Information
-
Reference (site name / ED5 / date )
ED5: Digging Team Audit
-
Work Description
-
Job address
-
Job No.
-
Vehicle registration number
-
Supervisor
-
Reinstatement type
-
Contract No.
-
Work completion date
-
Audit conducted date
-
Conducted by
-
Gang name
-
Team leader
-
Personnel
Site Safety
-
Is the site tidy/good housekeeping?
-
First aid kit / eye wash available / fit for purpose / in date
-
Fire extinguisher - on site / in vehicle (min 2kg), gauge in green segment
-
Welfare - hand washing / wipes and sufficient drinking water on site
-
Ear / eye / hand protection available for every team member
-
Hi vis / hard hat / worn by all team members
-
Dust masks available for use / worn where risk exists
-
Safety footwear (laced) in good condition worn by all
-
All electrical equipment PAT tested, in date / calibrated
-
CoSHH substances identified, data sheets available
-
All lifting equipment (slings, shackles, chains) calibrated
-
Relevant PPE worn - where risk exists
-
Are all works conducted safely?
-
Site operatives wearing all correct corporate work wear
Administration
-
Induction cards available
-
Work instruction / job pack on site
-
SSRA completed for site and briefed to team(s)
-
Health and Safety Manual / Risk Assessment Manual / CoSHH manual available
-
Operatives hold all training certification / client authorisation on site
-
Qualified first aider on site
Tools and Equipment
-
Mini excavator secured with 3 straps on trailer
-
Mini ex trailer, lights / tailgate / locks / tyres all in good condition
-
Evidence of fulcrum pins being regularly greased on mini ex
-
Condition of mini ex, beacon / tracks / lights / buckets
-
Only mini ex carried on trailer, no buckets / signs etc
-
Keys left in any plant / mini ex etc.
-
Breakaway cable attached and in good condition
-
Condition of dumper if used
-
CAT - calibration date of item used on site (record all items and dates)
-
GENNY - calibration date of item used on site ( record all items and dates)
-
General condition of hand digging tools, blades / handles
-
Is marker spray / crayon available
-
Cable drum trailer, securing collars in place
-
Winch anchored and used correctly
-
STHIL saw fitted with dust suppression kit
-
Vehicles and plant in good condition and in good working order
-
Plant, equipment and materials stored safely in the vehicles
-
Plant and equipment suitable for works
Excavation works
-
Excavation suitable shored / sloped where ground ground conditions / depth requires it
-
Are ladders available for access / egress if required
-
Deep excavation, is heras fencing used and clipped together
-
All utilities marked up and beyond edge of excavation
-
Evidence of trial holes taken
-
Evidence of mechanical device used next utility
-
Are other utilities supported to prevent damage
-
Excavated materials stored away from edge (equal to depth)
-
Joint bay / trench safe to enter, size / condition / floor surface
-
Suitable / adequate ventilation in excavation (confined space)
-
Are utility plans available on site, in colour, in date, legible and relevant to the work area
Compliance with NRSWA / SLG / chapter 8
-
Works are barriered off as per COP, barriers linked
-
Lead in / out tapers in place
-
Pedestrian walkway, 1m min / 1.5m where possible
-
Traffic lights meet COP, stop / go boards available
-
Pathboards / kerb ramps secured / anchored where possible
-
Signs / barriers sand bagged
-
Apology / information board displayed
-
Works are barriered off as per COP, barriers linked
-
Correct signage in place, spacings, sizes etc.
Environmental
-
Are plant re-fuelling arrangements in place (funnel / fuel container)
-
Are trees, plants and wildlife considered in RA
-
Are measures in place to control waste or contaminated water
-
Are water gullies protected where applicable
-
Is waste material kept separate to re-use or recycle
-
Site left clean and tidy and rubbish removed
-
Comments