Title Page

  • Conducted on

  • Prepared by

  • Location

Murray Bridge General Area

  • Workshop / Storage Shed

  • Area Fencing and Gates

  • Grounds

  • Access Roads

  • Safety Shower & Eye Wash # 4 & 5 Caustic

  • Safety Shower & Eye Wash # 1 & 2 Alum

  • Safety Shower & Eye Wash # 3 Chem Dosing

  • Safety Shower & Eye Wash #7 PAC

  • Safety Shower & Eye Wash #6 Chlorine

Plant Inlet, PAC

  • Pac tank bypass valve

Plant Inlet

  • Valves

  • Plant inlet pipe work

  • PRV Chamber

  • Inlet valve / Flow meter Chamber

PAC Contact Tank 1

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

  • Lifting Davit - PAC Mixer 1

  • PAC Mixer 1

PAC Contact Tank 2

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

  • Lifting Davit - PAC Mixer 2

  • PAC Mixer 2

Flocculators - Mixing - Tank 1

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

  • Rapid Mix shed / sound enclosure

  • Rapid Mix

Flocculators - Mixing - Tank 2

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

  • Rapid Mix shed / sound enclosure

  • Rapid Mix

Flocculators - Flocculation Tank 1

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

  • Flocc Mixer

Flocculators - Flocculation Tank 2

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

  • Flocc Mixer

Flocculators - Flocculation Tank 3

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

  • Flocc Mixer

Flocculators - Flocculation Tank 4

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

  • Flocc Mixer

Sedimentation / Clarifier 1

  • Davit Base Clarifier

  • Sludge Sucker

  • Travelling Bridge

  • Tube Settlers

  • Guide Rail Sludge Sucker Clarifier

  • Drive Pulley Sludge Sucker Clarifier

  • Sludge Sucker Trolley

  • Hose Sludge Sucker

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

Sedimentation / Clarifier 2

  • Davit Base Clarifier

  • Sludge Sucker

  • Travelling Bridge

  • Tube Settlers

  • Guide Rail Sludge Sucker Clarifier

  • Drive Pulley Sludge Sucker Clarifier

  • Sludge Sucker Trolley

  • Hose Sludge Sucker

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

Filter Tank 1

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

Filter Tank 2

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

Filter Tank 3

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

Filter Tank 4

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

Backwash Water Tank

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

Filtered Water Storage Tank

External Wall

  • External Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

Internal Wall

  • Internal Wall

  • Concrete Cover Survey done? Yes

  • Horizontal Cover (North)

  • Vertical Cover (North)

  • Horizontal Cover (East)

  • Vertical Cover (East)

  • Horizontal Cover (South)

  • Vertical Cover (South)

  • Horizontal Cover (West)

  • Vertical Cover (West)

  • Depth of carbonation measured?

  • Concrete coring Chloride test

  • Carbonation North

  • Carbonation East

  • Carbonation South

  • Carbonation West

  • Floor

  • Safe access (e.g. ladder, platform, toe boards)

  • Inlet Pipeworks & valve

  • Outlet Pipeworks & valve

UV Disinfection Systems

  • UV Kiosk

  • UV Chemical Cleaning Jib Crane & Hoist

  • UV Lamp Wiper Reactor #1

  • UV Lamp Wiper Reactor #2

  • UV Lamp Wiper Reactor #3

  • UV Lamp Wiper Reactor #4

  • Reactor Channel #1

  • Reactor Channel #2

  • UV Chemical Cleaning Tank

  • Channel 1 - Bank A UV Unit

  • Channel 1 - Bank B UV Unit

  • Channel 2 - Bank A UV Unit

  • Channel 2 - Bank B UV Unit

Chemical Dosing & Storage

  • General Area Bond

  • Alum Dosing

  • Cogulant Aid Dosing

  • Fluoride Dosing

  • Lime Dosing

  • Caustic Dosing

  • Chlorine Dosing

  • PAC Dosing

Buildings

'Unclassified Structure'

  • Overall Condition

  • Condition

Control Building

  • Overall Condition

  • Condition

Filtered Water Pump Station Building

  • Overall Condition

  • Condition

Chlorine Room

  • Overall Condition

  • Condition

Pump Station Building

  • Overall Condition

  • Condition

Other Building

  • Condition

Sludge Lagoon 1

  • Access Walkway

  • Site surrounding area

  • Internal/cover

  • Pipeworks

  • Other Items

Sludge Lagoon 2

  • Access Walkway

  • Site surrounding area

  • Internal/cover

  • Pipeworks

  • Other Items

Sludge Lagoon 3

  • Access Walkway

  • Site surrounding area

  • Internal/cover

  • Pipeworks

  • Other Items

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.