LSH003 PAC Bulk Silo High Level Startup Year: 1999 Condition: 1 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD59LSH020 PAC Bund High Level Startup Year: 1999 Condition: 5 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD59TSH004 PAC Silo High Tempruture Swi. Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD59VSD003 PAC Dosing Pump 1 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD59VSD004 PAC Dosing Pump 2 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD61 Relift Pumping
-
TBD61LE003 Level Transmitter - Relift Chamber Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD61LS001 Level Switch Low - Relift Chamber Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD61SWB001 Relift Junction Box Startup Year: 1999 Condition: 3 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD61VSD001 Relift Pump VSD #1 Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD61VSD002 Relift Pump VSD #2 Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD61ZS001 No flow switch pump 1 Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD61ZS002 No flow switch pump 2 Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD62 Backwashing
-
TBD62FE001 Flow Meter - Backwash Startup Year: 1999 Condition: 3 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
TBD63 Treated Water Pumping
-
TBD63AIT004 Analyser - F/Water Fluoride Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD63AIT005 Analyser - F/Water Chlorine Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD63AIT006 Analyser- F/W pH Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD63AIT013 Analyser - T/W Turbidity Startup Year: 2008 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD63AIT014 Analyser - T/Water Fluoride Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD63AIT015 Analyser - T/Water Chlorine Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
Analyser-T/W pH are planned to be replaced in 2023 due to End of Life
-
TBD63AIT016 Analyser-T/W pH Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD63AIT019 Analyser - T/Water Ammonia Startup Year: 2016 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD63FE001 Flow Meter - Filtered Water Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD63FE010 Flow Meter - Treated Water Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
TBD64 Service Water System
-
Flow Meter - Service Water is planned to be replaced in 2022 due to End of Life
-
TBD64FIT001 Flow Meter - Service Water Startup Year: 1999 Condition: 4 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
TBD71 Control Building
-
TBD71ACU002 Lab Airconditioner Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
Switch Room and Control Room Airconditioners are planned to be replaced in 2022 due to End of Life
-
TBD71ACU003 Switch Room Airconditioner Startup Year: 1999 Condition: 3 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71ACU004 Control room Airconditioner Startup Year: 1999 Condition: 3 Criticality: 2
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71AREALIGHT Area Lighting Startup Year: 1999 Condition: 2 Criticality: 2
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71CCY001 Process Computor Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71CCY005 Process Computor Monitor Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71CCY006 IT Network Router Startup Year: 2015 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71CCY007 IT Network Switch Startup Year: 2015 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71CCY008 SCADA Historian Server Startup Year: 2013 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71CU001 PLC-Main Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71CU002 PLC-Backup Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71CU004 SCADAphone dialler and EDAC Backup diall Startup Year: 2010 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
Control Building's and Laboratory's Distribution Boards are planned to be refurbished in 2023 due to End of Life
-
TBD71DIS001 Control Building Distribution Board Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71DIS002 Laboratory Distribution Board Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71ELCB001 Earth Leakage CB's Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71ES001 Switchboard -Main Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
Switchboard -Essential is planned to be refurbished in 2023 due to End of Life
-
TBD71ES002 Switchboard -Essential Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71ES004 UPS Switch Board Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71ES005 IT Network Cabinet Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71FIRALM001 Fire Alarm System - Panel Startup Year: 1999 Condition: 1 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71FIRALM002 Fire Alarm System - Site Smoke Detectors Startup Year: 1999 Condition: MISSING Criticality: MISSING
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71GEN001 Standby Generator Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71PC001 SCADA Histroian Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71PC002 SCADA Server TBDS1 Startup Year: 2016 Condition: MISSING Criticality: MISSING
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD71SECLM001 Security Alarm Panel Startup Year: 1999 Condition: 1 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
PLC Switch Board is planned to be refurbished on time in 2023
-
TBD71SWB001 PLC Switch Board Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
-
UPS is planned to be replaced in 2022 due to End of Life
-
TBD71UPS001 UPS Startup Year: 2014 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
TBD72 Chlorine Building
-
TBD72ES001 Switchboard - Chlorine Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
TBD80 Treated Water Storage
-
TBD80LIT001 Treated Water Tank Level Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD80LSHH008 Treated Water HighHigh Level Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD80LSLL004 Treated Water LowLow Level Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD80SWB001 TWS Junction Box Startup Year: 1999 Condition: 2 Criticality: 5
- 1
- 2
- 3
- 4
- 5
- N/A
TBD91 Supernatant Pumping
-
TBD91FE001 Supernatant Flowmeter Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD91FSL001 Supernatant Pump #1 No Flow Switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD91FSL002 Supernatant Pump #2 No Flow Switch Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD91LIT003 Supernatant Sump Level Trans. Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD91LSLL004 Supernatant Sump Low/Low Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD91SWB001 Supernatant Junction Box Startup Year: 1999 Condition: 2 Criticality: 4
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD91VSD001 Supernatant Pump 1 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A
-
TBD91VSD002 Supernatant Pump 2 VSD Startup Year: 1999 Condition: 2 Criticality: 3
- 1
- 2
- 3
- 4
- 5
- N/A